Site at 65 Clanbrassil Street, Dublin 8, D08 RX5N, and to the rear of 66, Clanbrassil Street, Dublin 8, D08 RX5N
APPLICATION DECLARED INVAPlanning application 2152/21
Dublin - Dublin City Council
Proposed Development
The development will consist of the provision of 34 new residential apartments, comprising 12 no. studio units, 9 no. 1-bed units and 13 no. 2-bed units. The development is planned in two buildings, the front building presenting a new frontage over four levels to Clanbrassil Street. The rear building is planned over five levels, including a setback penthouse level. A bridge lings the two buildings. A communal residents' roof garden is proposed on the roof of the front building. A communal residents' courtyard is proposed at the ground floor between the buildings. All communal plant, bin storage and bicycle parking for 64 no. bicycles is proposed at ground level. The demolition of an existing single storey shed on site (c. 90 sq.m) is proposed to enable the works. The development is accessed for residents from Clanbrassil Street. Total site area is 1,168 sq.m and the development Gross Internal Area is 2,644 sq.m.
Application Timeline
Application received
3 Feb 2021
Decision: APPLICATION DECLARED INVA
10 Feb 2021
Decision due
30 Mar 2021
Application Details
- Location
- Site at 65 Clanbrassil Street, Dublin 8, D08 RX5N, and to the rear of 66, Clanbrassil Street, Dublin 8, D08 RX5N
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 1167.95 ha
Timeline
- Registration Date
- 3 February 2021
- Status
- Decision Notice Issued
- Decision
- APPLICATION DECLARED INVA
- Decision Date
- 10 February 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The development will consist of the provision of 34 new residential apartments, comprising 12 no. studio units, 9 no. 1-bed units and 13 no. 2-bed units. The development is planned in two buildings, the front building presenting a new frontage over four levels to Clanbrassil Street Lower. The rear building is planned over five levels, including a setback penthouse level. A bridge links the two buildings. A communal resident's roof garden is proposed on the roof of the front building. A communal resident's courtyard is proposed at the ground floor between the buildings. All communal plant, bin storage and bicycle parking for 64 no. bicycles is proposed at ground level. The demolition of an existing single storey shed (c. 90 sq.m) on the site, to the rear of 65/66 Clanbrassil Street Lower is proposed to enable the works. The development is accessed for residents from Clanbrassil Street Lower. Total site area is 1,168 sq.m and the development Gross Internal Area is 2,644 sq.m.
Site to the side/rear of 65, 66 &, 66A, Clanbrassil Street Lower, Dublin 8, D08 RX5N
Planning permission is sought for: 1. Demolition of existing warehouse storage unit (total area 590 sqm), lean-to storage unit (total area 86 sqm) and covered open storage (total 89 sqm). 2. Construction of new pitched roof warehouse storage unit (total area 900 sqm) and all associated site works.
136 South Circular Road, Dublin 8
Alterations to an existing house including the construction of a single storey extension to the rear
118, South Circular Road, Dublin 8 D08 VHW0
Alterations to an existing house including the construction of a single storey extension to the rear.
118, South Circular Road, South Circular Road, Dublin 8
The development will consist of the installation of an ATM machine to the existing shop front west elevation.
40, Lower Clanbrassil Street, Christchurch, Dublin 8
RETENTION: the development consists of retention of (1) alterations and amendments made during construction to elevations and floor plan layouts of existing four storey over basement terraced building (2) re-arrangement of first and second floors to incorporate 2 no. 1 bed apartments, (3) domestic storage and services room to roof attic area all from that previously granted under planning permission ref No. 2006/14.
58, Lower Clanbrassil Street, Dublin, 8.
RETENTION & PERMISSION: The development consists of retention of alterations and amendments made during construction to elevations and floor plan layouts of existing three storey over basement terraced building and permission is being sought for (1) re-arrangement of first floor layout for 1 bed apartment; (2) re-arrangement of second floor layout as studio apartment and (3) removal and amendments of existing unauthorised roof front facade and ancillary site works from that previously granted under planning permission ref. no. 2006/14.
58, Clanbrassil Street Lower, Dublin 8
Change of use of first and second floors of existing licenced premises from existing bar/lounge area (at first floor) and existing storage rooms & ancillary accommodation (at second floor) to new guest accommodation to provide 7 no. guest bedrooms with ensuite bathrooms at first floor & 6 no. guest bedrooms with ensuite bathrooms at second floor (total 13 guest bedrooms) & ancillary storage accommodation. To include material alterations to facilitate works inc. new accommodation/escape stairs, remodelled entrance lobby at ground floor, and associated internal layout changes & external alterations, inc. alterations to fenestration, alterations to roof, removal of redundant services & chimneys etc. as indicated on dwgs to facilitate same, at "The Headline Bar", located at the junction of 57 Clanbrassil Street Lower & South Circular Road, Dublin 8, D08 HC79.
The Headline Bar , Junction of 57 Clanbrassil Street Lower & South Circular Road, Dublin 8, D08HC79
development will consist of alternations to previously permitted development permission ref. 5059/23 to comprise of flat roof extension to rear of second floor level and alterations to previously permitted 2nd floor layout to provide 2 additional ensuite guest bedrooms to 2nd floor, increasing 2nd floor bedrooms from 6 bedrooms to 8 bedrooms (total of 15 no. Bedrooms in overall development), to include all associated material internal and external alterations to facilitate works as indicated on drawings.
The Headline Bar, 57 Clanbrassil Street Lower and South Circular Road, Dublin 8, D08 HC79
Planning Permission at this site at 5-6 Rosedale Terrace, 41 Rear of 42 and 42a Clanbrassil Street Lower, Dublin 8. The development will consist of construction of additional 2 no. floor levels with balconies (provision of a 2nd floor residential extension finished in brick and render and a 3rd floor residential extension finished in dark-coloured metal cladding) to existing two storey apartment block to provide a total of 13 no. apartment units consisting of 2 no. studio apartments, 7 no. one-bedroom apartments and 4 no. two-bedroom apartments. The development also includes the provision of balconies to the rear and front elevations at 1st floor level of the existing two storey building, all ancillary site works, green roof and drainage infrastructure to facilitate the development.
5-6, Rosedale Terrace, 41 Rear of 42 and 42a Clanbrassil Street Lower, Dublin 8
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?