No. 3 Ailesbury Road, Ballsbridge, Dublin 4
GRANT PERMISSIONPlanning application 2076/20
Dublin - Dublin City Council
Proposed Development
PROTECTED STRUCTURE: The development will consist of refurbishment works to an existing three storey dwelling house including the following works: (a) Repointing, repair and restoration of all existing brickwork and stonework and restoration of original sash windows and wrought iron handrails. (b) Repair and restoration works to existing main roof, fascia's and soffits to include re-slating with existing sound slates and new natural slates, replacement of non-original rooflight, renewal of central lead gutter valley, and works to chimneys including removal of non-original render and repair and re-pointing or re-rendering of chimney brickwork, flashings and flaunching's. (c) Repair/replacement of existing gutters, downpipes and soil and vent pipes. Provision of hygroscopic insulation to attic. (d) Removal of fibre cement tiles from mono-pitched porch roof and provision of standing seam zinc roof to same pitch. (e) Removal of cement render from west (side) and south (rear) elevations and re-rendering with lime render. Provision of a new timber French door with glass guarding to rear elevation. (f) Removal of existing lower ground floor level floor and installation of limecrete floor with under-floor heating. Removal of dry-lining from the inner face of the external lower ground floor walls, provision of (calcium silicate boards and (please remove this as we are just doing lime plaster) lime plaster where required. (g) Replacement of warped timber floors on upper ground floor level and pinning up of decorative plasterwork ceilings. Replacement of non-original stone and ceramic floor tiles. (h) Minor alterations to interior layout to include changing main bathroom to bedroom at landing level and provision of ensuite to first floor bedroom as well as refurbishment and replacement of non-original bathroom and kitchen fittings and finishes and general redecoration of interior surfaces. (i) upgrading of electrical and mechanical services to the entire house. (j) Landscaping works to the front and rear gardens including repairing and restoration of boundary iron railings and gates and stone pillars, the existing entrance gates to be motorized (k) associated conservation works, site works and ancillary works.
Application Timeline
Application received
20 Jan 2020
Decision: GRANT PERMISSION
12 Mar 2020
Decision due
13 Mar 2020
Grant issued
22 Jun 2020
Application Details
- Location
- No. 3 Ailesbury Road, Ballsbridge, Dublin 4
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 850.91 ha
Timeline
- Registration Date
- 20 January 2020
- Status
- Decision Notice Issued
- Decision
- GRANT PERMISSION
- Decision Date
- 12 March 2020
- Grant Date
- 22 June 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
PROTECTED STRUCTURE: Planning permission for works to include: (a) single storey 62.5 sqm glazed extension to the rear (north) and reconfiguration of the internal spaces at ground floor; (b) conversion of existing 26.86sqm single storey detached structure to the rear (north) of the garden for use as day room with associated WC together with associated works at the existing three storey semi detached dwelling at 10 Ailesbury Road, A Protected Structure (RPS ref. 57)
10 Ailesbury Road, Ballsbridge, Dublin 4, D04 K4V8
PROTECTED STRUCTURE: Planning permission for works and alterations to a semi-detached protected structure: to include, demolition of 2 no. 1970’s conservatories to the rere, reconfiguration of basement to provide kitchen, dining, living; and utility to include boiler relocation, and underfloor heating to part of basement only; making good to rere elevation; reconfiguration of top floor small front bedroom as ensuite bathroom and walk in wardrobe; refitting 2 no. top floor bathrooms; refitting upper ground floor mezzanine as servery; replacement of electrical services; upgrading of mechanical services; general redecoration and maintenance; repairs to brickwork; weathering gutters; re-weathering of porch roof; upgrading drainage; conservation of existing front railings; below ground automation of existing gates; reinstatement of terrace to rere; to generally include incidental and ancillary works. Previous planning ref. 1328/75; 0614/99; 0355/20.
15 Ailesbury Road, Ballsbridge, Dublin 4.
PROTECTED STRUCTURE: Permission for development consisting of a new side extension to east gable at first and second floor returns of 17 Ailesbury Road ( A Protected Structure), Dublin 4 D04 T9Y3. The works will comprise of a new bedroom and ensuite at first floor return linked to existing staircase via new hall with laundry room off and new ensuite to the second floor return level opening off existing bedroom 4. The proposed new works will be constructed above an existing 2 storey return extension. Works will include roof repairs to the existing front porch, new windows to the side return and extending all mechanical and electrical services. New drainage works will connect to the existing system with minor associated landscaping works.
17, Ailesbury Road, Dublin 4
PROTECTED STRUCTURE: Emer & Pat Gunne intend to apply for permission for development consisting of a new side extension to east gable at first and second floor returns of 17 Ailesbury Road ( A Protected Structure), Dublin 4 D04 T9Y3. The works will comprise of a new bedroom and ensuite at first floor return linked to existing staircase via new hall with laundry room off and new ensuite to the second floor return level opening off existing bedroom 4. The proposed new works will be constructed above an existing 2 storey return extension. Works will include roof repairs to the existing front porch, new windows to the side return and extending all mechanical and electrical services. New drainage works will connect to the existing system with minor associated landscaping works.
17, Ailesbury Road, Dublin 4
Demolition of existing rear extensions and construction of new rear extension to ground floor and 5m2 extension to first floor level, internal alterations and all associated site works
11, Merrion View Avenue, Dublin 4
PROTECTED STRUCTURE: The development will consist of a 5m high by 18m long rebound ball wall adjacent to the existing sports pavilion.
St. Michael's House, Ailesbury Road, Dublin 4
PROTECTED STRUCTURE: The development will consist of a 5m high by 18m long rebound ball wall adjacent to the existing sports pavilion and the works are situated in the curtilage of St. Michaels House (A Protected Structure)
St Michael's College, Ailesbury Road, Dublin 4
PROTECTED STRUCTURE : The proposed development is for pitch lighting to the three playing pitches on the school campus and will consist of: 5 no. 18.3m lighting poles to the main synthetic pitch no.1, 6 no. 18.3m high lighting poles to the main grass pitch no. 2 and 4 no. 15m high lighting poles to the synthetic training pitch no.3. The proposed works are situated within the curtilage of a protected structure, St. Michaels House. A Natura Impact Statement has been prepared in respect of the proposed development.
St Michael's College, Ailesbury Road, Dublin 4
PROTECTED STRUCTURE: The development will consist of works to both Primary (Junior) School and Post-Primary (Senior) School buildings. Works to the Junior School consist of partial demolition, material alterations, development and propose: The construction of a new 2 storey classroom block on the footprint of an existing play area providing: 6 no. new classrooms, pre-school classroom, staff room, associated resource rooms and reception with a new rooftop play area and two storey connection to the existing 2 storey school block. The demolition of existing single storey pre-fabricated classrooms and a single first floor classroom to the north facade of existing 2 storey school block; construction of a new single storey General Purpose Hall, 2 no classrooms, associated storage rooms, enclosed courtyard and biodiversity garden and reconstruction of 1st floor classroom with connection to existing 2 storey school block. Works to the Senior School consist of partial demolition, material alterations, new development and propose: The demolition of an existing prefab single storey swimming pool building and circulation staircase. Construction of new 2 storey extension to existing school comprising 4 no. Science Laboratories, associated preparation rooms, additional resource room along with a replacement circulation staircase; construction of first floor office and resource room over existing ground floor single storey classroom; construction of new student garden and seating areas. Provision of 2 new coach parking spaces within the campus boundary to south of pavilion building adjacent to Nutley Avenue Campus Entrance. All works situated within the curtilage of a protected structure, St. Michaels House.
St. Michael's College, Ailesbury Road, Dublin 4
PROTECTED STRUCTURE: The development will consist of a single storey pool hall to accommodate a 5 lane 25 metre swimming pool, two communal changing rooms, entrance lobby, storage, sanitary facilities, ancillary accommodation and associated plant and drainage infrastructure. Site works consist of a new paved forecourt with 4 car parking spaces, the widening of the existing service road and the erection of a new fence to the north of the proposed poolhall to replace existing. All works are situated within the curtilage of a protected structure, St. Michaels House.
St. Michaels College, Ailesbury Road, Dublin 4
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?