MAGHERACLOGHER , BUNBEG , LETTERKENNY PO
CONDITIONALPlanning application 1950721
Donegal - Donegal County Council
Proposed Development
DEMOLITION OF EXISTING SCHOOL BUILDING (S) KNOWN AS "ARDSCOIL MHUIRE" AND THE CONSTRUCTION OF 30 NO. DWELLING UNITS (2,3,4 & 5 BEDS), CONNECTION TO EXISTING STORM DRAINAGE NETWORK ON PUBLIC ROAD (R-257-12), COLLECTION OF FOUL SEWAGE TO NEW ON SITE PUMPING STATION AND THEREAFTER PUMPED TO REAR (EAST) OF SITE INTO PROPOSED NEW 350M LONG GRAVITY FOUL SEWER IN A SOUTH EAST DIRECTION ALONG PUBLIC ROAD (L-1383-1) CONNECTING TO EXISTING FOUL SEWER AT INDUSTRIAL ESTATE ROUNDABOUT INCLUDING ALL ASSOCIATED SITE WORKS
Application Timeline
Application received
13 May 2019
Decision: CONDITIONAL
9 Jul 2020
Decision due
16 Jul 2020
Grant issued
12 Aug 2020
Application Details
- Location
- MAGHERACLOGHER , BUNBEG , LETTERKENNY PO
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 1.296 ha
- Floor Area
- 2788 sq m
- Residential Units
- 30
Timeline
- Registration Date
- 13 May 2019Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 9 July 2020
- Grant Date
- 12 August 2020
- Permission Expires
- 11 August 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
CONSTRUCTION OF A DWELLING HOUSE WITH CONNECTION TO EXISTING PUBLIC SEWER INCLUDING ALL ASSOCIATED SITE WORKS
MAGHERACLOGHER , DERRYBEG , LETTERKENNY PO
CONSTRUCTION OF 5 NO. ADDITIONAL SINGLE STOREY 2 BEDROOM DWELLING UNITS (4 NO. SEMI-DETACHED, 1 NO. DETACHED) AS A PHASE 2 TO THE PREVIOUSLY GRANTED HOUSING DEVELOPMENT UNDER PLANNING REF NO. 19/50721. PHASE 2 SHALL BE ACCESSED THROUGH AND SERVED BY EXTENDING THE APPROVED ACCESS ROAD AND SERVICES OF THE PREVIOUSLY GRANTED HOUSING DEVELOPMENT (PLANNING REF NO. 19/50721) TO INCLUDE ALL ASSOCIATED SITE DEVELOPMENT WORKS
MAGHERACLOGHER , BUNBEG , LETTERKENNY PO
AMENDMENT TO PREVIOUSLY PERMITTED HOUSING DEVELOPMENT UNDER PLANNING REF. NO. 23/51119, THE AMENDMENT CONSISTS OF THE REPLACEMENT OF 5-BED GROUP HOME WITH 2 NO. ADDITIONAL SEMI-DETACHED, 2-BEDROOM SINGLE STOREY DWELLING UNITS. THE DEVELOPMENT SHALL BE ACCESSED THROUGH AND SERVED BY EXTENDING THE APPROVED ACCESS ROAD AND SERVICES PREVIOUSLY PERMITTED UNDER PLANNING REF. NO. 19/50721 AND 23/51119 TO INCLUDE ALL ASSOCIATED SITE DEVELOPMENT WORKS
MAGHERACLOGHER , BUNBEG , LETTERKENNY PO
CONSTRUCTION OF A PHASE 2 TO PREVIOUSLY PERMITTED HOUSING DEVELOPMENT UNDER PLANNING REF. NO. 19/50721 WHICH CONSISTS OF CONSTRUCTION OF (1) 4 NO. ADDITIONAL SEMI-DETACHED SINGLE STOREY (2 BED) DWELLING UNITS AND (2) 1 NO. DETACHED GROUP HOME IN LIEU OF THAT PREVIOUSLY PERMITTED UNDER PLANNING REF NO. 19/50721. THE DEVELOPMENT SHALL BE ACCESSED THROUGH AND SERVED BY EXTENDING THE APPROVED ACCESS ROAD AND SERVICES PREVIOUSLY PERMITTED UNDER PLANNING REF. NO. 19/50721, TO INCLUDE ALL ASSOCIATED SITE DEVELOPMENT WORKS
MAGHERACLOGHER , BUNBEG , LETTERKENNY PO
EXISTING ACCESS ROAD AND ENTRANCE FROM PROPERTY ON TO THE FACTORY ROAD
ARDNAGAPPERY , DERRYBEG , CO. DONEGAL
(1) CHANGE OF USE FROM A FORMER BANK TO A HARDWARE SHOP, (2) ERECTION OF (A) A COMMERCIAL STORAGE SHED AND (B) A PERIMETER FENCE AND (3) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
MAGHERACLOGHER , GWEEDORE , LETTERKENNY PO
ERECTION OF COMMERCIAL STORAGE SHED ADJACENT TO AN EXISTING BUILDING ALONG WITH A PERIMETER FENCE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
MAGHERACLOGHER , BUNBEG , GWEEDORE
(1) CHANGE OF USE OF THE GROUND FLOOR OF AN EXISTING BUILDING KNOWN AS THE HMD BUILDING FROM A RESTAURANT TO A YOUTH AND FAMILY RESOURCE CENTRE AND (2) EXTERNAL ILLUMINATED SIGNAGE
MAGHERACLOGHER , DERRYBEG , LETTERKENNY PO
MEADÚ DE DHÁ STÓR A CHUIR LE TAOBH AN AMHAIRCLAINN INA MBEIDH (1) CISTIN AGUS MEADÚ LEIS AN BIALANN, (2) SEOMRA FUAIM, LEITHRISÍ, SEOMRA CLEACHTADH, OIFIG AGUS ÁIT STÓRAILE AR AN CHÉAD URLÁR
ARD NA GCEAPAIRÍ , NA DOIRÍ BEAGA , LEITIR CEANAINN
CONSTRUCTION OF 44 NO. NEW HOTEL BEDROOMS AND GYM WITHIN A NEW 3 STOREY BLOCK, THE CHANGE OF USE OF EXISTING STORAGE AREA AT GROUND FLOOR LEVEL IN THE EXISTING 3 STOREY BLOCK TO THE REAR OF THE SITE TO PROVIDE OF 8 NO. ADDITIONAL BEDROOMS AT GROUND FLOOR LEVEL (52 NO. NEW BEDROOMS OVERALL), THE EXISTING 28 NO. HOTEL BEDROOMS ARE TO BE RENOVATED CREATING A TOTAL OF 80 NO. BEDROOMS. IT IS PROPOSED TO PROVIDE 2 NO. 2 STOREY EXTENSIONS TO THE FRONT OF THE STREET FACADE (WEST ELEVATION FRONTING THE R257) OF THE EXISTING HOTEL BAR AND RESTAURANT TO PROVIDE A CAFE AND ADDITIONAL RESTAURANT AREA AT GROUND FLOOR LEVEL AND THE CONSTRUCTION OF 2 NO. FIRST FLOOR APARTMENTS. IT IS ALSO PROPOSED TO CARRY OUT INTERNAL ALTERATIONS TO THE RESTAURANT, RECEPTION AREA, NEW TOILETS AND PLANT ROOMS AND DEMOLITION OF PART OF THE BUILDING TO REMOVE THE EXISTING NIGHTCLUB AND TOILET BLOCK TO FACILITATE THE NEW HOTEL ROOMS AND GYM. ANCILLARY CAR PARKING (94 CAR SPACES) AND COACH SET DOWN FOR PATRONS OF THE HOTEL, AND ALL ASSOCIATED SITE DEVELOPMENT AND ENGINEERING WORKS INCLUDING A NEW WASTEWATER TREATMENT PLANT NECESSARY TO FACILITATE THE DEVELOPMENT.
SEAVIEW HOTEL , MACHAIRE CHLOCHAIR , AN BUN BEAG
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?