← Back to search

Kilmore Road, Artane, Dublin 5, D05 C7X8 On The Site Of The Old ‘Novum’ Building, Part Of The Estate Known As The Artane Business Park, Located East Of The Butterly Business Park And West Of The Access Roadway Through The Estate

REFUSE PERMISSION

Planning application 3115/21

Dublin - Dublin City Council

Proposed Development

Planning permission for a mixed use development comprising a build-to-rent (btr) residential development, a hotel, office / enterprise space and enterprise units at a site circa 0.4073ha located and accessed from the kilmore road, artane, dublin 5, d05 c7x8 on the site of the old ‘novum’ building, part of the estate known as the artane business park, located east of the butterly business park and west of the access roadway through the estate. The development consists of the demolition of the existing single storey building (circa 2,752sqm) and sections of boundary walls (some subject to agreement with adjoining landowners); the construction of two building blocks a&b (block a to the south and block b the north), defining and separated by an urban square, block a (comprising of a hotel, enterprise units, btr apartments with associated communal residential amenities, with 2 no. Roof gardens; at 2nd floor podium level and 5th floor rooftop level) and block b (comprising of enterprise units, office/enterprise units, btr apartments with associated communal residential amenities and roof garden; 5th floor rooftop level, further detailed below; with a total gross floor area of circa 10,323sqm. Block a is a 2, 5 + 7 storey building, it faces kilmore road (to the south), the access road (to the east), the boundary of the butterly business park (to the west) and is designed as two blocks linked by a two storey podium with landscaped roof garden. The southern part of block a comprises a 77 bedroom hotel, including a ground floor restaurant (circa 187sqm) with associated external dining area and ground floor colonnade to the south west, café/bar (circa 83sqm), 4 no. First floor meeting rooms (circa 210sqm), gym and business center facilities (with shared usage by btr residential units), 77 bedrooms over second, third, fourth, fifth and sixth floors, plant/services room at seventh floor (roof level), with solar panels at 7th and 5th floor roof levels and extensive green roof at 2nd floor, all with a gross floor area of 3,950sqm the northern part of block a also includes a 2 storey podium with roof garden, ground floor colonnade to 3 no. Ground floor enterprise units with gross floor area of 194sqm, refuse areas, bicycle parking, a one-way vehicular and a pedestrian route under the block from the urban square, turning to link to the eastern access road, with car parking at ground and first floors, with associated car lift access from urban square, 20 no. Apartments btr over second, third and fourth floors (8 no. 1 bed units; 12 no. 2 bed units), all with balconies or terraces facing north, south and west), second floor associated community room (circa 37sqm), and external landscaped semi-private deck area, (circa 457sqm), fifth floor community room (circa 18sqm) and landscaped rooftop garden area, circa 267sqm, and extensive green roof, all with a gross floor area of 3,330sqm. Block b includes ground floor colonnade to 2 no. Ground floor enterprise units (circa 323sqm, refuse areas, secure bicycle parking, btr concierge/reception, first floor office / enterprise unit (circa 471sqm), btr common room (circa 85sqm), 21 no. Apartments over second, third and fourth floors (9 no. 1 bed units; 12 no. 2 bed units), all with balconies or terraces facing north, south and west), fifth floor community room (circa 18sqm) and landscaped rooftop garden area, circa 267sqm, and extensive green roof, all with a gross floor area of 3,043sqm. The development includes 4 no. Refuse stores, 3 no. Bicycle stores, 100 no. Cycle parking spaces, 48 no. Car parking spaces, including 3 no. Car club parking spaces, 2 no. Set down area for hotel, 1 no. Loading bay, 2 no. Car lift waiting spaces, community amenity open space at second floor podium level to block a (circa 457sqm), and at roof level / fifth floor of blocks a and b (circa 534sqm), boundary treatments and all associated site works including sustainable urban drainage systems, green roof systems, waste management areas, roof plant, associated hard and soft landscaping, and all other associated site excavation, infrastructural and site development works above ground including boundary treatments and associated site servicing (foul and surface water drainage and water supply). Access to the scheme will be via kilmore road.

Application Timeline

  1. Application received

    7 Jul 2021

  2. Decision due

    31 Aug 2021

  3. Decision: REFUSE PERMISSION

    31 Aug 2021

  4. Appeal submitted

    29 Sept 2021

  5. Appeal decided: REFUSE PERMISSION

    21 Sept 2022

Application Details

Location
Kilmore Road, Artane, Dublin 5, D05 C7X8 On The Site Of The Old ‘Novum’ Building, Part Of The Estate Known As The Artane Business Park, Located East Of The Butterly Business Park And West Of The Access Roadway Through The Estate
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
4024.76 ha

Timeline

Registration Date
7 July 2021
Status
Appeal Decided
Decision
REFUSE PERMISSION
Decision Date
31 August 2021

An Coimisiún Pleanála Appeal

Appeal Reference
ABP-311497-21
Decision
REFUSE PERMISSION
Submitted
29 September 2021
Decided
21 September 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

22m
3186/22GRANT PERMISSION31 Jan 2022

Permission for the subdivison of the previously combined Units 1 and 2 Artane Place (formerly Butterly Business Park) , Kilmore Road, Artane, Dublin 5 into two separate Units to be known as Unit 1, Artane Place, Kilmore Road, Artane, Dublin 5 and Unit 2, Artane Place, Kilmore Road, Artane, Dublin 5 respectively including a change of use from previous retail for the current combined unit to proposed retail/cafe/take away for each of the subdivided units. The insertion of a new shop front in the north west elevation of the new Unit 1. The removal of existing roller shutter from the south west elevation of Unit 1 and the blocking up of that opening. The insertion of a single escape door in the south west elevation of Unit 1 and in the south east elevation of Unit 2.

Units 1 and 2 Artane Place (formerly Butterly Business Park), Kilmore Road, Artane, Dublin 5

30m
WEB2349/25GRANT PERMISSION11 Jun 2025

Storebox Self Storage Ireland Limited, intend to apply for permission for development at this site: Unit 3EB, Artane Business Park, Dublin 5. The development will consist of: Amendments to permission granted under Dublin City Council Reg. Ref. 4021/20 comprising internal alterations including change of stair location, filling of an existing void in the mezzanine floor of 12m2 for use for storage units, changes to bathroom facilities, inclusion of new fire doors, a new external fire escape stairway, new window at first floor level, additional signage, changes to the storage container layout in the rear yard area and all ancillary development.

Unit 3EB Artane Business Park, Dublin 5

46m
4021/20GRANT RETENTION PERMISSIO22 Dec 2020

RETENTION: Retention permission for the continued use of Unit 3EB for self-storage use as granted for a temporary period under planning reg. ref. 3788/17. No internal or external works to the existing building are proposed. Retention permission is also sought for storage containers located to the rear of Unit 3EB and storage containers in an open yard area to the north of the property.

Unit 3EB, Artane Business Park, Kilmore Road, Artane, Dublin 5

49m
2114/19APPLICATION WITHDRAWN24 Jan 2019

Permission for development at Unit 40. Butterly Business Park, Kilmore Road, Dublin 5. The development will consist of a change of use of Unit 40 from office use to restaurant and cafe use, as an extension to the existing cafe in Unit 37 and the construction of a glazed aluminium-framed shopfront with roller shutter in the existing elevation of Unit 40, with related signage overhead.

Unit 40, Butterly Business Park, Kilmore Road, Dublin 5

49m
2398/19GRANT PERMISSION1 Mar 2019

Change of use of Unit 40 from office use to restaurant and café use, as an extension to the existing café in Unit 37, and the construction of a glazed aluminium-framed shopfront with roller shutter in the existing elevation of Unit 40, with related signage overhead.

Unit 40, Butterly Business Park, Kilmore Road, Dublin 5

49m
WEB1345/25GRANT PERMISSION21 Feb 2025

CHANGE OF USE. (i) The change of use from office use to medical use; and, (ii) all associated internal reconfiguration works and ancillary works necessary to facilitate the development.

Unit 40 Artane Place (formerly Butterly Business Park), Kilmore Road, Artane, Dublin 5

64m
2155/19GRANT PERMISSION31 Jan 2019

The development will consist of a change of use of Units 41 & 42 from previous use as a gym to retail use.

Units 41 & 42, Butterly Business Park, Kilmore Road, Dublin 5.

69m
WEB2651/24GRANT RETENTION PERMISSIO5 Dec 2024

RETENTION. The development consists of use of a previously vacant light industrial unit of 807.5m2 for self storage use. The storage consists of 34 no. 160 sq. ft. internal container units and 2 no. 12 sq. ft. wooden storage units, signage to the front of the building and all ancillary development.

Unit 3EC, Artane Business Park, Dublin 5

71m
5228/22GRANT PERMISSION15 Nov 2022

Planning permission is sought for development comprising: the change of use of vacant offices at first floor level of unit 35A to use as artist studios. A total of 10 no. artist studios will be provided, all at first floor level. The existing reception (at ground floor level), kitchen (at first floor level) and WC (at first floor level) will serve the proposed studios. The development also includes any ancillary works necessary to facilitate the development.

35A, Artane Place (formerly Butterly Business Park), Kilmore Road, Artane, Dublin 5

79m
WEB1380/19SPLIT DECISION(PERMISSION1 Jul 2019

The development will consist of :- The installation of the following boundary treatment to the South Eastern Boundary of the site, and all ancillary works:- - 1 no. pair of Stainless Steel Vehicular Gates 2150mm high - 2 no. Stainless Steel Pedestrian Gates 2250mm high. - 1 no. Stainless Steel Pedestrian Gate 2505mm high. - The replacement of an existing 515mm high Stainless Steel Railing on top of an existing wall with a new Stainless Steel Railing 1050mm high. - 1 no. pair of Stainless Steel Service Access Gates 2320mm high.

Timber Mills, Kilmore Road, Artane, Dublin 5

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?