Planning application 99/2974

Cork - Cork County Council

Proposed Development

Alterations & extensions to licensed premises to include restaurant, stores, kitchen, office etc.,alt.to entrances & retention of ex. bar extension

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Jun 1999

  2. Decision: CONDITIONAL

    14 Oct 1999

  3. Decision due

    16 Oct 1999

  4. Grant issued

    17 Nov 1999

Application Details

Location
BUNRATTY INN, BUNRATTY INN, MAIN STREET, ARDMANAGH,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
3 June 1999
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
14 October 1999
Grant Date
17 November 1999

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
05/2588REFUSED21 Apr 2005

Construction of canopy to entrance

The Bunratty Inn Ardmanagh Schull

0m
02/2298CONDITIONAL4 Jun 2002

Alterations & reconstruction of ruined building for use as apartment for short term letting & store, roof over existing patio & storage space

BUNRATTY INN, MAIN ST, ARDMANAGH,

16m
08/1596INCOMPLETED APPLICATION1 Sept 2008

Demolish existing dwellinghouse and construct 2no. dwellinghouses

Main Street Ardmanagh Schull

16m
08/1664CONDITIONAL12 Sept 2008

Demolish existing dwellinghouse and construct 2no. dwellinghouses

Main Street Ardmanagh Schull

17m
08/767CONDITIONAL25 Apr 2008

Alterations and extension to rear of existing dwelling and all associated site works

Skull & Ardmanagh Schull

27m
14/729CONDITIONAL19 Dec 2014

Planning permission for proposed modifications to building known as the former AIB Bank, (a protected structure), including part change of use of ground floor, (from commercial to residential) and part change of use of first floor (from commercial to residential) to accommodate one apartment/dwelling unit on entire of the first floor with access through ground floor in part, also installation of new first floor window on west elevation, fenestration alterations on north/rear elevation of main building together with fenestration alterations of east elevation of single storey ancillary buildings in rear/northern yard, removal of existing external steel staircase access located in rear/northern yard together with new pedestrian gate entrance to aforementioned rear/northern yard, for access from the adjoining public road together with all ancillary site works

Former AIB Bank Main Street Ardmanagh Schull, Co Cork

28m
09/763CONDITIONAL9 Jul 2009

Installation of disabled access ramp to the main entrance and ancillary works

3 Upper Main Street Schull Co. Cork

28m
09/694INCOMPLETED APPLICATION18 Jun 2009

Installation of disabled access ramp to the main entrance and ancillary works

3 Upper Main Street Schull Co. Cork

28m
21/339WITHDRAWN25 May 2021

Re-development of the former AIB building, works are to include the following: (i) Alterations to and partial demolition of the existing building including the demolition of the rear (north) two storey annexe and north facade, the demolition of single storey outbuildings and the single storey pop-out structure on the east elevation, the removal of some external and internal walls / partitions at ground and first floor levels; (ii) Modifications to the existing building elevations including the erection of advertising banners, external lighting, signage and automatic ticket dispensing machine; (iii) The construction of a three-storey extension to the rear (north) elevation including a terrace on east and north elevations at second floor level; (iv) The change of use of the building from a bank to a multi-purpose community-use building to include film screening/theatre space, function/event space, flexible office/meeting/workshop spaces, and ancillary uses including office/reception area, storage areas, and catering facilities including kitchen and service area for food/beverages (v) The installation of street furniture, railings, and landscape works, and (vi) All other associated development works

3 Upper Main Street Ardmanagh Schull Co. Cork

28m
18/667CONDITIONAL9 Nov 2018

i.) Alterations to and partial demolition of the existing building including the demolition of the rear two storey annexe and north façade, the demolition of single storey outbuildings and the single storey pop-out structure on the east elevation, the removal of some external and internal walls / partitions at ground and first floor levels. ii.) Modifications to the existing elevations including a new entrance doorway on the western elevation, the erection of advertising banners on the front and side elevations and the removal of the existing ramp / steps as permitted under planning application reference number 09/763 and replacement with new entrance steps. iii.) The construction of a part single / part two-storey extension to the rear (north) elevation including a terrace at first floor level. iv.) The change of use of the building from a bank to an Event Centre, to include film screening room(s) / stage areas, ancillary offices, storage and archive rooms, kitchen and catering facilities including a fixed bar for catering purposes and supporting plant / utility rooms. v.) The installation of street furniture, railings and landscape works and all other associated works

AIB Building 3 Upper Main Street Ardmanagh Schull, Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?