← Back to search

8 Ennel Park, Dublin 5, D05 E4A9

GRANT PERMISSION

Planning application 3114/24

Dublin - Dublin City Council

Proposed Development

PERMISSION: Development will consist of replacing the existing pedestrian entrance with a new vehicular entrance. Existing steel boundary railings to be replaced with a new blockwork boundary wall and all ancillary works.

Application Timeline

  1. Application received

    31 Jan 2024

  2. Further information requested

    21 Mar 2024

  3. Further information received

    9 Apr 2024

  4. Decision due

    3 May 2024

  5. Decision: GRANT PERMISSION

    3 May 2024

  6. Grant issued

    10 Jun 2024

Application Details

Location
8 Ennel Park, Dublin 5, D05 E4A9
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
226 ha

Timeline

Registration Date
31 January 2024
Status
Decision Notice Issued
Decision
GRANT PERMISSION
Decision Date
3 May 2024
Grant Date
10 June 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

42m
3950/20GRANT PERMISSION16 Dec 2020

Development will consist of a proposed new ground & first floor extension to the rear of the existing house and all ancillary works.

1, Ennel Park, Dublin 5 D05 C3F2

43m
WEB1749/24GRANT PERMISSION17 Jun 2024

PERMISSION to construct the following: (1) a second storey side extension (14.0 sq m) over existing single storey extension comprising of a master bedroom with walk in wardrobe, (2) Modify existing front pitch roof over hall & family room to a flat roof and all associated site works.

22 Ennel Park, Artane, Dublin 5

43m
WEB1719/24APPLICATION DECLARED INVA10 Jun 2024

Planning Permission sought to construct a second storey extension (14.0 sq m) over existing single storey extension comprising of a master bedroom with walk in wardrobe and all associated site works at No. 22 Ennel Park, Artane, Dublin 5 for John & Deirdre Kilmurray.

22 Ennel Park, Artane, Dublin 5,

49m
5083/26GRANT PERMISSION30 Mar 2026

Planning permission to erect a porch extension, a lean-to canopy, a bin-store and screen wall including ancillary site works at the front.

24 Ennel Park, Artane, Dublin, D05 R7P2

49m
5075/26APPLICATION DECLARED INVALID24 Mar 2026

To erect a porch extension , a lean-to canopy , a bin store and screen wall including ancillary site works at the front .

24 Ennel Park, Artane, Dublin 5 , D05R7P2

71m
WEB1555/22APPLICATION DECLARED INVA10 Jun 2022

Permission to construct a single-story extension, to the rear and to the side of 32 Ennel Park, Donaghmede, D05 E5F6. The proposed extension is of 44.50 sq. m. It will consist of a new kitchen/diner & utility area, construction of a new chimney, and skylight/s to the rear. Single bed with an en-suite WC with skylight, to the side of the property. A new entrance through an integrated porch. The development is to include internal alteration (ground floor only), landscape and all the ancillary site works and drainage.

32, Ennel Park, Dublin 5

71m
WEB1581/22GRANT PERMISSION21 Jun 2022

We Raul Ortega & Danielle Kirwan, intend to apply for permission to construct a single-story extension, to the rear and to the side of 32 Ennel Park, Donaghmede, D05 E5F6, Dublin Co. Dublin. The proposed extension is of 44.50 sq. m. It will consist of a new kitchen/diner & utility area, construction of a new chimney, and skylight/s to the rear. Single bed with an en-suite WC with skylight, to the side of the property. A new entrance through an integrated porch. The development is to include internal alteration (ground floor only), landscape, bins storage and all the ancillary site works and drainage.

32, Ennel Park, Donaghmede, Dublin 5 D05 E5F6

75m
2897/21GRANT RETENTION PERMISSIO4 Jun 2021

RETENTION: The development will consist of following internal and external alterations to the existing permission DCC Ref. 2479/18: (A) Rearrangement to the internal layout consisting of omission of second bedroom and provision of study/store room and utility room. (B) Alteration of permitted rear extension resulting in area increase of 3.6m2 and rearrangement of fenestration to rear extension. (C) Omission of side window to porch and addition of glazed side panels to both sides of the entrance door. (D) Alterations to front garden consisting of repositioning of bin enclosure, widening of vehicular entrance, provision of metal gate and paved surface to entire front garden.

59A Moatfield Road, Dublin 5

76m
WEB1556/21GRANT RETENTION PERMISSIO20 May 2021

Retention permission is being sought for the 18.11m.sq single story extension, comprising of a 7.5m.sq kitchen extension and 10.61m.sq garage to side.

48A, Ennel Drive, Artane, Dublin 5

79m
WEB1650/23GRANT PERMISSION1 Aug 2023

The development will consist of (1) demolition of hipped lean to roof to the side, (2) construction of a new entrance through a single-story integrated porch to the front (9.6sq.m), and (3) construction a single-story extension to the rear (38.2sq.m). The proposed rear extension will consist of a new kitchen/diner with skylight, utility, wc and bedroom. The development will include a new flat roof to the front, side and rear, internal alteration (ground floor only), landscape, and all ancillary site works and drainage.

34, Ennel Park, Artane, Dublin 5 D05 E3T2

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?