← Back to search

Cafe 53, Lee Road, Dublin Industrial Estate, Glasnevin, Dublin 11

GRANT PERMISSION AND RETE

Planning application 3786/21

Dublin - Dublin City Council

Proposed Development

RETENTION AND PERMISSION: Retention permission is sought for outside seating area and retractable canopy 5.6m x 2.4m to side (west) yard, Planning permission is sought for outside seating area and steel/glass canopy 7.6m x 2.4m to front yard, all at existing single storey detached café.

Application Timeline

  1. Application received

    2 Nov 2021

  2. Decision: GRANT PERMISSION AND RETE

    4 Jan 2022

  3. Decision due

    5 Jan 2022

  4. Grant issued

    15 Feb 2022

Application Details

Location
Cafe 53, Lee Road, Dublin Industrial Estate, Glasnevin, Dublin 11
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
223.96 ha

Timeline

Registration Date
2 November 2021
Status
Decision Notice Issued
Decision
GRANT PERMISSION AND RETE
Decision Date
4 January 2022
Grant Date
15 February 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

100m
3192/21GRANT RETENTION PERMISSIO21 Jul 2021

RETENTION: Permission sought to retain rear garden single storey structure circa 49.5 sq. metre for storage and home office use.

154, Claremont Court, Dublin 11

117m
3061/21GRANT RETENTION PERMISSIO30 Jun 2021

RETENTION: Retention permission for the retention of the enclosed single storey porch at the front of the existing dwelling.

117, Claremont Court, Glasnevin, Dublin 11, D11 K3V9

136m
2531/21GRANT RETENTION PERMISSIO6 Apr 2021

RETENTION: The development will consist of a modified shipping container, 3.05m x 2.5m, alongside a seating area, to be used as a facility for the preparation, sale and consumption of hot drinks and hot food during the hours of 7.30am to 8pm Monday to Sunday.

Unit 135, Slaney Road, Glasnevin, Dublin 11

171m
4230/22GRANT PERMISSION14 Jun 2022

Permission for development at this site (c. 0.136 ha) comprises the use of an existing warehouse unit as a 'cloud kitchen' comprising remote commissary kitchen pods and ancillary customer delivery service with associate site works including : internal subdivision and fit out, new external ventilation grilles and ducting replacement of existing external compound with new external refuse store (c. 21.3 sq.m.), 7 no. new bicycle stands and 2 no. new illuminated signs (c 3m x 1m) affixed to the south-east and south west building elevations.

Unit 137A Slaney Close, Dublin Industrial Estate, Glasnevin, Dublin 11

171m
WEB1819/23APPLICATION DECLARED INVA27 Sept 2023

The proposed development will consist of the construction of a free standing single storey ESB Sub-Station to the side boundary of the site, (northeast side) and all associated site works.

Unit 137a, Slaney Close and Slaney Road, Dublin Industrial Estate, Glasnevin, Dublin 11

171m
WEB1966/23GRANT PERMISSION6 Nov 2023

The proposed development will consist of the construction of a free standing single storey ESB Sub-Station (approx. 21.07 sq.m) to the side boundary of the site, (northeast side) and all associated site works.

137a Slaney Close Road, Dublin 11, D11 FC79

171m
WEB1884/23APPLICATION DECLARED INVA13 Oct 2023

The proposed development will consist of the construction of a free standing single storey ESB Sub-Station (approx. 21.07 sq.m) to the side boundary of the site, (northeast side) and all associated site works.

Unit 137a, Slaney Close and Slaney Road, Dublin Industrial Estate, Dublin 11

184m
WEB1427/20APPLICATION DECLARED INVA7 Jul 2020

We, Chadwicks Group Limited, intend to apply for full planning permission for development at Unit 132 Slaney Road, Dublin Industrial Estate, Glasnevin, Dublin 11. The development will consist of the widening of the existing vehicular access at the front (north) of the site along Slaney Road, installation of new gates to suit the widened vehicle entrance, the creation of a new pedestrian access with associated gate at the front (north) of the site along Slaney Road and all associated site works.

Unit 132, Slaney Road, Dublin Industrial Estate, Glasnevin, Dublin D11 W729.

184m
WEB1443/20GRANT PERMISSION14 Jul 2020

The development will consist of the widening of the existing vehicular access at the front (north) of the site along Slaney Road, installation of new gates to suit the widened vehicle entrance, the creation of a new pedestrian access with associated gate at the front (north) of the site along Slaney Road and all associated site works.

Unit 132, Slaney Road, Dublin Industrial Estate, Dublin 11

184m
WEB1818/24GRANT PERMISSION8 Jul 2024

PERMISSION for the installation of new external steel cantilever racking, for storage of builder’s materials, on a new concrete base, to the rear of the site, along the east boundary fence.

132 Slaney Road, Glasnevin, Dublin 11

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?