Bonnington Hotel, Swords Road, Whitehall, Dublin 9
GRANT PERMISSIONPlanning application 4178/24
Dublin - Dublin City Council
Proposed Development
Change of use of a single storey building constructed to the rear of the hotel. The building was originally approved as a Conference Centre, associated with the hotel. A series of temporary permissions were granted to allow music and dancing in association with the use of this building and those permissions have now expired. Permission is now sought to use this area as a standard hotel function room for conferences, functions and other similar uses associated with a hotel.
Application Timeline
Application received
20 Aug 2024
Further information requested
14 Oct 2024
Further information received
1 Nov 2024
Decision: GRANT PERMISSION
21 Nov 2024
Decision due
28 Nov 2024
Appeal submitted
19 Dec 2024
Grant issued
1 May 2025
Appeal decided: GRANT PERMISSION
1 May 2025
Application Details
- Location
- Bonnington Hotel, Swords Road, Whitehall, Dublin 9
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 6595 ha
Timeline
- Registration Date
- 20 August 2024
- Status
- Appeal Decided
- Decision
- GRANT PERMISSION
- Decision Date
- 21 November 2024
- Grant Date
- 1 May 2025
An Coimisiún Pleanála Appeal
- Appeal Reference
- ABP-321496-24
- Decision
- GRANT PERMISSION
- Submitted
- 19 December 2024
- Decided
- 1 May 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission was granted on 12 February 2019 by An Bord Pleanala (Reg. Ref. 3353/18 and ABP-302507), for a period of 2 years to operate the conference centre at the Hotel subject to conditions relating to a) the use and opening hours of the conference centre and b) the noise level not to be exceeded from the conference centre. Condition three of the permission required the operation of the conference centre to be reviewed before February 2021. An application was submitted (Reg. Ref. 3229/20) before that date but was subsequently considered withdrawn by the Planning Authority. This application seeks to relodge that application and permission is now sought to continue to operate the centre subject to the remaining conditions in the permissions applying to the centre and without the need to repeatedly apply every 2 years.
The Bonnington Hotel, Swords Road, Whitehall, Dublin 9
RETENTION: For the a) retention permission for externally illuminated signs promoting supermarket and restaurant in three positions on the tower (East, North and West face), b) retention permission for internally LED illuminated replacement sign on and over entrance canopy to hotel on west elevation.
Bonnington (formerly The Regency) Hotel on Swords Road, Whitehall, Dublin 9
RETENTION PERMISSION for (a) externally illuminated signs promoting supermarket and restaurant in three positions on the tower (east, north and west face) (b) internally LED illuminated replacement sign on and over entrance canopy to hotel on west elevation.
The Bonnington Hotel, Swords Road, Dublin 9
RETENTION PERMISSION for (a) externally illuminated signs promoting supermarket and restaurant in three positions on the tower, (east, north and west face), (b) retention permission for internally LED illuminated replacement sign on and over entrance canopy to the hotel on west elevation.
The Bonnington Hotel Swords Road, Dublin 9
The development consists of permission was granted on 12th February 2019 by An Bord Pleanala (Reg. Ref. 3353/18 and ABP-302507), for a period of 2 years to operate the conference centre at the hotel subject to conditions relating to (a) the use and opening hours of the conference centre, (b) the noise level not to be exceeded from the conference centre. Condition three of the permission required the operation of the conference centre to be reviewed before February 2021. That permission has now expired. An application was submitted (Reg. Ref. 3529/20) before that date but was subsequently considered withdrawn by the Planning Authority. This application seeks to relodge that application and permission is now sought to continue to operate the centre subject to the remaining conditions in the permission applying to the centre and without the need to repeatedly apply every 2 years.
Bonnington Hotel, Swords Road, Whitehall, Dublin 9
The development consists of : Permission was granted on 12th February 2019 by An Pleanala (Reg. Ref. 3353/18 and ABP-302507), for a period of 2 years to operate the conference centre at the hotel subject to conditions relating to (a) the use and opening hours of the conference centre, (b) the noise level not to be exceeded from the conference centre. Condition three of the permission required the operation of the conference centre to be reviewed before February 2021. An application was submitted (Reg. Ref. 3229/20) before that date but was subsequently considered withdrawn by the Planning Authority. This applications seeks to relodge that and permission is now sought to continue to operate the centre subject to the remaining conditions in the permissions applying to the centre and without the need to repeatedly apply every 2 years.
Bonnington Hotel, Swords Road, Whitehall, Dublin 9
Planning permission is sought to carry out a development involving the demolition of an existing single storey building, (565 sq.m) in use as a retail unit, to the front of the Bonnington (formerly Regency) Hotel and the construction of a 5, 6 and 7 storey building as a separate room only hotel at the Bonnington Hotel site on Swords Road, Whitehall, Dublin 9. The new building (with a total floor area of 8,768sq.m) will be used as a room-only hotel containing a reception area, coffee shop (350sq.m) and work space (78sq.m) for guests and an ESB substation at ground floor, a total of 234 guest bedrooms on the upper floors and a double basement with 142 car parking spaces and 76 bicycle spaces for use by the hotel. The proposed development will also contain services and all other ancillary works to service the hotel and will involve the reconfiguration of the existing car parking and landscaping to the existing hotel.
The Bonnington Hotel site on Swords Road, Whitehall, Dublin 9
Permission is sought by Liffeyfield Ltd for development at the Bonnington Hotel. Permission was granted on 12 February 2019 by An Bord Pleanala (Reg. Ref. 3353/18 and ABP - 302507), for a period of 2 years to operate the conference centre at the Hotel subject to conditions relating to a) the use and opening hours of the conference centre and b) the noise level not to be exceeded from the conference centre. Condition three of the permission required the operation of the conference centre to be reviewed before February 2021. Permission is now sought to continue to operate the centre subject to the remaining conditions in the permissions applying to the centre and without the need to reapply again in two years time.
Bonnington Hotel, Swords Road, Whitehall, Dublin 9
Permission was granted on 12 February 2019 by An Bord Pleanala (Reg. Ref. 3353/18 and ABP-302507), for a period of 2 years to operate the conference centre at the Hotel subject to conditions relating to a) the use and opening hours of the conference centre and b) the noise level not to be exceeded from the conference centre. Condition three of the permission required the operation of the conference centre to be reviewed before February 2021. An application was submitted (Reg, Ref. 3229/20) before that date but was subsequently considered withdrawn by the Planning Authority. This application seeks to relodge that application and permission is now sought to continue to operate the centre subject to the remaining conditions in the permissions applying to the centre and without the need to repeatedly apply every 2 years.
Bonnington Hotel, Swords Road, Whitehall, Dublin 9
Permission is sought by Regan Development Ltd for a development at the Bonnington Hotel. Permission was granted on 12 February 2019 by An Bord Pleanala (Reg. Ref. 3353/18 and ABP 302507), for a period of 2 years to operate the conference centre at the Hotel subject to conditions relating to a ) the use and opening hours of the conference centre and b) the noise levels not to be exceeded from the conference centre. Condition three of the permission required the operation of the conference centre to be reviewed before February 2021. Permission is now sought to continue to operate the centre subject to the remaining conditions in the permissions applying to the centre and without the need to reapply again in 2 years time.