← Back to search

Cherry Orchard Community Childcare, Croftwood Crescent, Cherry Orchard, Dublin 10

GRANT RETENTION PERMISSIO

Planning application 3303/24

Dublin - Dublin City Council

Proposed Development

RETENTION The development consists of a new 30 sqm single-storey temporary childcare classroom in a stand-alone building positioned in the upper part of the existing carpark. The building is finished in grey painted fibre board cladding with metal fascia to match. External works include an accessible ramp and steps.

Application Timeline

  1. Application received

    1 Mar 2024

  2. Decision due

    25 Apr 2024

  3. Decision: GRANT RETENTION PERMISSIO

    25 Apr 2024

  4. Grant issued

    30 May 2024

Application Details

Location
Cherry Orchard Community Childcare, Croftwood Crescent, Cherry Orchard, Dublin 10
Applicant
N/A
Application Type
Retention Permission
Planning Authority
Dublin City Council
Site Area
45 ha

Timeline

Registration Date
1 March 2024
Status
Decision Notice Issued
Decision
GRANT RETENTION PERMISSIO
Decision Date
25 April 2024
Grant Date
30 May 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

13m
4697/22GRANT PERMISSION22 Aug 2022

The development will consist of a new 208sqm single-storey extension to the south of the existing childcare facility containing additional classrooms and associated service spaces. The building is to be clad in timber with a standing seam metal roof to match existing and to include a glazed canopy over connecting walkway to the existing building. External works are to include an expansion of the existing playground area to the west of the building and additional covered bike parking and car parking spaces to the east with relocated car park exit. The whole site is to be surrounded with a continuation of the existing perimeter fence. All with associated services including roof mounted photovoltaic array.

Cherry Orchard Community Childcare, Croftwood Crescent, Cherry Orchard , Ballyfermot , Dublin 10

36m
4592/22APPLICATION DECLARED INVA29 Jul 2022

The development will consist of a new 208sqm extension to the existing childcare facility containing additional classrooms and associated service spaces. The building is to be clad in timber with a standing seam metal roof to match existing and to include a glazed canopy over connecting walkway to the existing building. External works are to include an expansion of the existing playground area to the west of the building and additional bike parking and car parking spaces to the east with relocated car park exit. The whole site is to be surrounded with a continuation of the existing perimeter fence. All with associated services including roof mounted photovoltaic array.

Cherry Orchard Community Childcare, Croftwood Crescent, Cherry Orchard, Dublin 10

72m
4053/22APPLICATION DECLARED INVA24 May 2022

Permission is sought for, 2 No. of 2 bedroom, 2 storey dwellings attached to side of existing dwelling with new vehicular access points to dwellings and associated site works.

20, Croftwood Crescent, Cherry Orchard, Dublin 10

72m
4523/22GRANT PERMISSION21 Jul 2022

Planning permission is sought for 2 No. of 2 bedroom, 2 storey dwellings attached to side of existing dwelling with new vehicular access points to dwellings and associated site works.

20, Croftwood Crescent, Cherry Orchard, Dublin 10

75m
3022/19GRANT PERMISSION17 May 2019

Permission to construct a 2 storey, three bedroom end of terrace house and new vehicular access to front. This will include service connections and associated works.

20, Croftwood Cresent, Cherry Orchard, Ballyfermot, Dublin 10

166m
3246/19GRANT PERMISSION13 Jun 2019

Planning permission for construction of a detached extension "Game Room", to the rear garden.

18, Orchard Lawns, Ballyfermot, Dublin 10

186m
3383/24GRANT PERMISSION14 Mar 2024

The development will consist of a single storey side extension and all associated site works.

30, Croftwood Grove, Ballyfermot, Dublin 10

243m
WEB2565/24GRANT PERMISSION22 Nov 2024

Proposed construction of 2 no. semi-detached two-storey 2-bedroomed dwellings to side of existing dwelling. Shared side entrance between existing dwelling and proposed dwellings. New separate car parking spaces provided to front gardens of new dwellings. Boundary walls to front garden and new boundary wall to rear garden to separate dwellings. New dwellings have single storey extension to rear and porch extension to front. All associated site work included in this application.

Site at side of no. 8 Spiddal Park and no. 90 Oranmore Road, Ballyfermot, Dublin 10, D10 YY39

262m
4886/23GRANT PERMISSION30 Nov 2023

Permission for the construction of a two- storey classroom building for additional crèche facilities and all associated site development works to the east elevation at the south corner of St. Ultan's Campus.

St. Ultan's Primary School, St. Ultan's Campus, Cherry Orchard Ave, Dublin 10

262m
4587/23APPLICATION DECLARED INVA5 Oct 2023

Planning permission is sought for the construction of an ASD school playground area and all associated site development works to the west elevation at south corner of the St. Ultan's Campus, Cherry Orchard Avenue, Cherry Orchard, Dublin 10.

St. Ultan's Primary School, St. Ultan's Campus, Cherry Orchard Avenue, Cherry Orchard, Dublin 10, D10 NY53

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?