3 Castle Street, Dublin 2

GRANT PERMISSION

Planning application 3036/21

Dublin - Dublin City Council

Proposed Development

Permission for change of use of the ground floor (c. 155 sqm) to use class 8, for dental surgery.

Application Timeline

  1. Application received

    25 Jun 2021

  2. Decision due

    19 Aug 2021

  3. Decision: GRANT PERMISSION

    19 Aug 2021

  4. Grant issued

    1 Oct 2021

Application Details

Location
3 Castle Street, Dublin 2
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
268.43 ha

Timeline

Registration Date
25 June 2021
Status
Decision Notice Issued
Decision
GRANT PERMISSION
Decision Date
19 August 2021
Grant Date
1 October 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

31m
3589/20GRANT PERMISSION19 Oct 2020

Permission for internal re-configuration of the existing Healthcare Building along with the addition of 3.no single storey external ancillary rooms (27 m2) and 3 storey lift shaft to the rear (14m2), (total additional area 41m2) and all associated site works and services.

37-41, Castle Street, Dublin 2 D02 H773

67m
5536/22APPLICATION DECLARED INVA23 Dec 2022

The development will consist of erection of new hotel signage which will consist of the following; 2 no. vertical aluminium lettering signs (12.9m x 0.7m) with internal LED illumination on northwestern and northeastern facades of the front façade projection to the west, 1 no. horizontal lettering signage over main entrance (3.72 m x 0.251 m) with internal LED illumination and 3 no. horizontal signs (2 no. measuring 2.4m x 0.4m and 1 no. measuring 2.6 m x 0.4 m) over front porch of main entrance, all with internal LED illumination.

Jury's Inn, 8 Christchurch Place, Dublin 8, D08 REK7

67m
3080/23GRANT PERMISSION20 Jan 2023

The development will consist of erection of new hotel signage which will consist of the following: 2 no. vertical aluminium lettering signs (12.9m x 0.7m) with internal LED illumination on northwestern and northeastern facades of the front facade projection to the west, 1 no. horizontal lettering signage over main entrance (3.72m x 0.251m) with internal LED illumination and 3 no. horizontal signs (2 no. measuring 2.4m x 0.4m and 1 no. measuring 2.6m x 0.4m) over front porch of main entrance, all with internal LED illumination.

Jury's Inn, 8 Christchurch Place, Dublin 8, D08 REK7

67m
5306/22APPLICATION DECLARED INVA28 Nov 2022

The development will consist of erection of new hotel signage which will consist of the following: 2 no. vertical aluminium lettering signs (12.9m x 0.7m) with internal LED illumination on northwestern and northeastern facades of the front facade projection to the west, 1 no. horizontal lettering signage over main entrance (3.72m x 0.251m) with internal LED illumination and 3 no. horizontal signs (2 no. measuring 2.4m x0.4m and 1 no. measuring 2.6m x0.4m) over front porch of main entrance, all with internal LED illumination.

Jury's Inn, 8 Christchurch Place, Dublin 8, D08 REK7

67m
3564/24GRANT PERMISSION22 Apr 2024

The development will consist of two new rooftop louvered screened enclosures with open roofs, total area of 64.36 square meters, for air conditioning units with supporting platforms and development works associated with above, all at roof level.

Leonardo Hotel, Christchurch Place, Dublin 8 , D08 REK7

80m
2357/21GRANT PERMISSION8 Mar 2021

Planning permission for replacement of existing shopfronts and install new shopfront streetscape incorporating 5 no. retail units and apartment block entrance (6 no. in total) and all associated site development works.

Castlegate Apartment, Lord Edward Street, Dublin 2

84m
3569/21APPLICATION DECLARED INVA27 Sept 2021

Permission for the removal of an existing mechanical vehicular gate to be replaced with a similar gate positioned closer to the street building line.

Block B, Castle Gate Apartments, Castle Street, Dublin 2.

84m
3633/21GRANT PERMISSION5 Oct 2021

Permission for the removal of an existing mechanical vehicular gate to be replaced with a similar gate positioned closer to the street building line at Block B, Castle Gate Apartments, Castle Street, Dublin 2.

Block B, Castle Gate Apartments, Castle Street, Dublin 2.

93m
3212/23WITHDRAWN ARTICLE 33 (NO13 Feb 2023

PROTECTED STRUCTURE: Development will consist of the removal of two timber display cases on the railings, erection of three printed aluminium sheet signs on the railings, and the widening of the main vehicular gate to accommodate delivery vehicles and fire tenders.

Christ Church Cathedral, Christ Church Place, Dublin 8, D08 TF98

93m
3123/24GRANT PERMISSION AND RETE31 Jan 2024

PROTECTED STRUCTURE . PERMISSION & RETENTION. . Permission and retention for development at this site: Christ Church Cathedral, Christ Church Place, Dublin 8, (a protected structure). Development will consist of widening of main vehicular gate to accommodate delivery vehicles and fire tenders and retention of rearrangement of signage and display cases on perimeter railings.

Christ Church Cathedral, Christ Church Place, Dublin 8

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?