← Back to search

Hillside, Old Finglas Road, Dublin 11

GRANT PERMISSION

Planning application 3195/22

Dublin - Dublin City Council

Proposed Development

Permission to amend previous planning for Rose Cottage Playschool, Hillside, Old Finglas Road, Dublin 11. 1. Amend planning to accommodate 40 children from 12 children. 2. Amend planning of 1st floor from residential to commercial 3. Amend operational times from 9.30am -12.30am to 9am-2.30pm.

Application Timeline

  1. Application received

    1 Feb 2022

  2. Further information requested

    28 Mar 2022

  3. Further information received

    5 Apr 2022

  4. Decision due

    29 Apr 2022

  5. Decision: GRANT PERMISSION

    29 Apr 2022

  6. Grant issued

    16 Jun 2022

Application Details

Location
Hillside, Old Finglas Road, Dublin 11
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
150 ha

Timeline

Registration Date
1 February 2022
Status
Decision Notice Issued
Decision
GRANT PERMISSION
Decision Date
29 April 2022
Grant Date
16 June 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

27m
4421/24GRANT PERMISSION28 Nov 2024

Permission for: (1) The removal of 2 No. Chimney stacks. (2) To construct new single Storey porch extension to front. (3) To construct 1st floor extension to rear, also raise the ridge / roof line. 4) Proposed new vehicular entrance to off street car parking to front / side garden, and all associated site works to existing single storey detached dwelling.

4 Farrelly Cottages, Old Finglas Road, Glasnevin, Dublin 11, D11 F2X6

42m
3069/20GRANT PERMISSION21 Jul 2020

Planning permission for demolition of existing dormer style dwelling house of a floor area of 66m2 and associated site clearance works, including planning permission for a new replacement two storey dwelling house of floor area 228m2 with connection into existing foul and surface water sewer network, connection into existing public water mains, new boundary walls and all associated site development works.

No. 2, Old Finglas Road, Dublin, 11.

54m
WEB1638/23GRANT RETENTION PERMISSIO27 Jul 2023

The retention of the existing scrolling internally illuminated double sided ‘Metropole’ advertising display case mounted on an offset leg.

On the grass area adjacent to the public footpath at the northern side of the junction of Finglas Road and Old Finglas Road, Dublin 11

69m
WEB1384/20GRANT RETENTION PERMISSIO22 Jun 2020

RETENTION: Retain rear single storey extension.

3, Glasnevin Oaks, Glasnevin, Dublin 11

69m
WEB1192/20APPLICATION DECLARED INVA7 Apr 2020

RETENTION: Retain rear single storey extension.

3, Glasnevin Oaks, Glasnevin, Dublin 11, D11 X9F3

104m
3487/20GRANT PERMISSION2 Oct 2020

The development will consist of: Construction of new three bed detached dormer bungalow (dormer in west elevation) with mansard roof (upper floor in roof) and 6sqm solar panels, all to the side of existing bungalow (No. 10). Existing vehicle access onto Glasnevin Downs widened to 3.2m for off street parking. All to include new water connection and boundaries untouched with all other services connected to existing.

Side of 10, Bellvue Cottages, Old Finglas Road, (Junction with Glasnevin Downs),Glasnevin, Dublin, 11

111m
2057/20APPLICATION DECLARED INVA17 Jan 2020

The development will consist of: Construction of new three bed detached dormer bungalow with pitched roof and 6sqm solar panels. All to the rear of existing bungalow (No. 10), and to be known as 10A Bellvue Cottages. New vehicle access onto Glasnevin Downs with off street parking. All of the above to include new water connection and landscaping with all other services connected to existing.

Rear of 10, Bellvue Cottages, Old Finglas Road, Glasnevin, Dublin, 11 (Junction with Glasnevin Downs) D11 H3C4

111m
2292/20REFUSE PERMISSION18 Feb 2020

The development will consist of construction of new three bed detached dormer bungalow with pitched roof and 6sqm solar panels. Three dormers total, all located to side, two to northern elevation (clear glazing) and one to southern elevation (opaque glazing). All to the rear of existing bungalow (No. 10). New vehicle access onto Glasnevin Downs with off street parking. All of the above to include new water connection and landscaping with all other services connected to existing.

Rear of 10, Bellvue Cottages, Old Finglas Road, Glasnevin, Dublin, 11 (Junction with Glasnevin Downs) D11 H3C4

111m
3977/19REFUSE PERMISSION11 Sept 2019

The development will consist of: construction of new three bed detached dormer bungalow with pitched roof and 6sqm solar panels. All to the rear of existing bungalow (No.10), and to be known as 10A Bellvue Cottages). New vehicle access onto Glasnevin Downs with off street parking. All of the above to include new water connection and landscaping with all other services connected to existing.

Rear of 10, Bellvue Cottages, Old Finglas Road, Glasnevin, Dublin 11 (junction with Glasnevin Downs)

136m
2835/20GRANT PERMISSION AND RETE9 Jun 2020

PERMISSION & RETENTION: For widening and repositioning of the vehicular entrance with new piers, boundary wall & sliding gate and new porch and amendment to fenestration to front of the existing dwelling house.

5, Bellvue Cottages, Glasnevin, Dublin 11, D11 Y8XY

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?