Proposed Development
ERECTION OF A SINGLE ELECTRICITY GENERATING WIND TURBINE OF HUB HEIGHT UP TO 45M AND ROTOR DIAMETER UP TO 44M, A HARDSTANDING, CONTROL BUILDING, ASSOCIATED SITE ROADS, DRAINAGE AND SITE WORKS
Application Timeline
Application received
20 Sept 2022
Decision: UNCONDITIONAL
27 Oct 2022
Decision due
14 Nov 2022
Application Details
- Location
- ALTILOW , DONEGAL
- Applicant
- N/A
- Application Type
- EXTENSION OF DURATION
- Planning Authority
- Donegal County Council
- Site Area
- 1.1 ha
Timeline
- Registration Date
- 20 September 2022Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- UNCONDITIONAL
- Decision Date
- 27 October 2022
- Permission Expires
- 20 September 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
ERECTION OF A SINGLE ELECTRICITY GENERATING WIND TURBINE OF HUB HEIGHT UP TO 45M AND ROTOR DIAMETER UP TO 44M, A HARDSTANDING, CONTROL BUILDING, ASSOCIATED SITE ROADS, DRAINAGE AND SITE WORKS
ALTILOW , DONEGAL
(1) CONSTRUCTION OF TWO DORMER WINDOWS TO FRONT (SOUTH) ROOF AND TWO DORMERS TO REAR (NORTH) ROOF AND OTHER MINOR ELEVATIONAL CHANGES, (2) REMOVAL OF EXISTING SUNROOM AND CONSTRUCTION OF A NEW WRAP AROUND ANNEX TO THE SOUTH-EAST SIDE OF THE HOUSE, (3) PROVISION OF A NEW PORCH CANOPY TO THE REAR, (4) INTERNAL RENOVATION WORK TO INCLUDE AN ADDITIONAL BEDROOM ON THE FIRST FLOOR AND CHANGE OF USE OF FORMER SWIMMING POOL AT BASEMENT LEVEL TO A STORE, (5) DECOMMISSIONING OF EXISTING SEPTIC TANK AND PROVISION OF A NEW EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA AND (6) ALL ASSOCIATED SITE WORKS
FRIARY , LOUGH ESKE , DONEGAL PO
(1) CONSTRUCTION OF TWO DORMER WINDOWS TO FRONT (SOUTH) ROOF AND TWO DORMERS TO REAR (NORTH) ROOF AND SOME OTHER MINOR ELEVATIONAL CHANGES, (2) REMOVAL OF EXISTING SUNROOM AND CONSTRUCTION OF A NEW WRAP AROUND ANNEX TO THE SOUTH-EAST SIDE OF THE HOUSE, (3) PROVISION OF A NEW PORCH CANOPY TO THE REAR, (4) INTERNAL RENOVATION WORK TO INCLUDE AN ADDITIONAL BEDROOM ON THE FIRST FLOOR AND CHANGE OF USE OF FORMER SWIMMING POOL AT BASEMENT LEVEL TO A STORE, (5) DECOMMISSIONING OF EXISTING SEPTIC TANK AND PROVISION OF A NEW EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA AND (6) ALL ASSOCIATED SITE WORKS
FRIARY , LOUGH ESKE , DONEGAL PO
ERECTION OF A DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
GREENAN , LOUGH ESKE , DONEGAL TOWN PO
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?