Unit 69, Moyle Road, Dublin Industrial Estate, Glasnevin, Dublin 11
APPLICATION DECLARED INVAPlanning application 2316/19
Dublin - Dublin City Council
Proposed Development
The development will consist of the change of use from a fruit preparation and packaging facility to a Pirate Studios recording studio.
Application Timeline
Application received
21 Feb 2019
Decision: APPLICATION DECLARED INVA
26 Feb 2019
Decision due
17 Apr 2019
Application Details
- Location
- Unit 69, Moyle Road, Dublin Industrial Estate, Glasnevin, Dublin 11
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 2258.64 ha
Timeline
- Registration Date
- 21 February 2019
- Status
- Decision Notice Issued
- Decision
- APPLICATION DECLARED INVA
- Decision Date
- 26 February 2019
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The development will consist of the change of use from a fruit preparation and packaging facility to a Pirate Studios recording studio.
Unit 69, Moyle Road, Dublin Industrial Estate, Dublin 11
RETENTION: The development will consist of the retention of an existing catering trailer, currently in use as cafe/deli, incorporating facilities for the preparation, sale and consumption of hot and cold food on and off the premises.
Unit 61 Nore Road, Dublin Industrial Estate, Dublin 11
RETENTION. The development consists of the retention of an existing catering trailer, currently in use as Cafe/Deli, incorporating facilities for the preparation, sale and consumption of hot and cold food on and off the premises.
Unit 61 Nore Road, Dublin Industrial Estate, Dublin 11
The development will consist of proposed modification to the previously permitted Build to Rent residential development (permitted under Reg. Ref. 3308/20; ABP Ref. 309366-21). The proposed modifications will include: (a) The omission of the existing Cabra Pigeon Racing Club building from the application site; (b) Associated modifications to the site boundaries to accommodate the exclusion of the Cabra Pigeon Racing Club building from the application site; (c) Modifications to the internal layout, elevations, and roof level (including roof terrace) of the previously permitted Block B including reduction in its footprint. (d) Block B shall now comprise of 44 no. apartments consisting of 43 no. 1-bedroom apartments and 1 no. 2-bedroom apartment in a five-storey building with balconies to the north and south elevations (previously permitted five storey building containing a total of 49 no. apartments comprising of 48 no. 1 beds, 1 no. 2 beds with balconies to the south elevations); (e) Minor amendments to the layout of the previously permitted basement level and courtyard area; (f) No changes are proposed to the previously permitted Block A or retail unit; (g) All associated site and engineering work necessary to facilitate the proposed development. (h) The proposed development will now consist of a total of 64 no. apartments (69 no. apartments previously permitted) comprising 46 no. 1-bedroom units and 18 no. 2-bedroom units, with ancillary residential amenities and support facilities over a basement level car park.
76, 76G & 280 Bannow Road, Cabra , Dublin 7
The development consists of the construction of an ESB Substation with LV Switch room at a proposed residential development. Works also include all associated site development works.
76, 76G, 280 Bannow Road, Cabra West, Dublin 7, D07 DH04
For a temporary 5 year permission for a change of use of part of the building to a proposed micro-brewery and all associated site works and fit out works at 27a Moyle Road, Dublin Industrial Estate, Glasnevin, Dublin 11. The proposed development comprises the temporary change of use of part of the existing building to use as a microbrewery for the production of beer. Proposed internal and external works to facilitate the change of use include: a) The construction of ramps and steps for personal and delivery access; b) The creation of a new ope in the northern elevation for personal access; and c) Internal works and fit out consisting of the removal of internal walls and the installation of brewhouse and fermentation plant, ancillary brewers lab, canteen and brewer's office, and WC facilities, and all associated development and works.
Unit 27a, Moyle Road, Dublin Industrial Estate, Dublin 11
Temporary 5 year permission . The proposed development comprises the temporary change of use of part of the existing building to use as a microbrewery for the production of beer. Proposed internal and external works to facilitate the change of use include the construction of ramps and steps for personal and delivery access; the creation of a new ope in the northern elevation for personal access and internal works and fit out consisting of the removal of internal walls and the installation of brewhouse and fermentation plant, ancillary brewer's lab, canteen and brewer's office and WC facilities and all associated development and works.
Unit 27a, Moyle Road, Dublin Industrial Estate, Glasnevin, Dublin 11
PERMISSION : A temporary 5 year permission . The proposed development comprises the temporary change of use of part of the existing building from food production and storage to use as a microbrewery for the production of beer. Proposed internal and external works to facilitate the change of use include the construction of ramps and steps for personal and delivery access; the creation of a new ope in the northern elevation for personal access; and, internal works and fit out consisting of the removal of internal walls and the installation of brewhouse and fermentation plant, ancillary brewers lab, canteen and brewer's office, and WC facilities, and all associated development and works.
27a Moyle Road, Dublin Industrial Estate, Glasnevin, Dublin 11
The proposed development will consist of modifications to the previously permitted build to rent residential development (permitted under Reg. Ref. 3308/20; ABP Ref. 309366-21). The proposed modifications consist of the following : (a) the provision of a new set back penthouse level at fourth floor level to Block A consisting of 4 additional apartments (4 no. 2 bedroom units) with balconies to the south elevation. Block A shall now be a 5 storey building comprising of a total of 24 no apartments (3 no. 1 bedroom units and 21 no. 2 bedroom units), (b) the provision of 2 additional floors (fifth floor and sixth floor levels) to Block B consisting of 20 no. 1 bedroom units with balconies to the south and east elevations. Block B shall be a 7 storey building comprising of a total of 69 no. apartments (68 no. 1 bedroom units and 1 no. 2 bedroom unit) with communal open space at roof level., (c) modifications to courtyard level to provide an additional 16 no. bicycle parking spaces, (d) modifications at basement level including an additional motorcycle parking space and changes to the ancillary residential amenity spaces, plant room and refuse store, (e) provision of a new community use unit at lower ground floor level/basement level, which will use the existing separate access from the eastern boundary of the application site providing access onto Bannow Road, (f) all associated site development works required to facilitate the development. The proposed development will now consist of a total of 93 no. apartments (69 no. apartments previously permitted) comprising 71 no. 1 bedroom units and 22 no. 2 bedroom units, with ancillary residential amenities and support facilities over a basement level car park and a community use unit accessed from the existing laneway to the east of the site via Bannow Road. The subject site is bonded by Bannow Road to the South, 'The Coach House' and Hamilition Square to the west, Broombridge LUAS stop and maintenance depot to the north and a gated service laneway to the east.
76, 76G & 280 Bannow Road, Cabra, Dublin 7
The proposed development will consist of the construction of a 'Build to Rent' residential development comprising of 69 no. apartments (51 no. 1 beds, 18 no. 2 beds) in 2 no. blocks, to be provided as follows: Block A - a four storey building containing a total of 20 no. apartments comprising of 3 no. 1 beds, 17 no. 2 beds with balconies to north, south and east elevations with ancillary residential amenity facilities including concierge and residential lounge at ground level; Block B - a five storey building containing a total of 49 no. apartments comprising of 48 no. 1 beds, 1 no. 2 beds with balconies to south elevations; a single level basement comprising a total of 33 no. car parking spaces, 3 no. motorcycle spaces. 148 no. bicycle parking spaces (128 no. spaces at basement level and 20 no. spaces at ground floor level), ancillary plant room and refuse storage areas; along with a play/ activity room, gym facility, utility room in support of the Build to Rent ancillary residential amenities and support facilities; vehicular and pedestrian access will be onto Bannow Road. Construction of a basement level social & community centre/ non-residential club (Class 10) unit for the relocation of the Cabra Pigeon Racing Club which will maintain its separate access from the eastern boundary of application site providing access onto Bannow Road. The double height retail unit located at 76 Bannow Road will be modified with a new roof structure, extension and modification to front elevation (south), modifications to north east and west elevations, signage and internal floor area and will be integrated into Block A of the development proposal; Landscaping, boundary treatment, drainage, signage, green roofs and solar pv panels to roof level of Blocks A and B and all associated site and infrastructure works necessary to facilitate the development. The proposed development will also consist of the demolition of the existing two-storey building located at 280 Bannow Road (known as the Alma Hygiene building together with a kickboxing club) the partial demolition of the existing of single storey warehouse unit and racing pigeon club unit at 76 Bannow Road (known as the Dublin Circus Centre & Cabra Racing Pigeon Club building) and the demolition of all associated structures on site in order to facilitate the development.
76 & 280 Bannow Road, Cabra, Dublin 7
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?