BALLYMACARRY LOWER , BUNCRANA , LIFFORD PO
N/APlanning application 2050128
Donegal - Donegal County Council
Proposed Development
- (1)MATERIAL CHANGE OF USE OF LANDS AND DISUSED SPACE WITHIN EXISTING SHEDS AS PART OF THE SMOKELESS FUEL MANUFACTURING PROCESS
- (2)STORAGE OF THE MANUFACTURED MATERIAL AND PERMISSION FOR (1) CONTINUATION OF MANUFACTURING PROCESS AND STORAGE OF SMOKELESS FUEL AND ASSOCIATED PRODUCTS, (2) DISTRIBUTION
- (3)STORAGE OF STACKED BAGGED COAL ON EXTERNAL HARDSTANDING AREA
- (4)INSTALLATION OF 3 NO. SETTLEMENT PONDS
- (5)INSTALLATION OF HYDROCARBON INTERCEPTOR
- (6)CHANGE OF USE OF FORMER FRUIT OF THE LOOM BUILDING TO A SMOKELESS FUEL MANUFACTURING SHED WITH STORAGE OF MANUFACTURED MATERIAL (SHED 2)
- (7)CONNECTION TO EXISTING SERVICES
- (8)ALL ASSOCIATED SITE WORKS
Application Timeline
Application received
7 Feb 2020
Further information requested
2 Apr 2020
Further information received
4 Feb 2021
Decision due
3 Mar 2021
Application Details
- Location
- BALLYMACARRY LOWER , BUNCRANA , LIFFORD PO
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Donegal County Council
- Site Area
- 5.49 ha
Timeline
- Registration Date
- 7 February 2020
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
- Decision Due
- 3 March 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
CONTINUATION OF THE USE OF EXISTING SHED 1 FOR THE MANUFACTURING OF SMOKELESS FUEL BRIQUETTES, WHICH WAS PREVIOUSLY PERMITTED UNDER PLANNING REFERENCE NUMBER 14/51331 AND PERMISSION FOR (1) THE STORAGE OF SMOKELESS MATERIAL AND GUARGUM USED IN THE MANUFACTURE OF THE BRIQUETTES WITHIN THE MANUFACTURING SHED 1 (2) GRADING AND STORAGE OF THE FINISHED BRIQUETTES IN AN ADJOINING SHED 2 (3) ERECTION OF AN ELEVATED COVERED CONVEYOR BELT SYSTEM BETWEEN SHEDS 1 AND 2 (4) CONSTRUCTION OF A WHEEL WASH (5) STORAGE OF BAGGED BRIQUETTES WITH WATERPROOF COVERS ON PALLETS ON THE EXISTING HARDSTAND AREA (6) INSTALLATION OF A HYDROCARBON INTERCEPTOR (7) INSTALLATION OF ATTENUATION POND (8) CONNECTION TO EXISTING SERVICES, INCLUDING SETTLEMENT TANKS PERMITTED UNDER CONDITION 3A OF PLANNING REFERENCE 14/51331 (9) PARKING OF VEHICLES ASSOCIATED WITH THE DEVELOPMENT. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
BALLYMACARRY LOWER , BUNCRANA , CO DONEGAL
(1) CONCRETE HARD STAND, (2) 2 NO. RETAIL UNITS AND (3) CONNECTION TO ALL EXISTING SERVICES AND SITE DEVELOPMENT WORKS
BALLYMACARRY LOWER , BUNCRANA , LIFFORD PO
(1) 2 NO. BAY CARWASH, (2) 2 NO. COMMERCIAL UNITS AND (3) CONNECTION TO ALL EXISTING SERVICES AND SITE DEVELOPMENT WORKS
BALLYMACARRY LOWER , BUNCRANA , LIFFORD PO
(1) CHANGE OF USE OF PART OF EXISTING BUILDING FROM SEWING FACTORY TO CALL CENTER (2) ADDITIONAL CAR-PARKING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
BALLYMACARRY LOWER , BUNCRANA , LIFFORD PO.
(1) DEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE MICA BLOCKWORK AND ERECTION OF A REPLACEMENT DWELLING AT NO. 18 AND (2) ELEVATIONAL CHANGES TO ADJOINING NO. 17 WITH CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
NOS. 17 & 18 STRAND COURT , BALLYMACARRY LOWER , BUNCRANA LIFFORD PO
CONSTRUCTION OF A STORAGE SHED AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
BALLYMACARRY LOWER , BUNCRANA , CO DONEGAL
EXTENSION TO THE FRONT OF EXISTING RETAIL PREMISES TO INCORPORATE ADDITIONAL FLOOR SPACE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
BALLYMACARRY LOWER , BUNCRANA , CO. DONEGAL
CONSTRUCTION OF A STORAGE SHED AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
BALLYMACARRY LOWER , BUNCRANA , LIFFORD PO
CONSTRUCTION OF EXTENSION TO THE FRONT OF EXISTING RETAIL PREMISES INCORPORATING ADDITIONAL FLOOR SPACE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
BALLYMACARRY LOWER , BUNCRANA , LIFFORD PO
CONSTRUCTION OF A NEW ENTRANCE LOBBY TO FRONT FACADE OF EXISTING HARDWARE STORE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
BALLYMACARRY LOWER , BUNCRANA , LIFFORD P.O.
The submission window has closed
Observations on this application closed on Thursday 12 March 2020, five weeks after it was received. The authority cannot accept a late submission.