← Back to search

9-12 Dawson Street, Dublin 2

GRANT PERMISSION

Planning application 3263/24

Dublin - Dublin City Council

Proposed Development

PROTECTED STRUCTURE Allied Irish Banks plc intends to apply for planning permission for development at 9-12 Dawson Street, Dublin 2 (Protected Structure). The development will consist of the installation of 9 no. CCTV cameras affixed to the external elevations of the building - 2 no. on the western (Dawson Street) elevation; 3 no. on the southern (Dawson Lane) elevation, and 4 no. on the eastern (Dawson Lane) elevation.

Application Timeline

  1. Application received

    23 Feb 2024

  2. Decision: GRANT PERMISSION

    16 Apr 2024

  3. Decision due

    18 Apr 2024

  4. Grant issued

    23 May 2024

Application Details

Location
9-12 Dawson Street, Dublin 2
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
1351 ha

Timeline

Registration Date
23 February 2024Other applications received that week
Status
Decision Notice Issued
Decision
GRANT PERMISSION
Decision Date
16 April 2024
Grant Date
23 May 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

15m
4661/23GRANT PERMISSION20 Oct 2023

PROTECTED STRUCTURE: the development will consist of signage on the external elevations of 11-12 Dawson Street comprising individually mounted steel letters and logo over the entrance door facing Dawson Street, individually mounted steel letters and company sign within a steel frame (600 mm square) at ground floor elevation facing Dawson Lane; application of perforated PVC film displaying the company sign on the glazed internal lobby doors on the Dawson Street entrance and the repainting of the existing sign above the entrance door facing Dawson Lane to match the surrounding facade.

9-12 Dawson Street, Dublin 2

154m
WEB1098/24APPLICATION DECLARED INVA31 Jan 2024

The replacement of the existing fascia sign with a new white metal fascia sign and a new black aluminium lighting trough below, covering the existing black glass fascia with black matt vinyl, 5 no. new low-level signs and a window hanging plaque behind the glazing at No. 26/27 Grafton Street, Dublin 2. Fascia sign to be 2250mm x 350mm. The building is located in an Architectural Conservation Area.

26/27 Grafton Street, Dublin 2, D02 HH24

154m
WEB1264/24APPLICATION DECLARED INVA8 Mar 2024

The replacement of the existing fascia sign with a new white metal fascia sign and a new black aluminium lighting trough below, covering the existing black glass fascia with black matt vinyl at 26/27 Grafton Street, Dublin 2. Fascia sign to be 2250mmx378mm. The building is located in an Architectural Conservation Area.

26 & 27, Grafton Street, Dublin 2

154m
WEB1291/24GRANT PERMISSION14 Mar 2024

The development will consist of the replacement of the existing fascia sign with a new white metal fascia sign and a new black aluminium lighting trough below, covering the existing black glass fascia with black matt vinyl at 26/27 Grafton Street, Dublin 2. Fascia sign to be 2250mm x 378mm.

26/27, Grafton Street, Dublin 2

154m
WEB1182/24APPLICATION WITHDRAWN21 Feb 2024

RETENTION : Retention permission for development at No.26/27 Grafton Street, Dublin 2. The development consists of white metal fascia sign and a black aluminium lighting trough below, black matt vinyl on black glass fascia, 5 no. low-level signs and a window hanging plaque behind the glazing. Fascia sign is 2250mm x 350mm. The building is located in an Architectural Conservation Area.

26 & 27 Grafton Street, Dublin 2, D02 HH24

226m
3539/22GRANT PERMISSION16 Mar 2022

Planning permission for the amendment to an existing shopfront including the refacing of the existing fascia; painting of the existing shopfront frame with new solid panels either side of the existing entrance door and the installation of an illuminated sign mounted on the new fascia panel, together with all associated site works; all at 41, Grafton Street, Dublin 2, D02 WP63. This building is located within an architectural conservation area.

41, Grafton Street, Dublin 2

259m
D25A/0706/WEBDECLARE APPLICATION INVALID11 Sept 2025

New non-illuminated fascia sign with 'Build-A-Bear' Workshop; wording in white w

47 Grafton Street, Dublin 2, D02A780

259m
2807/21GRANT PERMISSION21 May 2021

Permission for new shopfront and signage to replace existing.

No. 2 St. Stephens Green, Dublin 2

278m
4331/19GRANT PERMISSION31 Oct 2019

The development will consist of permission for the erection of a sliding open-mesh retractable security gate to existing shop entrance.

60 & 61, Grafton Street, Dublin 2

297m
3221/21GRANT PERMISSION27 Jul 2021

PROTECTED STRUCTURE: For development at this site at No. 14-15 Kildare Street, Dublin 2, Protected Structures ref: 4200 (No. 14) and 4201 (No.15) under the Dublin City Council Record of Protected Structures. The development will consist of the change of use from commercial to residential use, partitioning and all required alterations of 4 no. units in No.14 Kildare Street as follow: Unit C,- 60.90sq.m, 2 bedroom dwelling at First Floor Level; Unit E- 60.90sq.m, 2 bedroom dwelling at Second Floor Level ; Unit G- 60.90sq.m, 2 bedroom dwelling at Third Floor Level; Unit 1- 55.20.m, 2 bedroom dwelling at Fourth Floor Level. The development also consists of the change of use of a basement plant room area in No. 15 into residential use - Unit A, 59. 00sq.m, 1 bedroom apartment. The development also consists refurbishment and alteration works to 4 no existing residential units in No. 15 Kildare Street: Unit B-33.85sq.m, Bedsit Unit at Ground Floor Level; Unit D-58.25sq.m, 1 bedroom unit at First Floor Level; Unit F- 58.25sq.m, 1 bedroom dwelling at Second Floor Level and Unit H-58.25sq.m, 1 bedroom dwelling at Third Floor Level as well as the refurbishment of WC and storage areas in the stair core area to the rear of the buildings. The proposed development includes the replacement of all windows to the front and rear elevations to no. 14 & 15. The development also includes the following works to No. 15: alteration to external openings at basement level, minor repairs to the brick front façade, re-setting and re-pointing flags to entrance landing, replacement and upgrading of existing electrical and plumbing services, replacement and upgrading of all existing vents and provision for new extract vent openings in No. 14, repairs and upgrading to internal walls and ceilings, dry lining, fire upgrading of existing timber floors, replacement of internal doors and strengthening of existing floors, replacement and upgrading of all kitchenette and bathroom fittings, wall and floor finishes. The development will also include all ancillary site and services works.

14/15, Kildare Street, Dublin 2

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?