Unit 14, Block 3, Ballyboggan Business Centre, Dublin 11 D11 AK80
GRANT RETENTION PERMISSIOPlanning application 2464/21
Dublin - Dublin City Council
Proposed Development
RETENTION: Retention is sought for the following items. 1) To retain the change of use from electrical warehouse , reception, office's and canteen area to a café incorporating kitchen area at ground floor level, small take away counter at ground floor level to front of unit and seating area at first floor level for café customer's only. 2) To retain the take away facility which is part of the overall change of use at ground floor of unit. 3) To retain the opening times of new café Monday to Thursday 8.30am until 5pm, Friday and Saturday 8.30am until 10pm inclusive. 4) All work has been carried out to Unit 14, Block 3, Ballyboggan Business Centre, Dublin 11, Eircode is D11 AK80.
Application Timeline
Application received
25 Mar 2021
Further information requested
19 May 2021
Further information received
9 Nov 2021
Decision due
6 Dec 2021
Decision: GRANT RETENTION PERMISSIO
6 Dec 2021
Appeal submitted
10 Jan 2022
Grant issued
10 May 2022
Appeal decided: GRANT RETENTION PERMISSION
10 May 2022
Application Details
- Location
- Unit 14, Block 3, Ballyboggan Business Centre, Dublin 11 D11 AK80
- Applicant
- N/A
- Application Type
- Retention Permission
- Planning Authority
- Dublin City Council
- Site Area
- 92.58 ha
Timeline
- Registration Date
- 25 March 2021
- Status
- Appeal Decided
- Decision
- GRANT RETENTION PERMISSIO
- Decision Date
- 6 December 2021
- Grant Date
- 10 May 2022
An Coimisiún Pleanála Appeal
- Appeal Reference
- ABP-312409-22
- Decision
- GRANT RETENTION PERMISSION
- Submitted
- 10 January 2022
- Decided
- 10 May 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The development will consist of the following: (1) for a change of use for the existing light industrial unit to a facility for the recovery, storage and transfer of non-hazardous, commercial industrial and household bulky skip waste, (2) weighbridge in external rear yard area; (3) all ancillary site services. This activity will be applied for with a new waste facility permit application, under the Waste Management (Facility Permit and Registration) Regulations 2023 - as amended.
Unit 3A Ballyboggan Business Centre, Glasnevin, Dublin 11
The development will consist of the following: (1) For a change of use for the existing light industrial unit to a facility for the recovery, storage and transfer of non-hazardous, commercial, industrial and household bulky skip waste, (2) weighbridge in external rear yard area, and (3) all ancillary site services. This activity will be applied for with a New Waste Facility Permit Application, under the Waste Management (Facility Permit and Registration) Regulations 2023 - as amended.
Unit 3A Ballyboggan Business Center, Glasnevin, Dublin 11
Permission to demolish the former Ormond Printworks building, associated outbuildings and water tank off the Ratoath Road, D11 HY83.
The former Ormond Printworks Building, off the Rathoath Road, Dublin 11 D11 HY83
Permission for development at Unit 1 the Talbot, the 8th Lock, Ratoath Road, Dublin 11, D11 TD2P: The proposed development is a change of use of an existing vacant ground floor ofice unit (c. 416 sqm GFA), from Own Door Office use (Class 3) to Healthcare/ Medical use (Class 8) and all associated and ancillary site works, including changes to the front and side façade, provision of a dedicated outdoor area fronting on to Ratoath Road and new access from the existing carpark. The proposed changes to the façade fenestration are introduction of 3no single doors and a number of openable and fixed windows.
Unit 1, The Talbot, The 8th Lock, Ratoath Road, Dublin 11, D11 TD2P
Permission for development at a site (c. 0.04 ha) at the The Cope, 8th Lock, Ratoath Road and Hamilton View, Pelletstown, Dublin 11. Otherwise bounded generally by Ratoath Road to the east, Tolka Valley Park and Royal Canal House to the north-west, Hamilton Walk and Hamilton View to the west and the Royal Canal and 8th lock bridge to the south. The proposed development comprises a change of use of an existing ground floor unit (c. 229 sqm GFA) from own door office to cafe/restaurant use (c. 229 sqm GFA). And all associated and ancillary site works, including internal cafe/restaurant fitout works and floor plan reconfiguration to accommodate customer seating area (c. 147.4 sqm), new kitchen, customer and staff welfare facilities, fire escape corridor, kitchen ventilation and odour/smoke treatment system; 3no. external ventilation louvres; 1no. sliding windowpane service hatch (c. 82 sqm); outdoor customer seating area (c. 69sqm) and external ground floor signage (c. 2.94 sqm).
The Cope, 8th Lock, Ratoath Road and Hamilton View, Pelletstown, Dublin 11
Permission for an attic conversion with dormer window to the rear of the existing two storey semi-detached dwelling to Include the removal of the existing hip roof to the side and change to a gable end roof. New Window to the side elevation at attic stairs level and to include ancillary works at 26 Ashington Mews, Navan Road, Dublin 7. D07 YR8C.
26, Ashington Mews, Navan Road, Dublin 7, D07 YR8C
Proposed side/rear single storey extension with associated internal & external alterations, stove chimney flue. Rear first floor level extension with 2No. side bay windows. Front porch single storey extension with alteration of existing pitch roof to flat roof with alteration of existing front ground level living room window opening. Side facade first floor level shower room window opening, alteration of existing rear bathroom window opening, pedestrian gateway access to side boundary wall to back garden all with associated site development works to dwelling house.
2A, Ashington Mews, Navan Road, Dublin 7, D07 XF89
Permission for development on a c. 0.637 Ha site at Tolka Industrial Park, Ballyboggan Road, Dublin 11, D11 HF57 (Vacant Site Register Ref. VS-0457). Works are also proposed to discharge wastewater and attenuated surface water via separate 225mm diameter pipe networks of approximately 100m length each to the public wastewater and surface water sewer networks respectively, which are located at the junction with Ballyboggan Road, to the north of the development site. These works will be carried out on existing road carriageway, incorporating an area of c.0.083 Ha. The development site area and drainage works areas will provide a total application site area of c. 0.72 Ha. The development will principally consist of: the demolition of the existing derelict warehouse structure (c. 1,084 sq m) and associated outbuildings (c. 417 sq m) and the construction of a mixed-use development (13,490 sq m) comprising office accommodation (7,353 sq m); a cafe/service unit (252 sq m); and 71 No. apartments (24 No. 1 bed units, 40 No. 2 bed units and 7 No. 3 bed units) with an ancillary residential amenity/work hub (170 sq m). The development is principally provided in 2 No. blocks as follows: Block A (office) to the north of the site will be 6 No. storeys (over part basement) in height; and Block B (residential) to the south of the site will be part 8-part 9 No. storeys in height with external deck access. The development will also include 2 No. single storey bicycle stores; the provision of a vehicular access and a secondary emergency vehicular access to the east of the site; a pedestrian/bicycle connection along the eastern boundary of the site from the Royal Canal towpath to the south to the access road to the east; 40 No. car parking spaces (including 2 No. disabled parking spaces); 2 No. motorcycle spaces; bicycle parking; bin storage; private balconies/terraces on the apartments predominantly facing south and west; public and communal open spaces; hard and soft landscaping; boundary treatments; green roof; PV panels; plant; plant enclosure, lift overrun and stair core at roof level; 2 No. ESB substations and 2 No. switchrooms; lighting; signage; and all other associated site and development works above and below ground. A Natura Impact Statement has been prepared in respect of the proposed development.
Tolka Industrial Park, Ballyboggan Road, Dublin 11, D11 HF57
RETENTION: The development consists of retention of telecommunications antenna and ancillary equipment and cabinet at roof level.
1, Royal Canal House, Royal Canal Park, Pelletstown, Dublin, 15
Permission is sought to replace half-hip on main roof with a full gable roof, replace existing rear half- hip roof with new lean-to roof and construct new flat-roof dormer window extension to rear.
15 Ashington Court, Ashtown, Dublin 7
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?