GLACKMORE HILL , AUGHT INISHOWEN , LIFFORD PO

CONDITIONAL

Planning application 1952025

Donegal - Donegal County Council

Proposed Development

  1. (1)
    RETENTION AND COMPLETION OF EXISTING ACCESS TRACK LEADING TO PERMITTED TURBINES (PA REG REF 16/51729 AND 16/51334)
  2. (2)
    PROPOSED TRACK-SIDE DRAINAGE AND CABLING
  3. (3)
    ALL ANCILLARY DEVELOPMENT AND ASSOCIATED SITE WORKS
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Dec 2019

  2. Decision: CONDITIONAL

    20 Feb 2020

  3. Decision due

    25 Feb 2020

  4. Grant issued

    25 Mar 2020

Application Details

Location
GLACKMORE HILL , AUGHT INISHOWEN , LIFFORD PO
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.6 ha

Timeline

Registration Date
23 December 2019Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
20 February 2020
Grant Date
25 March 2020
Permission Expires
24 March 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

738m
2662008N/A30 Oct 2026

A PERIOD OF 10 YEARS AND 40-YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING OF THE ENTIRE WIND FARM WITH THE DEVELOPMENT TO CONSIST OF (1) ERECTION OF 6 NO. WIND TURBINES, EACH WITH A GENERATING CAPACITY OF 4.26MW TO 4.80MW WITH THE FOLLOWING PARAMETERS: (A) A TOTAL TIP HEIGHT RANGE OF 150M – 202M, (B) A ROTOR DIAMETER RANGE OF 133M – 138M, AND (C) A HUB HEIGHT RANGE OF 81M TO 135M, (2) CONSTRUCTION OF 6 NO. PERMANENT WIND TURBINE FOUNDATIONS, CRANE HARDSTAND AREAS AND TEMPORARY ASSEMBLY AREAS, (3) PERMANENT UPGRADE OF 1 NO. EXISTING ENTRANCE FOR CONSTRUCTION AND OPERATIONAL ACCESS TO THE WESTERN 3 NO. WIND TURBINE PARCEL FROM THE L-18111 PUBLIC ROAD, (4) PERMANENT UPGRADE OF 1 NO. EXISTING ENTRANCE FOR CONSTRUCTION AND OPERATIONAL ACCESS TO THE EASTERN 3 NO. WIND TURBINE PARCEL FROM THE L-18111 PUBLIC ROAD, (5) PROVISION OF C.2KM OF NEW SITE ACCESS TRACKS AND UPGRADE OF C.3.4KM OF EXISTING SITE ACCESS TRACKS TO FACILITATE ACCESS TO ALL ONSITE INFRASTRUCTURE, INCLUDING PASSING BAYS AND ALL ASSOCIATED DRAINAGE, (6) CONSTRUCTION OF 3 NO. TEMPORARY CONSTRUCTION COMPOUNDS WITH ASSOCIATED TEMPORARY OFFICES, STAFF FACILITIES PARKING, STORAGE AREAS AND SECURITY FENCING, (7) PROVISION OF 1 NO. PERMANENT METEOROLOGICAL MAST OF C.125M IN HEIGHT, AND ASSOCIATED FOUNDATION AND HARD-STANDING AREA, (8) ALL ASSOCIATED WIND FARM UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING, (9) PROVISION OF 3 NO. ONSITE BORROW PITS AND PERMANENT SPOIL STORAGE AREAS, (10) CONSTRUCTION OF JOINT BAYS AND ASSOCIATED COMMUNICATION CHAMBERS, (11) TURBINE DELIVERY WORKS ALONG THE L-18111 LOCAL ROAD, (12) PROVISION OF OPERATIONAL STAGE SITE SIGNAGE, (13) PROVISION OF HABITAT ENHANCEMENT AREAS AND (14) ALL ANCILLARY APPARATUS AND SITE DEVELOPMENT WORKS ABOVE AND BELOW GROUND, INCLUDING SOFT AND HARD LANDSCAPING AND UPGRADE OF EXISTING DRAINAGE INFRASTRUCTURE. A DESIGN FLEXIBILITY OPINION ISSUED BY DONEGAL COUNTY COUNCIL ON 31ST JULY 2026 ACCOMPANIES THIS APPLICATION. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND NATURA IMPACT STATEMENT (NIS) ACCOMPANY THIS APPLICATION. THE DETAILS WHICH ARE UNCONFIRMED IN THIS APPLICATION ARE THE TURBINE TIP HEIGHT, ROTOR DIAMETER AND HUB HEIGHT. THE RANGE OF PARAMETERS UNDER WHICH THE TURBINE DIMENSIONS WILL FALL ARE SPECIFIED IN THE DESIGN FLEXIBILITY OPINION. THIS DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

AUGHT , TURE , THREE TREES LIFFORD PO

762m
1950241CONDITIONAL26 Feb 2019

A DOMESTIC GARAGE AND ALL ASSOCIATED WORKS

GLACKMORE , AUGHT , MUFF

837m
2662016N/A2 Nov 2026

ERECTION OF EXTENSION TO THE FRONT OF EXISTING DWELLING AND INSTALLATION OF THREE DORMER WINDOWS TO FRONT ELEVATION AND ANY SITE WORKS

GLACKMORE , AUGHT , QUIGLEY'S POINT LIFFORD PO

930m
1951688CONDITIONAL5 Nov 2019

ERECTION OF A DWELLING WITH CONNECTION TO PROPOSED SEPTIC TANK AND PERCOLATION AREA ALONG WITH ALL ASSOCIATED SITE WORKS

AUGHT , TURE , MUFF

930m
1951578N/A18 Oct 2019

ERECTION OF A DWELLING WITH CONNECTION TO PROPOSED SEPTIC TANK AND PERCOLATION AREA ALONG WITH ALL ASSOCIATED SITE WORKS

AUGHT , TURE , MUFF

945m
2351543UNCONDITIONAL11 Oct 2023

GRANT OF A 10 YEAR PLANNING PERMISSION FOR DEVELOPMENT OF A 14 TURBINE WIND FARM ON A SITE IN THE TOWNLAND OF AUGHT, APPROXIMATELY 5KM WEST OF QUIGLEY'S POINT. THE DEVELOPMENT WILL COMPRISE OF 14 NO ELECTRICITY GENERATING WIND TURBINES WITH A HUB HEIGHT OF 65 METRES AND A ROTOR DIAMETER OF 71 METRES GIVING AN OVERALL HEIGHT OF UP TO 100.5 METRES, HARDSTANDING, AN ELECTRICAL COMPOUND AND SUBSTATION BUILDING, ASSOCIATED SITE ROADS AND SITE WORKS. IT IS PROPOSED TO SOURCE ALL STONE FROM AN ON SITE BORROW PIT.

AUGHT , TURE , QUIGLEYS POINT

955m
2050753REFUSED12 Jun 2020

ERECTION OF A DWELLING WITH CONNECTION TO PROPOSED SEPTIC TANK AND PERCOLATION AREA ALONG WITH ALL ASSOCIATED SITE WORKS

AUGHT , TURE , MUFF

964m
2051567CONDITIONAL21 Oct 2020

ERECTION OF A DWELLING WITH CONNECTION TO PROPOSED SEPTIC TANK AND PERCOLATION AREA ALONG WITH ALL ASSOCIATED SITE WORKS & RELOCATION OF EXISTING SEPTIC TANK AND PERCOLATION AREA WITHIN THE SITE TO SERVE PARENT'S HOME

AUGHT , TURE , MUFF

1.0km
2050996CONDITIONAL24 Jul 2020

CONSTRUCTION OF A DWELLING HOUSE AND DOMESTIC OUTBUILDING WITH AN ONSITE SEWAGE SYSTEM TOGETHER WITH ALL ASSOCIATED WORKS

GLACKMORE , AUGHT , MUFF

1.0km
2151483CONDITIONAL26 Jul 2021

EXISTING MOBILE HOME ALONG WITH ALL ASSOCIATED WORKS AND PERMISSION FOR CONSTRUCTION OF A DWELLING HOUSE WITH CONNECTION TO PROPOSED SEPTIC TANK AND PERCOLATION AREA

AUGHT , TURE , MUFF