Proposed Development

The development will consist of: Demolition of an existing single storey building and construction of a new two storey building with a footprint of 14.9m by 5.6m. The building will consist of concrete foundations, blockwork walls, an external cladding and plaster finish, a trapezoidal roof, an internal concrete stairs and an external steel stairs. The building will be subdivided into a production area and store at ground floor level and an office and store rooms at first floor level. The building will be connected to the site's existing storm drainage and electrical services.

Application Timeline

  1. Application received

    16 Apr 2019

  2. Decision due

    10 Jun 2019

  3. Decision: GRANT PERMISSION

    10 Jun 2019

  4. Grant issued

    18 Jul 2019

Application Details

Location
Irish Tar & Bitumen Suppliers,, Alexandra Road,, Dublin 1.
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
11266.51 ha

Timeline

Registration Date
16 April 2019
Status
Decision Notice Issued
Decision
GRANT PERMISSION
Decision Date
10 June 2019
Grant Date
18 July 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
WEB2497/24GRANT PERMISSION14 Nov 2024

Removal of the existing Tank 3 (378.5 tonnes bitumen) and installing Tank 4C (198.45 tonnes bitumen), also adding horizontal walkway from Tank 2 to portion of spiral stair on Tank 4C and another horizontal walkway linking Tank 4B to Tank 4C.

Alexandra Road, Dublin Port, Dublin 1, D01 R5W7

0m
WEB2469/24APPLICATION DECLARED INVA11 Nov 2024

The Development consists of: Removal of the existing Tank 3 (378.5 tons bitumen) and installing Tank 4C (198.45 tons bitumen), also adding horizontal walkway from Tank 2 to portion of spiral stair on Tank 4C and another horizontal walkway linking Tank 4B to Tank 4C.

Irish Tar & Bitumen Suppliers, Alexandra Road, Dublin Port, D01 R5W7

0m
4152/19GRANT PERMISSION7 Oct 2019

The development consists of: Removal of three bitumen storage tanks of size 60 tonne, 80 tonne & 500 tonne and installation of four bitumen storage tanks of size 50 tonne, 235 tonne, 235 & 15 tonne. Also included is the modification of an existing electrical plant building, modifications include installation of a staircase and additional floor to the building. The new floor of the building will be used as an electrical plant room and will raise the height of the building from approximately 4 metres to 7.3 metres.

Irish Tar & Bitumen Suppliers,, Alexandra Road,, Dublin 1.

242m
4115/19GRANT PERMISSION1 Oct 2019

The development will consist of the removal of a redundant fire water storage tank of 7.6m in diameter and 7.5m in height with a volume of approximately 340m3 and the installation of a new bitumen storage tank of 3.37m in diameter and 17.3m in height with a volume of approximately 100m3.

Lagan Materials Ltd., Alexandra Road, Dublin Port, Dublin 1

244m
3733/20GRANT PERMISSION13 Nov 2020

The development will consist of the installation of a new bitumen storage tank of 30m in diameter and 19.2m in height with a volume of approximately 11,300m3 and the installation of an aromatic oil tank of 8m in diameter and 12.8m in height with a volume of approximately 600m3. A concrete containment area will also be installed around the perimeter of the proposed tanks.

Lagan Materials Ltd. site, Alexandra Road, Dublin Port, Dublin 1, D01 DK64

249m
2697/20GRANT PERMISSION13 May 2020

The development will consist of alterations to the existing North Wall Power Generating station, which include the replacement of existing indoor gas turbines with new and more efficient indoor gas turbines, the replacement of one of the two existing exhaust chimney stack’s (approx. 70m tall) and its re-construction at a reduced height of 65m to mirror the second existing exhaust stack, the installation of new gas compressors with associated fan coolers, the replacement of existing roof-mounted fan coolers, a fuel oil pumphouse, a demineralised water pumphouse, a new 1,000m3 demineralised water tank (approx. 10m tall), a new 1,000m3 gas oil storage tank (approx. 10m tall), the repurposing of an existing 4,000m3 fuel oil storage tank as a demineralised water storage tank of the same volume, a new fire water tank (approx. 10m tall), a new tanker unloading area comprising a concrete pad, emergency diesel generator, a new administration and welfare building, minor modifications to existing surface water drainage, a new entrance opening on to Alexandra Road and revised internal road layout and minor ancillary plant and equipment structures. The development will also comprise the removal of existing structures including; 70m tall stack and associated boiler, part of the administration building, canteen, stores building and water treatment buildings, gas compressor building as well as a water storage tanks, a bottle storage area and other minor redundant installations. The development will also include all other necessary associated works required to enable the construction and operation of the facility. An Environmental Impact Assessment Report (EIAR) has been prepared and is submitted as part of the planning application. It should be noted that this facility is identified as a Lower Tier site under the COMAH directive, furthermore the facility has an existing Industrial Emissions Licence which is regulated by the Environmental Protection Agency. All required licences and plans will be reviewed as required.

North Wall Power Generating Station, Alexandra Road, Dublin 1

275m
3872/20GRANT PERMISSION4 Dec 2020

The site is adjacent to Breakwater Road and Jetty Road. The development consists of removal of twelve bitumen & lubricant oil storage tanks with total capacity 3,105m3, removal of the associated equipment and removal of a control room building, followed by the installation of a new bitumen storage tank of 28m in diameter and 13.45m in height with a volume of approximately 8,275m3 and installation of a pump platform.

Irish Bitumen Storage Limited, Alexandra Road, Dublin Port, Dublin 1, D01 V0V2

324m
2071/20GRANT PERMISSION20 Jan 2020

Planning Permission for development at this site address: Circle K Yard 3, Alexandra Road, Dublin Port, Dublin 1. This site is regulated by the Major Accidents Directive. The development will consist of: Increasing the containment volume of the existing bund. Modifications will include raising the height of the existing bund wall by circa 0.5m, extending the bund to the east and lowering the ground level in the area of this bund extension from approximately 4.07m to 3.8m. The site's storm water, fresh water and foul sewer drainage will be modified to accommodate the bund extension.

Circle K, Yard 3, Alexandra Road, Dublin Port, Dublin 1

345m
WEB2680/24APPLICATION DECLARED INVA10 Dec 2024

The replacement of approximately 52 m of existing 2.4 m high chainlink perimeter fencing and associated access / emergency gates with new 2.4 m high security fencing, gates, 2 no. 8 m CCTV poles and all associated site works.

North Wall Above Ground Installation (AGI), Alexandra Rd, North Wall, Dublin 1

345m
WEB2709/24APPLICATION DECLARED INVA13 Dec 2024

The replacement of approximately 52 m of existing 2.4 m high chainlink perimeter fencing and associated access / emergency gates with new 2.4 m high security fencing, gates, 2 no. 8 m CCTV poles and all associated site works.

Alexandra Road, North Wall, Dublin 1