MAGHERACLOCHER , GWEEDORE , LETTERKENNY PO
N/APlanning application 1750891
Donegal - Donegal County Council
Proposed Development
ERECTION OF AN EXTENSION, RENOVATIONS AND ALTERATIONS TO AN EXISTING DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS
Application Timeline
Application received
7 Jun 2017
Further information requested
1 Aug 2017
Application withdrawn
9 Feb 2018
Application Details
- Location
- MAGHERACLOCHER , GWEEDORE , LETTERKENNY PO
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 0.2 ha
Timeline
- Registration Date
- 7 June 2017Other applications received that week
- Status
- DEEMED WITHDRAWN
- Decision
- N/A
- Withdrawn
- 9 February 2018
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
(1) CHANGE OF USE FROM A FORMER BANK TO A HARDWARE SHOP, (2) ERECTION OF (A) A COMMERCIAL STORAGE SHED AND (B) A PERIMETER FENCE AND (3) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
MAGHERACLOGHER , GWEEDORE , LETTERKENNY PO
ERECTION OF COMMERCIAL STORAGE SHED ADJACENT TO AN EXISTING BUILDING ALONG WITH A PERIMETER FENCE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
MAGHERACLOGHER , BUNBEG , GWEEDORE
(1) CHANGE OF USE OF THE GROUND FLOOR OF AN EXISTING BUILDING KNOWN AS THE HMD BUILDING FROM A RESTAURANT TO A YOUTH AND FAMILY RESOURCE CENTRE AND (2) EXTERNAL ILLUMINATED SIGNAGE
MAGHERACLOGHER , DERRYBEG , LETTERKENNY PO
(1) CHANGE OF USE OF APPROVED COMMERCIAL UNIT TO USE AS A SINGLE DWELLING HOUSE INCLUDING CHANGES TO FENESTRATION, EXTERNAL ELEVATIONS, ROOF PROFILE AND FINISHES (2) PROVISION OF ACCOMMODATION AT FIRST FLOOR/ROOFSPACE LEVEL AS PART OF PROPOSED DWELLING UNIT WITH ASSOCIATED MODIFICATIONS TO ELEVATIONS, (3) CHANGE OF USE OF APPROVED RETAIL UNITS AT BASEMENT LEVEL TO PROVIDE 1 NO. 2 BEDROOM APARTMENTS AND 2 NO. STUDIO APARTMENTS, ONE OF WHICH TO BE USED SOLELY AS ANCILLARY ACCOMMODATION TO MAIN DWELLING UNIT (4) PROVISION OF DOUBLE GARAGE WITH HOME OFFICE OVER PART OF SAME AT FIRST FLOOR AND PROVISION OF ROOF BALCONY OF PART OF GARAGE AT FIRST FLOOR
STRAND ROAD , MAGHERACLOGHER , BUNBEG
CONSTRUCTION OF 44 NO. NEW HOTEL BEDROOMS AND GYM WITHIN A NEW 3 STOREY BLOCK, THE CHANGE OF USE OF EXISTING STORAGE AREA AT GROUND FLOOR LEVEL IN THE EXISTING 3 STOREY BLOCK TO THE REAR OF THE SITE TO PROVIDE OF 8 NO. ADDITIONAL BEDROOMS AT GROUND FLOOR LEVEL (52 NO. NEW BEDROOMS OVERALL), THE EXISTING 28 NO. HOTEL BEDROOMS ARE TO BE RENOVATED CREATING A TOTAL OF 80 NO. BEDROOMS. IT IS PROPOSED TO PROVIDE 2 NO. 2 STOREY EXTENSIONS TO THE FRONT OF THE STREET FACADE (WEST ELEVATION FRONTING THE R257) OF THE EXISTING HOTEL BAR AND RESTAURANT TO PROVIDE A CAFE AND ADDITIONAL RESTAURANT AREA AT GROUND FLOOR LEVEL AND THE CONSTRUCTION OF 2 NO. FIRST FLOOR APARTMENTS. IT IS ALSO PROPOSED TO CARRY OUT INTERNAL ALTERATIONS TO THE RESTAURANT, RECEPTION AREA, NEW TOILETS AND PLANT ROOMS AND DEMOLITION OF PART OF THE BUILDING TO REMOVE THE EXISTING NIGHTCLUB AND TOILET BLOCK TO FACILITATE THE NEW HOTEL ROOMS AND GYM. ANCILLARY CAR PARKING (94 CAR SPACES) AND COACH SET DOWN FOR PATRONS OF THE HOTEL, AND ALL ASSOCIATED SITE DEVELOPMENT AND ENGINEERING WORKS INCLUDING A NEW WASTEWATER TREATMENT PLANT NECESSARY TO FACILITATE THE DEVELOPMENT.
SEAVIEW HOTEL , MACHAIRE CHLOCHAIR , AN BUN BEAG
CONSTRUCTION OF 44 NO NEW BEDROOMS, RENOVATION OF EXISTING 36 NO HOTEL BEDROOMS, RENOVATION OF EXISTING BAR AND RESTAURANT, FIRST FLOOR APARTMENT OVER NEW GROUND FLOOR CAFE, DEMOLITION AND RECONSTRUCTION OF PART OF BUILDING TO REMOVE EXISTING NITECLUB, TOILET BLOCK TO FACILITATE NEW HOTEL ROOMS AND GYM. ANCILLARY CAR PARKING (94 SPACES) AND COACH SET DOWN FOR PATRONS OF THE HOTEL. ALL ASSOCAITED SITE DEVELOPMENT AND ENGINEERING WORKS INCLUDING A NEW WASTEWATER TREATMENT PLANT TO FACILITATE THE DEVELOPMENT.
SEAVIEW HOTEL , MACHAIRE CHLOCHAIR , AN BUN BEAG
(1) RETENTION AND COMPLETION OF EXISTING GROUNDWORKS AND (2) ERECTION OF A BOUNDARY WALL ON THE SOUTHERN SIDE OF SITE WITH ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
MAGHERACLOGHER , BUNBEG , CO DONEGAL
(1) TEACH CONAITHE AGUS GÁRAISTE A THÓGÁIL, CÓRAS CÓIREÁLA LE HITHIR SCAGAIRE SNASAITHE AGUS GACH OIBREACHA SUÍMH (2) LE DAMHLACH SEARACHAI ATÁ ANN FREASTAL AR AN TEACH CONAITHE TEAGHLACH IN AICE LÁIMHE TEAGHAIS SUITE AR AN TEORAINN THOIR THEAS A DICHOMISIUN AGUS CÓRAS CÓIREÁLA NUA A SHUITEÁIL LE ITHIR SCAGAIRE SNASAITHE
MACHÁIRE CHLOCHAIR , AN BUN BEAG , CO. DHÚN NA nGALL
ERECTION OF A PITCHED ROOF ON THE EXISTING FLAT ROOFED EXTENSION TO THE REAR OF THE EXISTING DWELLING, NEW WINDOWS TO THE REAR AND SIDE ELEVATIONS OF THIS PART OF THE DWELLING
MAGHERACLOGHER , DERRYBEG , LETTERKENNY PO
CONSTRUCTION OF A DWELLING HOUSE WITH CONNECTION TO EXISTING PUBLIC SEWER INCLUDING ALL ASSOCIATED SITE WORKS
MAGHERACLOGHER , DERRYBEG , LETTERKENNY PO
The submission window has closed
Observations on this application closed on Tuesday 11 July 2017, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?