Dereks Hardware and Bake 'N' Brew, 2B Quarry Road, Cabra East, Dublin 7. D07 AK13
GRANT PERMISSION AND RETEPlanning application 3184/21
Dublin - Dublin City Council
Proposed Development
RETENTION AND PERMISSION: The development consists of the Retention Permission application for Change of Use, from a pharmacy unit to a joint Hardware and Coffee Shop(take-away) retail unit, Retention is also sought for 4 no. Signage installations above main entrance and for an Outdoor Seating Area to accommodate 15 seats in total. Planning Permission is sought for Proposed Fencing to seating area boundary and 2 no. Parasols, fully retractable in nature.
Application Timeline
Application received
16 Jul 2021
Decision due
9 Sept 2021
Decision: GRANT PERMISSION AND RETE
9 Sept 2021
Grant issued
21 Oct 2021
Application Details
- Location
- Dereks Hardware and Bake 'N' Brew, 2B Quarry Road, Cabra East, Dublin 7. D07 AK13
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 223.4 ha
Timeline
- Registration Date
- 16 July 2021
- Status
- Decision Notice Issued
- Decision
- GRANT PERMISSION AND RETE
- Decision Date
- 9 September 2021
- Grant Date
- 21 October 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
PERMISSION & RETENTION: The development consists of the Retention Permission application for change of use from a pharmacy unit to a joint hardware and coffee shop (take-away) retail unit. Retention is also sought for signage above main entrance and for an outdoor seating area (to accommodate 15 seats in total), including temporary awning and timber fencing to boundary. Planning permission is also sought for the future construction of a metal pergola to cover outdoor seating area.
Derek's Hardware and Bake'n Brew, 2B, Quarry Road, Cabra East, Dublin 7
The demolition of existing single storey commercial building (47 Sq. M) and construction of a part single storey, part two storey, one bedroom detached dwelling (66 Sq. M) and all associated site works.
179C, Cabra Road (Accessed off Quarry Road), Cabra, Dublin 7
The demolition of existing single storey commercial building (47 Sq. M) and construction of a two storey dormer bungalow style dwelling with dormer window on front (west) facing elevation and all associated site works.
179C, Cabra Road (Accessed off Quarry Road), Cabra, Dublin 7
Planning permission for the creation of vehicular access.
18, Quarry Road, Cabra, Dublin 7
The development seeking permission will consist of the provision of a 2.5m wide vehicular entrance to the front of the property, the construction of a single storey extension to the front and the construction of a single-storey extension to the side of the property and all associated site works.
124, Leix Road, Dublin 7
The development will consist of (1) demolition of shed to rear, (2) additions and alterations to the existing dwelling house to include, (a) construction of a single-storey extension to rear and, (b) conversion of existing integrated garage to front, (3) installation of new roof-light to the existing side hip of main roof of dwelling, (4) conversion of attic and construction of a new zinc-clad dormer roof to rear, and, (5) all associated site, drainage and structural works.
171, Cabra Road, Cabra, Dublin 7
The development will consist of (1) demolition of shed to rear, (2) additions and alterations to the existing dwelling house to include, (a) construction of a single-storey extension to rear and, (b) conversion of existing integrated garage to front, (3) installation of new roof-light to the existing side hip of main roof of dwelling, (4) conversion of attic and construction of a new zinc-clad dormer roof to rear, and, (5) all associated site, drainage and structural works.
171, Cabra Road, Dublin 7
RETENTION: The development will consist of the retention of existing detached single storey external revolution laundry kiosk with ancillary logos and instructional advertising as constructed located to the north east side of existing petrol station forecourt and all associated site works.
Circle K, 146 Cabra Road, Dublin 7
RETENTION: The development will consist of the retention of existing detached single storey external "revolution" laundry kiosk with ancillary logos and instructional advertising as constructed located to the north east side of existing petrol station forecourt and all associated site works.
146, Cabra Road, Dublin 7
RETENTION: The development will consist of the retention of existing detached single storey external "revolution" laundry kiosk with ancillary logos and instructional advertising as constructed located to the north east side of existing petrol station forecourt and all associated site works.
Circle K, 146 Cabra Road, Dublin 7
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?