← Back to search

FINCASHEL , PETTIGO , DONEGAL PO

N/A

Planning application 2661667

Donegal - Donegal County Council

Proposed Development

  1. (1)
    RETENTION AND COMPLETION OF ADDITIONAL FLOOR AREA PROVIDED IN MANUFACTURING AREA AND ALL ASSOCIATED SITE WORKS
  2. (2)
    ALTERATIONS AND EXTENSION TO EXISTING LIGHT ENGINEERING WORKSHOP CURRENTLY UNDER CONSTRUCTION, APPROVED UNDER PLANNING REF. NO. 25/60275, TO PROVIDE OFFICE AND ANCILLARY ACCOMMODATION
  3. (3)
    CONNECTION TO EXISTING TREATMENT PLANT SERVICING THE ADJACENT ENVIRO GRIND COMPLEX, IN LIEU OF THE APPROVED WASTEWATER TREATMENT PLANT APPROVED UNDER PLANNING REF. NO. 25/60275
  4. (4)
    ALL ASSOCIATED SITEWORKS INCLUDING REVISION TO PARKING ARRANGEMENTS AND SURFACE WATER DRAINAGE NETWORK TO ACCOMMODATE PROPOSED EXTENSION
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    8 Sept 2026

  2. Decision due (upcoming)

    2 Nov 2026

Application Details

Location
FINCASHEL , PETTIGO , DONEGAL PO
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
19400 ha

Timeline

Registration Date
8 September 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
2 November 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

21m
2560199N/A18 Feb 2025

CONSTRUCTION OF A LIGHT ENGINEERING WORKSHOP FOR THE FABRICATION, ASSEMBLY AND MAINTENANCE OF EQUIPMENT, WITH ASSOCIATED SITEWORKS SUCH AS PARKING, DRAINAGE SYSTEMS, LANDSCAPING AND THE PROVISION AND DIVERSION OF EXISTING SERVICES, INCLUDING AN OVERHEAD ELECTRICITY CABLE

FINCASHEL , PETTIGO , CO. DONEGAL

21m
2560275CONDITIONAL27 Feb 2025

CONSTRUCTION OF A LIGHT ENGINEERING WORKSHOP FOR THE FABRICATION, ASSEMBLY AND MAINTENANCE OF EQUIPMENT AND VEHICLES WITH ASSOCIATED SITEWORKS, INCLUDING SITE PARKING, VARIOUS DRAINAGE SYSTEMS, NEW PROPRIETARY WASTEWATER TREATMENT SYSTEM AND ANCILLARY PERCOLATION AREA, RAINWATER HARVESTING TANK, FIREFIGHTING WATER RESERVOIR TANK, LANDSCAPING, BOUNDARY FENCE AND THE PROVISION AND DIVERSION OF EXISTING SERVICES, INCLUDING AN OVERHEAD ELECTRICITY CABLE AND ALL ANCILLARY WORKS

FINCASHEL , PETTIGO , DONEGAL PO

107m
2661128N/A17 Jun 2026

(1) REMOVAL / DEMOLITION OF EXISTING WORKSHOP BUILDING AND BAGGING LINE BUILDING TO FACILITATE AN EXTENSION TO THE EXISTING SORTING SHED, (2) CONSTRUCTION OF NEW INDUSTRIAL BUILDING FOR MATERIAL PROCESSING, SCREENING, STORAGE, HANDLING, TRANSFER, BLENDING TOGETHER WITH ALL ANCILLARY PLANT AND MACHINERY AND (3) ALL ANCILLARY SITE DEVELOPMENT WORKS

FINCASHEL , PETTIGO , DONEGAL PO

146m
1750366CONDITIONAL13 Mar 2017

(1) EXTENSION TO THE EXISTING YARD TO THE SOUTH WESTERN BOUNDARY TO PROVIDE LORRY TURNING AND STORAGE SPACE WHICH WILL INCLUDE A LANDSCAPED EARTH EMBANKMENT WITH 1.80m FENCE TO THE SAID BOUNDARY; (2) STAND ALONE TOP SOIL STORAGE SHED TO THE WESTERN PART OF THE SITE; (3) A LEAN TO EXTENSION TO THE FRONT GABLE END OF THE EXISTING COMPOSTING STORAGE SHED AND (4) IN SITU CAST BIO-FILTER STRUCTURE TO THE NORTH SIDE ELEVATION OF THE EXISTING COMPOSTING STORAGE SHED ALONG WITH ALL ASSOCIATED SITE WORKS

FINCASHEL Td , PETTIGO , DONEGAL PO

147m
1951314CONDITIONAL28 Aug 2019

(1) THE REDUCE LEVEL DIG TO THE NORTH WESTERN BOUNDARY FOR ACCESS TO AN INCREASED BIO FILTER (ODOUR CONTROL SYSTEM) (2) CHANGE OF USE FROM EXISTING STORAGE SHED TO ENGINEERING WORKSHOP (3) EXTENSION OF THE MAIN STORAGE SHED TO PROVIDE ADDITIONAL WOODCHIP AND BIOMASS PROCESSING AREA (4) EXTENSION OF EXISTING REINFORCED BOUNDARY WALL (5) UNDERGROUND STORM WATER ATTENUATION & SETTLEMENT TANK AND TO INCLUDE ALL ASSOCIATED SITE WORKS

FINCASHEL , PETTIGO , DONEGAL PO

148m
2150194CONDITIONAL9 Feb 2021

RETENTION OF (1) EXTENSION TO THE EXISTING OFFICE, LOCATED ALONG THE SOUTH EASTERN BOUNDARY, WHERE SAME EXTENSION IS IN THE FORM OF TWO PREFABRICATED UNITS (2) THREE PREFABRICATE UNITS FOR USE AS; CANTEEN, STAFF WELFARE AND OFFICE STORE, ALL OF WHICH ARE LOCATED TOWARDS THE SOUTH EASTERN CORNER OF THE SITE (3) GENERAL STORAGE UNIT, IN THE FORM OF STEEL LORRY CONTAINER, LOCATED AT SOUTH EASTERN CORNER OF THE SITE (4) GENERAL STORAGE UNIT, IN THE FORM OF STEEL LORRY CONTAINER, LOCATED APPROXIMATELY MID WAY ALONG THE SOUTH WESTERN BOUNDARY (5) PREFABRICATED SWITCHROOM / COMMS. UNIT, LOCATED TOWARDS THE NORTH EAST BOUNDARY, AT THE REAR OF THE MAIN STORAGE / PROCESSING SHED AND PERMISSION FOR (1) CONSTRUCTION OF A CONCRETE BUILD MV SUBSTATION BUILDING AND ASSOCIATED SWITCHROOM (2) ALL ANCILLARY SITE DEVELOPMENT WORKS

FINCASHEL , PETTIGO , DONEGAL PO

148m
2251327CONDITIONAL3 Aug 2022

(1) INTENSIFICATION OF THE EXISTING COMPOSTING AND WASTE RECOVERY ACTIVITIES FROM AN ANNUAL TONNAGE OF 25,000 TONNES TO 150,000 TONNES, (2) UPGRADING OF THE EXISTING SURFACE WATER DRAINAGE INFRASTRUCTURE, AN UPGRADED ON-SITE WASTEWATER TREATMENT SYSTEM (OSWTS) WITH SOIL POLISHING FILTER, (3) PROVISION OF ADDITIONAL CAR PARKING AREA AND (4) ALL ANCILLARY SITE DEVELOPMENT WORKS. A LICENCE FROM THE ENVIRONMENTAL PROTECTION AGENCY IS REQUIRED FOR THIS ACTIVITY. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) ACCOMPANIES THIS APPLICATION

FINCASHEL , PETTIGO , DONEGAL PO

149m
2150088CONDITIONAL27 Jan 2021

(1) 3 BAY EXTENSION TO THE SOUTH WEST SIDE OF THE EXISTING MAIN STORAGE / PROCESSING SHED (2) REVISED SITE BOUNDARY, TO INCLUDE AN EXTENSION TO THE EXISTING YARD TOWARD THE NORTH WEST OF THE SITE (3) UPGRADED REPLACEMENT OF THE EXISTING BIOFILTER, WHERE SAME STRUCTURE COMPRISES OF CONCRETE RETAINING WALLS, AN ASSOCIATED MONO-PITCH ROOFED SHED MEASURING 69.4M LONG AND ASSOCIATED INFRASTRUCTURE (4) ALL ANCILLARY SITE DEVELOPMENT WORKS

FINCASHEL , PETTIGO , DONEGAL PO

431m
2151560CONDITIONAL4 Aug 2021

CONSTRUCTION OF A PORTAL FRAMED SHEEP SHED, WITH STORAGE TANK BELOW, CONCRETE APRON TO INCLUDE ALL ASSOCIATED SITE WORKS

DRUMGUN , PETTIGO , CO. DONEGAL

432m
2151462N/A21 Jul 2021

CONSTRUCTION OF A PORTAL FRAMED SHEEP SHED, WITH STORAGE TANK BELOW, CONCRETE APRON TO INCLUDE ALL ASSOCIATED SITE WORKS

DRUMGUN , PETTIGO , CO. DONEGAL

Affected by this application?

Open for submissions
27days left to make a submission

Observations close on Monday 12 October 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.

Check if you have grounds — free

Two questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?