Humanscale , Poppintree Industrial Estate, Dublin 11, D11XY42

GRANT RETENTION PERMISSIO

Planning application 3119/24

Dublin - Dublin City Council

Proposed Development

RETENTION PERMISSION for erecting 593.20m2 or 123.300 kWp of photovoltaic panels on the roof of our factory with all associated site works.

Application Timeline

  1. Application received

    31 Jan 2024

  2. Decision: GRANT RETENTION PERMISSIO

    21 Mar 2024

  3. Decision due

    26 Mar 2024

  4. Grant issued

    23 Apr 2024

Application Details

Location
Humanscale , Poppintree Industrial Estate, Dublin 11, D11XY42
Applicant
N/A
Application Type
Retention Permission
Planning Authority
Dublin City Council
Site Area
4991.85 ha

Timeline

Registration Date
31 January 2024
Status
Decision Notice Issued
Decision
GRANT RETENTION PERMISSIO
Decision Date
21 March 2024
Grant Date
23 April 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

94m
WEB2720/24APPLICATION DECLARED INVA16 Dec 2024

RETENTION PERMISSION for a single storey extension to the rear, porch extension to the front & dormer window to the rear

29, Hampton Wood Way, Finglas, Dublin 11

94m
4472/24GRANT RETENTION PERMISSIO23 Dec 2024

RETENTION : Retention permission for a single storey extension to the rear , porch extension to the front and dormer window to the rear .

29 Hampton Wood Way, Finglas, Dublin 11, D11X2PO

95m
3686/21GRANT PERMISSION14 Oct 2021

Planning permission to erect 1,718.00 m2 or 348.44 kW of photovoltaic panels on the roof of the building in our company with all associated site works.

Unit 3, IDA Industrial Estate, Poppintree, Dublin 11

185m
3914/20REFUSE PERMISSION14 Dec 2020

The development will consist of; - Relocation of existing off-licence which is part of existing Centra retail unit trading in units 177-180 to a new stand alone Centra off-licence unit to be located at units 193 and 194. - Erection of new signage to front elevation of unit 193.

Unit 193 & 194 and existing Centra (units 177-180), at Hampton Wood Road, Meakstown, Dublin 11

223m
WEB1371/25APPLICATION DECLARED INVA25 Feb 2025

PERMISSION for the following: (i) Upgrade to existing Effluent Treatment system to include a new Balance Tank, Screen, DAF and Sludge Tank all located within a new detached Effluent and Control Building to the South of the existing Factory, (ii) Single storey extension to the northern elevation of the existing Factory consisting of a Refrigeration Plant Room and Electrical Room and (iii) all associated site works.

Poppintree Industrial Estate, Unit 4, IDA, Finglas, Dublin 11

223m
WEB1436/25GRANT PERMISSION4 Mar 2025

Planning Permission for the following: (i) Upgrade to existing Effluent Treatment system to include a new Balance Tank, Screen, DAF and Sludge Tank all located within a new detached Effluent and Control Building to the South of the existing Factory, (ii) Single storey extension to the northern elevation of the existing Factory consisting of a Refrigeration Plant Room and Electrical Room and (iii) all associated site works

Poppintree Industrial Estate, Unit 4, IDA, Finglas, Dublin 11

251m
WEB1010/20GRANT RETENTION PERMISSIO8 Jan 2020

RETENTION PERMISSION: RETAIN SIDE SINGLE STOREY CARPORT EXTENSION WITH FRONT OPEN CANOPY

111 Belclare Park, Poppintree, Ballymun, Dublin 11

293m
2538/19GRANT PERMISSION19 Mar 2019

The development will consist of: Construction of new two bed detached bungalow total 83sqm, with pitched roof and 4sqm solar panels. All to rear of existing bungalow (No.2), and to be known as 2A Poppintree Cottages with off street parking. Vehicle access is via existing side entrance. All of the above to include new water connection and landscaping with all other services connected to existing.

Rear Of, 2, Poppintree Cottages, Jamestown Road, Finglas, Dublin 11, D11 DA50

318m
3585/20REFUSE PERMISSION16 Oct 2020

The proposed development will consist of the construction of a hardstand area for the delivery and temporary storage of freight containers and parking of Heavy Goods Vehicles (Total GFA of hardstand works c.32.226m² ), the use of a former car parking area to provide 20 no. staff car parking spaces and the installation of temporary portacabin buildings comprising 1no. security /office hut (c.28m²), 1no. canteen (c.28m²), 1no. toilet block (c.10 m²) and 1no. shower block (c.10 m²) and 2 no. two security gate buildings (26 m²). The development will be accessed via two existing entrances from the Jamestown Road. The northern access is proposed to be entry only while the southern access is proposed to have an entry and exit arrangement.

Former Mouldpro International Site, Jamestown Road & Poppintree Park Lane West, Finglas, Dublin11

319m
4347/22APPLICATION DECLARED INVA29 Jun 2022

Permission for construction of a temporary bus depot to facilitate the temporary storage, maintenance and dispatch of buses by Dublin Bus at Jamestown Road & Poppintree Park Lane West, Finglas, Dublin 11. The proposed development is intended to facilitate the temporary relocation of buses from existing Dublin Bus depots (in Dublin City) to allow for the phased infrastructure upgrades of those existing depots (including electrification of those depots) and will include: 1) Construction of a bus maintenance building to provide enclosed daily maintenance routine of bus vehicles and which shall include; a) Internal night service bay, maintenance/inspection pit, cleaning and washing stations and rim cleaning room, b) Stores, parts, tools compressor and battery charging rooms c) Maintenance administration rooms, d) Maintenance staff amenities including; kitchenette with seating, locker, washroom and WC; 2) Construction of an administration building including; a) Depot control, administration, and operation offices; b) Driver staff amenities including: kitchenette with seating; locker changing; WC; rest and welfare areas; c) Service plant and store rooms 3) Construction of external, pervious, hard surface bus parking for provision of circa 178 buses; 4) Construction of a vehicle inspection hut; 5) Staff and service car-parking and 1no. staff bicycle shelter; 6) Modifications to existing site vehicular entrance/egress points onto Jamestown Road including amended road demarcation; 7) 1 no. back-up generator; 8) 2no. water storage tanks (for fire hydrant and fire sprinkler systems) and associated pump house; 9) 3 no. bunded fuel tanks; 10) 2 no. security/control cabins situated at site entrance and egress; 11) On-site surface water management including attenuation prior to controlled off-site discharge via hydrocarbon petrol interceptor to existing public surface water mains on Jamestown Road; 12) Connection to existing water and foul water mains on Jamestown Road; 13) Lighting stands; 14) Provision of noise attenuation barrier on western (Jamestown Road) site boundary; 15) Signage; 16) Landscaping including; erection of new perimeter fencing and planting; and 17) All associated site development works.

Former Mouldpro International Site , Jamestown Road & Poppintree Park Lane West, Finglas, Dublin 11

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?