← Back to search

NARIN SANDS CARAVAN PARK , NARIN , PORTNOO

CONDITIONAL

Planning application 1751790

Donegal - Donegal County Council

Proposed Development

1 NO. RELOCATED SERVICED MOBILE HOME HARD STAND COMPLETE WITH MOBILE HOME

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Nov 2017

  2. Decision: CONDITIONAL

    8 Nov 2018

  3. Grant issued

    19 Dec 2018

  4. Decision due

    10 Feb 2019

Application Details

Location
NARIN SANDS CARAVAN PARK , NARIN , PORTNOO
Applicant
N/A
Application Type
RETENTION
Planning Authority
Donegal County Council
Site Area
42.5 ha

Timeline

Registration Date
29 November 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
8 November 2018
Grant Date
19 December 2018
Permission Expires
18 December 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
1850488CONDITIONAL29 Mar 2018

THE UPGRADE/RENEWAL OF FOUL DRAINAGE INFRASTRUCTURE INCLUDING THE REPLACEMENT OF A DATED AND DYSFUNCTIONAL SEPTIC TANK WITH A PACKAGED PROPRIETARY WASTE WATER SEWERAGE TREATMENT PLANT, PROVISION OF A PUMPED RISING MAIN TO A PERCOLATION AREA (NONE PREVIOUSLY PROVIDED) AND PART RENEWAL OF DRAINAGE NETWORK WITH ASSOCIATED SITE-WORKS AND REMOVAL OF ONE NO. MOBILE HOME

NARIN SANDS CARAVAN PARK , NARIN , PORTNOO

0m
1950536REFUSED15 Apr 2019

PROVISION OF 1 NO. ADDITIONAL SERVICED MOBILE HOME WITH HARDSTAND AT THE SOUTHERN END OF THE EXISTING CARAVAN PARK

NARIN , PORTNOO , LETTERKENNY PO

68m
1751575CONDITIONAL19 Oct 2017

A TEN YEAR DURATION FOR DEVELOPMENT CONSISTING OF A WATER BOOSTER PUMPING STATION ON A GREENFIELD SITE APPROXIMATELY 1KM FROM THE R261 REGIONAL ROAD. THE BOOSTER PUMPING STATION WILL COMPRISE A SINGLE STOREY BUILDING TO ACCOMMODATE DUTY/STAND-BY PUMPS, A PRESSURE SURGE VESSEL AND CONTROL PANELS AND ASSOCIATED SITE WORKS AS PART OF IMPROVEMENTS TO THE REGIONAL WATER SUPPLY SCHEME. THE APPLICATION IS FOR A NEW SITE APPROXIMATELY 50M TO THE EAST OF THE SITE PREVIOUSLY GRANTED PLANNING PERMISSION UNDER PL16/50916. THE PLANNING APPLICATION IS ACCOMPANIED BY A STAGE 1 SCREENING REPORT FOR APPROPRIATE ASSESSMENT

NARAN , PORTNOO , DONEGAL P.O.

79m
1851739CONDITIONAL14 Nov 2018

(A) RETENTION OF RELOCATION OF EXISTING WINDOW AND DOOR OPENINGS AND THE INSTALLATION OF ADDITIONAL WINDOW OPENINGS TO THAT GRANTED PLANNING PERMISSION REF:02/2365, (B) CONVERSION OF THE ATTIC SPACE OF DWELLING TO LIVING ACCOMMODATION INCLUDING THE INSTALLATION OF GABLE END WINDOWS TO EACH SIDE ELEVATION OF THE SECOND FLOOR AND VELUX TYPE ROOF WINDOWS TO THE FRONT AND REAR ELEVATIONS, AND (C) RELOCATION OF THE EXISTING VEHICULAR ENTRANCE TO THE PROPERTY FROM THE ADJOINING PUBLIC ROAD

NARAN , PORTNOO , DONEGAL PO

81m
2351097CONDITIONAL26 Jul 2023

(1) EXTENSION AND RENOVATION OF EXISTING DWELLING HOUSE TO INCLUDE RAISED RIDGE HEIGHT AND ALTERATIONS TO ALL FACADES AND (2) UPGRADING OF EXISTING PERCOLATION AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

NARAN , PORTNOO , DONEGAL PO

123m
1751765UNCONDITIONAL24 Nov 2017

CONSERVATORY TO THE GABLE END OF EXISTING DWELLING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

NARAN , PORTNOO , DONEGAL P.O.

126m
1851882CONDITIONAL11 Dec 2018

(1) PART CHANGE OF USE FROM SHOP TO CAFÉ (2) EXTENSION TO REAR OF THE BUILDING TO COMPRISE OF A KITCHEN/PREP AREA WITH CONNECTION TO EXISTING SEWERAGE TREATMENT SYSTEM PREVIOUSLY GRANTED UNDER PLANNING PERMISSION 01/2047 AND (3) ALL ASSOCIATED SITE DEVELOPMENT WORKS

CLOONEY , NARAN , PORTNOO

126m
2660064CONDITIONAL22 Jan 2026

(1) CONSTRUCTION OF EXTENSION AND RENOVATION OF EXISTING DWELLING HOUSE WITH ALTERATIONS TO ALL FACADES, (2) INCREASE OF EXISTING RIDGE HEIGHT, (3) DISCONNECTION FROM EXISTING SHARED TREATMENT SYSTEM AND INSTALLATION OF A NEW STANDALONE TREATMENT SYSTEM, (4) ERECTION OF A DOMESTIC GARAGE WITH OFFICE SPACE, (5) CONSTRUCTION OF A STUDIO/GRANNY FLAT WITH CONNECTION TO PROPOSED SEWAGE TREATMENT SYSTEM AND (6) DECOMMISSIONING OF EXISTING VEHICULAR ENTRANCE TO THE NORTH OF THE SITE AND CONSTRUCTION OF A NEW VEHICULAR ENTRANCE TO THE SOUTH OF THE SITE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

NARAN , PORTNOO , LETTERKENNY PO

134m
2152186CONDITIONAL5 Nov 2021

ERECTION OF EXTENSIONS TO THE FRONT AND SIDE OF EXISTING DWELLING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

NARAN , PORTNOO , DONEGAL PO

158m
1750476CONDITIONAL30 Mar 2017

CONSTRUCTION OF AN EXTENSION TO THE SIDE OF DWELLING

NARAN , PORTNOO , DONEGAL PO

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?