← Back to search

Henry Grattan Extension Building, Dublin City University, Glasnevin, Dublin 11

GRANT PERMISSION

Planning application 2406/21

Dublin - Dublin City Council

Proposed Development

The development will comprise the change of use of the bank unit at the ground floor level (211.3sq m) to educational use.

Application Timeline

  1. Application received

    16 Mar 2021

  2. Decision due

    10 May 2021

  3. Decision: GRANT PERMISSION

    10 May 2021

  4. Grant issued

    22 Jun 2021

Application Details

Location
Henry Grattan Extension Building, Dublin City University, Glasnevin, Dublin 11
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
250.26 ha

Timeline

Registration Date
16 March 2021
Status
Decision Notice Issued
Decision
GRANT PERMISSION
Decision Date
10 May 2021
Grant Date
22 June 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

154m
WEB1545/24GRANT PERMISSION3 May 2024

Planning permission for alterations to the existing gable roof to accommodate an attic stairs to allow conversion of the attic into a non-habitable storage space with dormer window and roof window to the rear along with two roof windows to the front and a gable window to the side with all associated ancillary works.

42, Albert College Park, Dublin 9

177m
3011/22REFUSE RETENTION PERMISSI6 Jan 2022

RETENTION: Retention Planning Permission to permanently retain a previously permitted temporary site entrance/access gate (Planning Reg. Refs. 3804/11 & 4179/16) on the Collins Avenue frontage of the Dublin City University Glasnevin Campus (located to the eastern side of the Nano-bioanalytical Research Facility).The site entrance access gate will be retained to facilitate, on a limited, managed and controlled basis, access/egress for maintenance, services and construction traffic and activities in support of DCU's ongoing Capital Development Program. The site entrance/gate will also operate from time to time to facilitate access/egress to and from the DCU Glasnevin Campus for specific events, activities and emergency access requirements. It is not intended to use the site entrance/access gate for normal and regular access to the DCU Glasnevin Campus on a daily basis.

Collins Avenue frontage at Dublin City University (DCU) Glasnevin Campus, Glasnevin, Dublin 9

197m
2686/20GRANT PERMISSION11 May 2020

Development will consist of the following: Site clearance of temporary car park and partial demolition of boundary wall.The construction of a 5 storey (9140sqm floor area) general teaching, health and human performance, STEM and administration building comprising exercise studio, research and teaching laboratories, information technology suites, general teaching spaces, staff and subject area offices, sanitary facilities, changing rooms, waste storage areas, basement plant and screened plant at high level. • External works include upgrade to landscaping to full perimeter of building (overall site area 0.49 ha) consisting hard landscaping, plant beds, trees and external furniture, upgrade to existing campus access road surface, reinforced grass access route from Collins Avenue to gas skid with access gates and fencing, 1 no parking bay to be created on Collins Avenue for maintenance access. • All associated site development site services and landscaping works.

DCU Glasnevin Campus, Collins Avenue, Dublin 9

197m
4316/22APPLICATION DECLARED INVA27 Jun 2022

Alterations to the previously approved Reg. Ref. 0380/98 as follows: (i) the omission of condition 2 which reads as follows: The number of children to be cared for and the hours of operation shall not exceed that specified in the letter dated 06/04/98 submitted as part of the application. REASON: To protect the amenities of the residential properties in the vicinity. No physical works are proposed to the crèche building or the grounds.

Magic Days Creche and Montessori School , at Car Park 2 (West of the Helx) Dublin City University , Glasnevin , Dublin 9 . D09 Y998 .

198m
4405/22GRANT PERMISSION6 Jul 2022

Alterations to the previously approved Reg. Ref. 0380/98 as follows: (i) the omission of condition 2 which reads as follows: The number of children to be cared for and the hours of operation shall not exceed that specified in the letter dated 06/04/98 submitted as part of the application. REASON: To protect the amenities of the residential properties in the vicinity. No physical works are proposed to the creche building or the grounds.

Magic Days Creche & Montessori School, Car Park 2 (West of the Helix), Dublin City University, Glasnevin, Dublin 9, D09 Y998

200m
2408/21GRANT PERMISSION18 Mar 2021

Alterations to a previously granted Planning Permission (Ref no. 2686/20). The application requests the removal of Condition No.3 of a previously issued grant of Planning Permission, which relates to construction of a 5 storey (9140 sqm floor area) general teaching, health and human performance, stem and administration building. Condition No.3 requires that the applicant shall 'incorporate a physical link at ground floor level via the proposed atrium of the proposed building providing for a pedestrian route from the existing campus northwards onto Collins Avenue where a doorway will be provided'. This application proposes that there be no external access from the atrium onto Collins Avenue.

DCU Glasnevin Campus, Collins Avenue, Dublin, D9

200m
2352/21APPLICATION DECLARED INVA8 Mar 2021

Alterations to a previously granted planning permission (Decision Order no. P3743) at DCU Glasnevin Campus: The application requests the removal of Condition No. 3 of a previously issued grant of Planning Permission, which relates to construction of a 5 storey (9140 sqm floor area) general teaching, health and human performance, stem and administration building. Condition No. 3 requires that the applicant shall 'incorporate a physical link at ground floor level via the proposed atrium of the proposed building providing for a pedestrian route from the existing campus northwards onto Collins Avenue where a doorway will be provided'. This application proposed that there will be no external access from the atrium onto Collins Avenue.

DCU Glasnevin Campus, Collins Avenue, Dublin, D9

201m
WEB2042/24GRANT RETENTION PERMISSIO27 Aug 2024

lean-to roof to side passage (6sq.M) and glazed rooflight to roof at front

32, Albert College Avenue, Glasnevin, Dublin 9, D09 WH54

207m
2491/21GRANT PERMISSION29 Mar 2021

The proposed development comprises new solar panels and new safety guard-railing on existing flat roof and extension in height of two existing rooftop service enclosures to accommodate new Air Handling Units and associated works.

The Marconi Building, Glasnevin Campus, Dublin City University, Collins Avenue, Glasnevin, Dublin 9

208m
5483/22GRANT PERMISSION20 Dec 2022

Permission is sought for a single storey extension to the front & rear, a first floor extension to the side and an attic conversion to a storage room to include a dormer window to the rear roof surface and 3no. flat roof windows to the front roof surface.

678 Collins Avenue Extension, Whitehall , Dublin 9

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?