Lissadell, 10a Main Street, Raheny, Dublin 5, D05 F9P8
GRANT PERMISSIONPlanning application 3711/22
Dublin - Dublin City Council
Proposed Development
Permission for change of use from residential to class 1 retail (shop); new widened glazed entrance door; painted signage to front elevation and to neighbouring building in same ownership; and all associated site works including 2no. car parking spaces and 3no. bike stands.
Application Timeline
Application received
11 Apr 2022
Decision: GRANT PERMISSION
2 Jun 2022
Decision due
3 Jun 2022
Grant issued
15 Jul 2022
Application Details
- Location
- Lissadell, 10a Main Street, Raheny, Dublin 5, D05 F9P8.
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 1195 ha
Timeline
- Registration Date
- 11 April 2022
- Status
- Decision Notice Issued
- Decision
- GRANT PERMISSION
- Decision Date
- 2 June 2022
- Grant Date
- 15 July 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
PROTECTED STRUCTURE: Lands located to the south of Howth Road, Raheny, Dublin 5. The application site boundary crosses the River Santry and includes lands on the eastern and western banks together with the following structures O’Doherty House (D05 C598), and an existing single storey structure with an Eircode of DO5 P978 Howth Road, Dublin 5 and a small portion of lands within the curtilage of Saint Assam’s Church, Howth Road, Raheny, Dublin 5, D05T8N8 (A Protected Structure). The proposed development will consist of (i) The removal of a section of the existing foul line which serves the existing O’Doherty House and Saint Assam’s Church. (ii) the construction of a new replacement 225mm concrete foul sewer line which will serve O’Doherty House and Saint Assam’s Church. The new foul sewer line will cross the River Santry and will connect with Uisce Éireann’s existing 600mm foul sewer on the western side of the River Santry. Tree removals will be required to facilitate the proposed removal and replacement of foul drainage infrastructure at this location. The proposed development also includes: (iii) the removal of the existing pedestrian access point to O’Doherty House off Howth Road, and the removal of a section of the boundary wall at this location to facilitate the provision of a temporary construction access to the site to facilitate the proposed drainage works; and (iv) all associated site and infrastructural works necessary to facilitate the proposed development. The site is within the curtilage of Saint Assam’s Church, Howth Road, which is a Protected Structure. This application is accompanied by a Natura Impact Statement.
Lands located to the south of Howth Road, Raheny, Dublin 5
PROTECTED STRUCTURE: (i) The removal of a section of the existing foul line which serves the existing O’Doherty House and Saint Assam’s Church; (ii) the construction of a new replacement 225mm concrete foul sewer line which will serve O’Doherty House and Saint Assam’s Church. The new foul sewer line will cross the River Santry and will connect with Uisce Éireann’s existing 600mm foul sewer on the western side of the River Santry. Tree removals will be required to facilitate the proposed removal and replacement of foul drainage infrastructure at this location. The proposed development also includes: (iii) the removal of the existing pedestrian access point to O’Doherty House off Howth Road, and the removal of a section of the boundary wall at this location to facilitate the provision of a temporary construction access to the site to facilitate the proposed drainage works; and (iv) all associated site and infrastructural works necessary to facilitate the proposed development. The site is within the curtilage of Saint Assam’s Church, Howth Road, which is a Protected Structure. This application is accompanied by a Natura Impact Statement.
Lands located to the south of Howth Road, Raheny, Dublin 5. The application site boundary crosses the River Santry and includes lands on the eastern and western banks together with the following, structures O’Doherty House (D05 C598), and an existing sin
Permission for development at existing vacant retail unit on ground floor 8b Main Street, Raheny, Dublin 5, D05 P2X4. The development will consist of the change of use of the ground floor retail unit to cafe / restaurant use, comprised of kitchen, provision of sanitary accommodation, service and seating area within the existing unit. New replacement signage will be installed on the existing shopfront fascia. Permission is also sought for the installation of air conditioning grill vents at high level on side, south facing laneway.
8b, Main Street, Raheny, Dublin 5, D05 P2X4
(a) installing a retractable awning to the existing shopfront and (b) installing a projecting bakery sign board to the façade.
10B, Main Street, Raheny, Dublin 5 D05 DE88
PROTECTED STRUCTURE The development will consist of: The renovation, refurbishment and extension of the existing Protected Structure to provide for an upgraded Sports Club facility. Proposed works to the existing Protected Structure are inclusive of: (1) demolition of the existing non-original 20th century single-storey toilet block extension to the south of the main building; (2) removal of existing internal staircase from ground to first floor levels including false ceiling over, and infilling of the stair void with a new timber floor to match existing; (3) removal of non-original stud partition walls at ground and first floor levels and removal of existing internal door openings at ground and first floor levels; (4) removal of existing fire escape stair at the southwestern corner of the building and the provision of a new fire escape stair in its place; (5) internal reconfiguration at ground and first floor levels of the existing building, including the addition of new stud partition walls and internal door openings to accommodate a Gym, a Club Social Hub, and a Club Office all at ground floor level; and a Sports Hall and Club Meeting Room at first floor level. Internal works at first floor level are also inclusive of: (6) remedial works to existing timber floor where required; remodelling of timber floor projecting into window bays along the north elevation, cutting back the floor to form a void and installation of aluminium fire-rated glazing; and remodelling of existing non-original fire escape door to the south elevation. External works to the existing Protected Structure include: (7) removal of modern brickwork to allow for a new window in the existing oculus opening over the arch on the western elevation; (8) remodelling of 3 no. existing window openings to the southern elevation at ground floor level to form 2 no. arched door openings and 1 no. arched window opening; (9) remodelling of 3 no. existing window openings to the southern elevation at first floor level, with one opening to be removed and 2 no. arched door openings being created; (10) repointing of stone work using lime pointing where required; (11) removal of existing aluminium gutters and replacement with new cast aluminium gutters; (12) at roof level, removal and replacement of slates and felt covering to roof over entrances on the southern and northern elevations; and removal of a number of slates to the main roof to allow for inspection and replacement of wall plate and rafter ends where necessary. The proposed development will also provide for: (13) the construction of a 2-storey flat roofed extension to the south of the existing Protected Structure, with an enclosed plant area at roof level. Internally the extension will comprise an entrance lobby, commercial unit, storage space and bathroom facilities (including an accessible W.C), all at ground floor level. Access to the first-floor level is available via a new internal platform lift and stairs, with the first floor level comprising wellness/treatment rooms for club use, shower facilities, a plant room and circulation space; (14) the proposed extension will be connected to the Protected Structure via 3 no. inter-connecting doorways at ground floor level and 2 no. inter-connecting doorways at first floor level. These linkages will comprise frameless structural glazing with internal glass fins; (15) the main pedestrian access to the premises is proposed off Main Street to the east via the existing double gates, a new stair access and platform lift are proposed inside this access. A bicycle parking entrance and fire escape are available along the north-western site boundary, and a secondary entrance and fire escape to the Protected Structure is available along the northern site boundary. The following works are also proposed: (16) provision of outdoor seating; (17) provision 16 no. bicycle parking spaces to the north of the Protected Structure in the form of Sheffield stands; (18) provision of new club signage on the eastern elevation of the proposed extension; and, (19) associated site and infrastructural works which include; foul and surface water drainage, hard and soft landscaping, boundary treatments, provision of solar PV panels at roof level, internal mechanical and electrical works, lighting, bin storage and all associated site works necessary to facilitate the development. The subject property, Saint Assam's Community Hall, Saint Assam's Church, is a Protected Structure.
Saint Assam's Community Hall, Saint Assam's Church, Howth Road, Dublin 5
Planning permission is sought for a new vehicular entrance and ancillary site works.
18 Main Street, Raheny, Dublin 5, D05 VP95
To replace the existing advertising lightboxes within the bus shelter, each with an advertising display area of 1.8m x 1.2m on each face with a double-sided unit that includes a digital advertising display area of 1.6 m x .93m on each side, along with all associated site works and services, on the public footpath at Bus Stop 600, Howth road, (opp Our Lady’s Mother of Devine Grace Church), Dublin 5.
Bus Stop 600, Howth Road, opposite church, Dublin 5
Planning permission is sought for a new vehicular entrance with inward opening gates and ancillary site works.
20, Main Street, Raheny, Dublin 5
RETENTION: The development consists of a children's breakfast club, preschool and after school care centre, with opening hours 7.45am to 6pm weekdays. (This is an application for continuation of previously granted permissions 2150/06 and 6447/07 for an after school day care centre).
29, Main Street, Raheny, Dublin 5
Change of use from retail use to recreational use of two existing rooms and toilet facilities located at rear of existing single storey building, installation of proposed new signage at the east side boundary wall at front of the site and ancillary site works.
13, Main Street, Raheny, Dublin 5
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?