Hammond Lane, Smithfield, Dublin 7

GRANT PERMISSION AND RETE

Planning application 3438/20

Dublin - Dublin City Council

Proposed Development

PERMISSION & RETENTION: Permission and retention permission is sought for a period of 3 years for a temporary construction compound associated with the implementation of the planning permission granted under DCC Register Reference 2024/16 (ABP Ref. PL29N.246933), as amended, on a site of 4,456 sq.m and bounded by Hammond Lane, Church Street, Lincoln Lane and the Luas Red Line, Dublin 7. The development consists of the retention of stacked welfare and office cabins on the northern part of the site ranging in height from 5.09m to 8.08m, and stacked office and staff storage cabins located on the southern part of the site ranging in height from 2.57m to 5.29m; 1 no. security hut and 1 no. turnstile hut; (total floor area of 1489.7 sq.m); 4 no. fully sealed septic tanks; 4 no. hardcore parking areas accommodating 12 no. vehicles to the north of the site, 6 no. spaces in the centre of the site, and 22 no. spaces provided over 2 no. locations to the south of the site; 1 no. vehicular access to Hammond Lane; 1 no. pedestrian entrance to Lincoln Lane; 1 no. facade sample display area; and, all associated development and works. Permission is sought for development that will consist of: Stacked welfare and office cabins located to the centre of the site (height 5.17m) and ; office cabins located to the south east of the site ranging in height from 2.65m to 5.19m (total cabin space floor area of 172 sq.m).

Application Timeline

  1. Application received

    23 Sept 2020

  2. Decision due

    17 Nov 2020

  3. Decision: GRANT PERMISSION AND RETE

    17 Nov 2020

  4. Grant issued

    6 Jan 2021

Application Details

Location
Hammond Lane, Smithfield, Dublin 7
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
4453.73 ha

Timeline

Registration Date
23 September 2020
Status
Decision Notice Issued
Decision
GRANT PERMISSION AND RETE
Decision Date
17 November 2020
Grant Date
6 January 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

40m
4415/24APPLICATION DECLARED INVA26 Nov 2024

Planning permission for a one bed apartment for the development will consist of transforming the property into short term rental accomodation.

Apartment 94 The Chandler, Arran quay, Dublin 2, D07K138

40m
4454/24APPLICATION DECLARED INVA17 Dec 2024

Permission to change of use of a one bedroom apartment from residential use to short-term rental accommodation.

94 The Chandler, Arran Quay, Dublin 7, D07K138

42m
WEB1086/23GRANT PERMISSION9 Feb 2023

The development will consist of a proposed individually backlit halo illuminated brushed stainless letters and logo to the front (east) facade at first floor along with all associated siteworks.

158-159, Church Street, Dublin 7 D07 WDX8

87m
4290/23GRANT PERMISSION11 Aug 2023

PROTECTED STRUCTURE: the development consists of amendment to the grant of permission Reg. Ref. 2354/20 for the change of use from offices to a tourist hostel. The amendments comprise the following: (i) the 3-storey rear extension is not to be constructed, (ii) the common room is now to be at entry level, the kitchen/dining located in the basement, (iii) the provision of a partition at third-floor level.

7 Arran Quay, Smithfield, Dublin 7

87m
2354/20GRANT PERMISSION26 Feb 2020

PROTECTED STRUCTURE: Planning Permission at No. 7 Arran Quay, Smithfield, Dublin 7, a protected structure, for the following development: The change of use from office to use as a tourist hostel (22 guests): lowering of part of the basement level floor by 400mm: external steps from basement up to rear yard: refurbishment of the ground floor return with new window openings: a 3-storey rear extension (1st-3rd floor) accommodating new bathrooms with steel frame and timber cladding.

7, Arran Quay, Smithfield, Dublin, 7

89m
3474/19GRANT PERMISSION12 Jul 2019

PROTECTED STRUCTURE: Planning permission for the following development: The provision of an opaque, glazed shower room to the rear of the top (fourth) floor room.

5, Arran Quay, Smithfield, Dublin 7

89m
2580/19REFUSE PERMISSION25 Mar 2019

Planning permission for the following development. GROUND FLOOR: the change of use (except hallway) from residential to use as a coffee shop, a new glass door to replace the LHS front door. FIRST-FLOOR: the provision of a shower-room, blocking up 1 doorway and provision of kitchen units. SECOND-FLOOR: the provision of a shower-room, blocking up 1 doorway and provision of kitchen units. THIRD-FLOOR: the provision of a shower-room. FOURTH-FLOOR: the provision of kitchen units, the change of use of the upper floors from residential, to use for short-term letting.

5, Arran Quay, Smithfield, Dublin 7

106m
2372/21GRANT PERMISSION11 Mar 2021

Permission for continued use of roofgarden development previously granted permission under 4268/15. The development consisted of placing a 108m2 pavilion on the existing roof at 6th floor level, flanked by over 200m2 of planting, and placement of a safety balustrade set back from the parapet, and is sought to be kept permanently.

Kings Building, Church Street, Dublin 7

115m
3161/22GRANT PERMISSION27 Jan 2022

PROTECTED STRUCTURE: The development will consist of alterations to the existing internal layout to provide a new toilet layout, conversion of existing canteen to office use including new seperate kitchen and insertion of new tea station in entrance foyer, and general repair and upgrading works to church space, entrance foyer, Library room and offices in rear annex all with associated services alterations.

St. Paul's Church, Arran Quay, Dublin 7

125m
2176/19GRANT PERMISSION1 Feb 2019

Planning permission for development at the former 'Irish Distillers Building', Smithfield, Dublin 7 (the site is bounded by Phoenix Street to the south; Smithfield Square to the west; New Church Street to the north and Bow Street to the east). The proposed development consists of amendments to a previously permitted development under DCC Planning Ref. 2024/16 (An Bord Pleanala Ref. PL29N.246933) to include the provision of rooftop plant and omission of Condition 4 of planning permission DCC Reg. Ref. 2024/16 (An Bord Pleanala Ref. PL29N.246933). The proposed rooftop plant will be enclosed by an aluminium louvre screen. The top level of the screen sits at +36.310m, approximately 2.55m above corresponding parapet level (+33.670m). A Photovoltaic (PV) solar panel area will be provided at roof level, immediately to the south of the enclosed plant area. Other internal and associated external alterations include the infill of the permitted setback at the north-western corner (junction of New Church Street and Smithfield Square) of the permitted building at ground and first floor level, to provide an additional 31.8 sq.m (GFA) of retail/restaurant floorspace at ground floor level (to permitted Retail Unit No. 1) and the provision of an additional 13.5 sq.m (GFA) of office floorspace at first floor level and thereby increasing the previously approved office floorspace from 18,236 sq.m (GFA) to 18,249.5 sq.m (GFA).

Former 'Irish Distillers Building', Smithfield, Dublin 7

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?