Proposed Development
The development will consist of internal refurbishment works of the existing dwelling demolition of rear ground portion of wall and construction of a two storey extension comprising of first floor bedroom and ensuite over living/kitchen area.
Application Timeline
Application received
17 Oct 2019
Further information requested
3 Dec 2019
Further information received
8 Jan 2020
Decision: GRANT PERMISSION
31 Jan 2020
Decision due
4 Feb 2020
Grant issued
20 Mar 2020
Application Details
- Location
- 22, Ash Street, Dublin 8
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 67.9 ha
Timeline
- Registration Date
- 17 October 2019Other applications received that week
- Status
- Decision Notice Issued
- Decision
- GRANT PERMISSION
- Decision Date
- 31 January 2020
- Grant Date
- 20 March 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The development will consist of a proposed new shopfront and associated signage for café as submitted under Reg.Ref: WEB1757/24.
58/59, Meath St, The Liberties, Dublin 8, D08 F8K0
The development will consist of: 1. The demolition of the existing roof over the first floor level to the rear of the building; 2. Construction of new roof over first floor level to the rear of the building; 3. The change of use of all areas at ground floor level and first floor level from shop use to restaurant use; 4. Removal of existing shopfront and signage onto Thomas Street; 5. Installation of new shopfront and signage and retractable awning onto Thomas Street; and 6. All ancillary internal alterations, site development works and services.
38 Thomas Street, Dublin 8
The development will consist of the demolition of the existing structures on site and the construction of a new 47 no. bedroom hotel development across basement to 6th floor level, with direct access from Thomas Court. The development also includes associated reception area, bar, seating/dining area, kitchen, staff areas, ancillary storage, toilets, mechanical plant areas, water tank and attenuation tank. All with associated bin storage, mechanical plant at roof level, signage, lighting and site development works.
No. 1-3 Thomas Court, Dublin 8
Permission for the removal of an existing mechanical vehicular gate to be replaced with a similar gate positioned closer to the street building line.
Block B, Castle Gate Apartments, Castle Street, Dublin 2.
Permission for the removal of an existing mechanical vehicular gate to be replaced with a similar gate positioned closer to the street building line at Block B, Castle Gate Apartments, Castle Street, Dublin 2.
Block B, Castle Gate Apartments, Castle Street, Dublin 2.
The proposed development includes additional two floors on top of existing three storey building including removal of existing roof and a new lift shaft, to the rear of the premises, to serve all five storeys. The proposed new third and fourth floors are comprising of 2 types of apartments: 2 No. 2Bed/3p, each with gross floor area of 64.7m2. 2 No. 1 Bed/2p, each with gross floor area of 61.5m2. The proposed total floor area of the apartments with the extension is 795.2sq.m, a gross increase of 323.1sq.m. The floors of the existing building below the proposed additional 2 storeys will have the additional lift extension, and the overall height of the apartments including the proposed will be a maximum of 15.7m.
13-16 Long's Place, Dublin 8
The proposed development comprises a new single storey extension to an existing beer processing facility with plant at roof level. The proposed extension has a total GFA of c.84 sq.m and an overall building height, including the plant area, of c.19.14m (c.24.34m OD). The extension has a flat roof with a small plant area (c. 24sq.m) screened by metal cladding panels and supportive steel frames. The extension will be designed using new composite brown metal cladding similar to existing building materials within the brewery. There will also be associated drainage connections to be made and an enclosed new stair housing is to be provided to allow access to the new first roof extension from the existing beer processing area to the west side of the new extension and all other associated works. The proposed development is located centrally within the brewery and is screened by existing tanks and brewing infrastructure to the south taking into consideration potential views from James's Street. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref No. P0301-04).
Diageo Brewery bounded by James's Street, Watling Street, Victoria Quay and Steeven's Lane, Dublin 8
PERMISSION & RETENTION: 1. Retention and completion of modifications (layout and elevational) to existing two storey building. 2. Proposed change of use (368 s.q.m. ) from approved office/retail use to tourist hostel. 3. Retention of 29 sq.m. single storey bike store/maintenance store.
10/11, Liberty Lane, Dublin 8
PERMISSION & RETENTION:1. Retention and completion of layout and elevational modifications to existing two storey building including partial demolition (39 sq.m.) to create landscaped courtyard and new front boundary fence with piers. 2. Proposed change of use (329 sq.m.) from approved office / retail use to tourist hostel. 3. Retention of 29 sq.m. single storey bike store / maintenance store.
10/11 Liberty Lane, Dublin 8
Change of use of the rear service yard (148 sq.m) at 30 Wexford Street (also accessed off Liberty Lane to the rear) for outdoor licenced use. Also access arrangements to include 3 no. openings in existing party wall between 30 and 31 Wexford Street and external part M accessible platform lift.
Yard at rear of 30, Wexford Street (also accessed from Liberty Lane), Dublin 2
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?