Proposed Development
- (1)ERECTION OF
- (A)UP TO 32 CONTAINERS TO HOUSE LITHIUM-ION BATTERIES OR SIMILAR TECHNOLOGY CIRCA 14.0M LENGTH, 2.44 WIDE AND 2.9 HIGH FOR ELECTRICITY STORAGE
- (B)A HARDSTAND COMPOUND AREA SURROUNDED BY A 2.6M HIGH PALISADE FENCE
- (C)BATTERY ENERGY STORAGE SYSTEM (BESS) CONTROL BUILDING
- (D)SYNCHRONOUS CONDENSER COMPOUND COMPRISING OF A HORIZONTAL SYNCHRONOUS GENERATOR POSITIONED WITHIN A BUILDING, CONTROL BUILDING AND AIR COOLING
- (E)INTERNAL CABLE TO CONNECT THE FACILITY TO THE EXISTING CLOGHER 110KV SUBSTATION
- (A)
- (2)GRID CONNECTION WILL BE VIA THE EXISTING 110KV CLOGHER SUBSTATION
- (3)OTHER ANCILLARY INFRASTRUCTURE AT THE COMPOUND CONSISTING OF CCTV POLES, PARKING FACILITIES AND LIGHTING. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
Application Timeline
Application received
16 Dec 2022
Application withdrawn
20 Jan 2023
Application Details
- Location
- CULLIONBOY , BARNESMORE , DONEGAL PO
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 3.42 ha
Timeline
- Registration Date
- 16 December 2022
- Status
- WITHDRAWN
- Decision
- N/A
- Withdrawn
- 20 January 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
ALTERATIONS TO EXISTING DWELLING HOUSE TO INCLUDE CHANGES TO WINDOWS ON THE SIDE AND REAR ELEVATIONS, A NEW GABLED DORMER WINDOW ON THE FRONT ELEVATION AND A CAR PORT TO THE REAR WITH ALL ASSOCIATED SITE WORKS
CULLIONBOY , BARNESMORE , DONEGAL PO
CONSTRUCTION OF A SINGLE-STORY EXTENSION & DOMESTIC GARAGE TO THE SIDE OF THE EXISTING DWELLING AND ALL ANCILLARY SITE WORKS NECESSARY
KEADEW LOWER , BARNESMORE , DONEGAL PO
ERECTION OF A SINGLE STOREY EXTENSION & DOMESTIC GARAGE TO THE SIDE OF THE EXISTING DWELLING AND ALL ANCILLARY SITE WORKS NECESSARY
KEADEW UPPER , BARNESMORE , DONEGAL PO
CONSTRUCTION OF A SINGLE-STORY EXTENSION & DOMESTIC GARAGE TO THE SIDE OF THE EXISTING DWELLING AND ALL ANCILLARY SITE WORKS NECESSARY
KEADEW LOWER , BARNESMORE , DONEGAL PO
CONSTRUCTION OF A DWELLING WITH INTEGRAL GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
KEADEW UPPER , BARNESMORE , DONEGAL PO
TWO STOREY EXTENSION TO THE REAR OF EXISTING TWO STOREY HOUSE AND ALL ASSOCIATED SITE WORKS
CULLIONBUOY , BARNESMORE , DONEGAL PO
CONSTRUCTION OF A DWELLING HOUSE WITH INTEGRAL GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
KEADEW UPPER , BARNESMORE , DONEGAL PO
CHANGE OF USE OF THE EXISTING BARNESMORE COMMUNITY CENTRE TO A MONTESSORI SCHOOL AND COMMUNITY CENTRE
KEADEW UPPER , BARNESMORE , DONEGAL PO
CHANGE OF USE OF THE EXISTING BARNESMORE COMMUNITY CENTER TO A MONTESSORI SCHOOL AND COMMUNITY CENTRE
KEADEW UPPER , BARNESMORE , DONEGAL PO
CONSTRUCTION OF A SINGLE STOREY STEEL FRAMED WORKSHOP SHED, DEVELOPMENT OF STONED TURNING / PARKING AREA, WIDENING OF THE EXISTING ACCESS LANE AND ENTRANCE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
DRUMINNIN , DONEGAL PO , CO. DONEGAL
The submission window has closed
Observations on this application closed on Saturday 28 January 2023, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?