71, Cabra Drive, Cabra, Dublin 7
GRANT PERMISSIONPlanning application 2007/21
Dublin - Dublin City Council
Proposed Development
Planning permission is sought for single storey extension to front, side and rear of existing house and all associated site works.
Application Timeline
Application received
7 Jan 2021
Decision due
3 Mar 2021
Decision: GRANT PERMISSION
3 Mar 2021
Grant issued
22 Apr 2021
Application Details
- Location
- 71, Cabra Drive, Cabra, Dublin 7
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 449.12 ha
Timeline
- Registration Date
- 7 January 2021
- Status
- Decision Notice Issued
- Decision
- GRANT PERMISSION
- Decision Date
- 3 March 2021
- Grant Date
- 22 April 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The development consists of two storey side extension, single storey rear extension and attic conversion with dormer to rear roof slope and all associated site works.
67, Cabra Drive, Dublin 7
Planning Permission for conversion of existing attic space comprising of modifications of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear, at 48 Annamoe Road, Cabra, Dublin 7.
48, Annamoe Road, Cabra, Dublin 7
The development will consist of demolition of existing shed to rear, new single storey extension to side and rear of existing dwelling.
78 Cabra Drive, Cabra, Dublin 7
The development will consist of the renovation and extension of the existing 2-storey dwelling to include (i) demolition of an existing rear single-storey extension and detached garage (ii) construction of new part single-storey extension with flat roof and rooflights to the rear and side and part two storey pitched roof extension with rooflights to the rear and side (iii) single storey pergola structures to the rear (iv) internal modifications (v) provision of an Air-To-Water Unit to the side (vi) hard landscaping works to the side and rear (vii) all associated ancillary site works necessary to facilitate the development.
8, Cabra Drive, Cabra East, Dublin 7 D07 YT63
PERMISSION : Development will consist of the demolition of the existing ground floor kitchen, part of the gable wall portions of the rear external wall, some internal walls and the hipped portion of the existing roof. We intend to construct an extension to include (1) a two storey extension to the rear and side of the property, (2) extend the hipped roof over the new two storey side extension (3) a ground floor extension to the existing lounge / dining area along the rear elevation, (4) a new patio flush with ground floor level (5) various internal alterations.
18, Cabra Drive, Dublin 7 . D07 KW59
The proposed development will consist of (i) modifications to internal layout incorporating a change of use from permitted internal storage area to retail use which will include for the sale of alcohol for consumption off the premises (i.e. part off-licence use) within the overall permitted retail unit, where the floor area for the part off-licence use is 16.4sqm and is ancillary to the primary retail use; (ii) an associated increase in the net retail floor area of the store by 25.9sqm bringing it to a total of 95.1sqm and resulting in the removal of condition No. 2 on the grant of permission under An Bord Pleanála Reference: PL29N.112437 (Dublin City Council Ref: 1511/99) relating to the net retail area; (iii) modifications to station forecourt to include the construction of 4no. EV charging spaces, with associated EV chargers, an ESB metering cabinet, modular sub-unit and new signage; (iv) the relocation of existing signage and lighting; (v) the construction of a new external storage compound (16.5sqm) to the rear of retail building; and (vi) all other associated site development works.
Circle K Service Station, 146 Cabra Road, Dublin 7, D07 XY8E
A 1-storey to rear & 2-storey to side extension, total area 56 sq.m, to provide dining, sitting, kitchen at ground level, bedroom & bathroom at first floor. Works include minor internal alterations, modifications to front, side, rear elevations, demolition existing garage, 4 no. velux to rear, attic conversion to store, house roof extended to gable end at side & all associated site development works.
21, Cabra Drive, Cabra East, Dublin 7
RETENTION: The development will consist of the retention of existing detached single storey external revolution laundry kiosk with ancillary logos and instructional advertising as constructed located to the north east side of existing petrol station forecourt and all associated site works.
Circle K, 146 Cabra Road, Dublin 7
RETENTION: The development will consist of the retention of existing detached single storey external "revolution" laundry kiosk with ancillary logos and instructional advertising as constructed located to the north east side of existing petrol station forecourt and all associated site works.
146, Cabra Road, Dublin 7
RETENTION: The development will consist of the retention of existing detached single storey external "revolution" laundry kiosk with ancillary logos and instructional advertising as constructed located to the north east side of existing petrol station forecourt and all associated site works.
Circle K, 146 Cabra Road, Dublin 7
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?