Dublin City Council Headquarters, Civic Offices, Block 1, Woodquay, Dublin 8

GRANT PERMISSION

Planning application 3871/24

Dublin - Dublin City Council

Proposed Development

Permission to install spectrum monitoring equipment on the chimney of block 1. This spectrum monitoring equipment consists of three receive only antennas, along with a radio control unit.

Application Timeline

  1. Application received

    18 Jun 2024

  2. Decision due

    12 Aug 2024

  3. Decision: GRANT PERMISSION

    12 Aug 2024

  4. Grant issued

    24 Sept 2024

Application Details

Location
Dublin City Council Headquarters, Civic Offices, Block 1, Woodquay, Dublin 8
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
23.2 ha

Timeline

Registration Date
18 June 2024
Status
Decision Notice Issued
Decision
GRANT PERMISSION
Decision Date
12 August 2024
Grant Date
24 September 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

3m
3759/24APPLICATION DECLARED INVA27 May 2024

The Commission for Communications Regulations (ComReg) intend to apply for permission to install spectrum monitoring equipment on the chimney of Block 1 Dublin City Council Headquarters, Civic Offices, Woodquay, Dublin 8. This spectrum monitoring equipment consists of three receive only antennas, along with a radio control unit.

Dublin City Council Headquarters, Civic Offices, Wood Quay, Dublin 8

50m
2545/21Decision Notice Issued7 Apr 2021

The development will consist of: 1. Demolition of existing set-back fifth floor/roof level access stairs, lift motor areas, plant areas, roof and external facades; 2. Demolition of parts of external facades/fenestration at set-back fourth floor/mansard roof level; 3. Construction of extended set-back fifth floor/mansard roof level incorporating 8 no. new hotel bedrooms & associated circulation and ancillary areas; 4. Construction of alterations at existing set-back fourth floor level incorporating revised layout with 3 no. additional new hotel bedrooms & associated circulation and ancillary areas; 5. Construction of alterations to facades/fenestration to altered set-back fourth floor/mansard level; 6. Construction of all consequent internal, external and façade alterations; & 7. All ancillary site development and service works.

Handel's Hotel, 16-18 Fishamble Street, Dublin 8

93m
4464/23APPLICATION DECLARED INVA13 Sept 2023

PROTECTED STRUCTURE: Permission to erect two 7.5 metre high support poles with stay wires each carrying telecommunications antennas and dishes together with two equipment cabinets and associated equipment upon the building rooftop of 14-16 Lord Edward Street (a protected structure), Temple Bar, Dublin 2.

14-16, Lord Edward Street, Temple Bar, Dublin 2, D02 YC63

100m
3212/23WITHDRAWN ARTICLE 33 (NO13 Feb 2023

PROTECTED STRUCTURE: Development will consist of the removal of two timber display cases on the railings, erection of three printed aluminium sheet signs on the railings, and the widening of the main vehicular gate to accommodate delivery vehicles and fire tenders.

Christ Church Cathedral, Christ Church Place, Dublin 8, D08 TF98

100m
3123/24GRANT PERMISSION AND RETE31 Jan 2024

PROTECTED STRUCTURE . PERMISSION & RETENTION. . Permission and retention for development at this site: Christ Church Cathedral, Christ Church Place, Dublin 8, (a protected structure). Development will consist of widening of main vehicular gate to accommodate delivery vehicles and fire tenders and retention of rearrangement of signage and display cases on perimeter railings.

Christ Church Cathedral, Christ Church Place, Dublin 8

100m
4745/23APPLICATION DECLARED INVA8 Nov 2023

PROTECTED STRUCTURE: RETENTION / PERMISSION: Development will consist of widening of main vehicular gate to accommodate delivery vehicles and fire tenders and retention of rearrangement of signage and display cases on perimeter railings.

Christ Church Cathedral, Christ Church Place, Dublin 8, D08 TF98

104m
3589/20GRANT PERMISSION19 Oct 2020

Permission for internal re-configuration of the existing Healthcare Building along with the addition of 3.no single storey external ancillary rooms (27 m2) and 3 storey lift shaft to the rear (14m2), (total additional area 41m2) and all associated site works and services.

37-41, Castle Street, Dublin 2 D02 H773

118m
2357/21GRANT PERMISSION8 Mar 2021

Planning permission for replacement of existing shopfronts and install new shopfront streetscape incorporating 5 no. retail units and apartment block entrance (6 no. in total) and all associated site development works.

Castlegate Apartment, Lord Edward Street, Dublin 2

121m
4210/23REFUSE PERMISSION25 Jul 2023

PERMISSION:The development will consist of the following: (i) change of use of the existing property from office to short-stay residential use through the provision of 4 no. short-stay apartment units (1 no. studio, 1 no. one-bed and 2 no. two-bed units); (ii) demolition of existing internal walls and provision of new partition walls and internal doors where required at ground, first, second and third floor levels, and provision of new kitchen and bathroom fittings to each unit; (iii) demolition of brick recessed opening to the front at third-floor level and replacement with new window opening with finish to match that as existing; (iv) alterations to rear opes at ground floor level inclusive of the removal of existing garage door and provision of 2 no. new opes to facilitate access to bin store provided at ground floor level from St. Michael's Close, and fenestration to living room, with external wall finishes to match that as existing along St. Michael's Close; (v) alterations to rear opes at first floor level including the removal of glazed screen and door and replacement with new insulated external wall and external access doors; (vi) alterations to rear opes at second floor level including the removal of 2 no. existing opes and provision of 1 no. ope to provide fenestration with finishes to match that as existing; (vii) removal of steps and guarding at first floor rear terrace and replacement with pedestal paving and glass barrier all along St. Michael's Close; (vii) alterations to northern elevation within existing courtyard inclusive of replacement of existing windows at first and second floor level with insulated masonry rendered to match existing and replacement of existing windows at first, second and third floor level with 60-minute fire rated windows; and (ix) all ancillary works, inclusive of planting to facilitate the development.

No.4, Inns Court, Winetavern Street, Dublin 8, D08XY00

121m
4287/23REFUSE PERMISSION11 Aug 2023

The development will consist of the following : (i) alterations to rear opes at ground floor level inclusive of the removal of existing garage door and provision of 2 no. new opes to facilitate access to bin store provided at ground floor level from St. Michael's Close and fenestration to living room with external wall finishes to match that as existing along St. Michael's Close; (ii) alterations to rear opes at first floor level including the removal of glazed screen and door and replacement with new insulated external wall and external access doors; (iii) alterations to rear opes at second floor level including the removal of 2 no. existing opes and provision of 1 no. ope to provide fenestration with finishes to match that as existing; (iv) alterations to northern elevation within existing courtyard inclusive of replacement of existing windows at first and second floor level with insulated masonry rendered to match existing and replacement of existing windows at first, second and third floor level with 60-minute fire rated windows; (v) removal of steps and guarding at first floor rear terrace and replacement with pedestal paving and glass barrier all along St. Michael's Close; (vi) demolition of existing internal walls and provision of new partition walls and internal doors where required at ground, first, second and third floor levels, and provision of new kitchen and bathroom fittings to each unit; (vii) demolition of brick recessed opening to the front at third-floor level and replacement with new window opening with finish to match that as existing; (viii) a temporary 5-year change of use of the existing property from office to short-stay residential use through the provision of 4 no. short-stay apartment units (1 no. studio, 1 no. one-bed and 2 no. two-bed units); (ix) all ancillary works, inclusive of planting, all to facilitate the proposed development.

4 Inns Court, Winetavern Street, Dublin 8, D08 XY00