Planning application 4246/19

Dublin - Dublin City Council

Proposed Development

Permission is sought for proposed single storey extensions to side and rear and all associated site, internal and landscaping works.

Application Timeline

  1. Application received

    18 Oct 2019

  2. Decision: GRANT PERMISSION

    10 Dec 2019

  3. Decision due

    12 Dec 2019

  4. Grant issued

    21 Jan 2020

Application Details

Location
22, Oscar Square, Dublin 8, D08 K2H0
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
156.74 ha

Timeline

Registration Date
18 October 2019
Status
Decision Notice Issued
Decision
GRANT PERMISSION
Decision Date
10 December 2019
Grant Date
21 January 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

41m
WEB1598/21GRANT PERMISSION28 May 2021

The removal of two existing brick chimneys from roof.

30, Oscar Square, The Tenters, Dublin 8

41m
WEB1541/20APPLICATION DECLARED INVA11 Aug 2020

-the removal of existing shed to side of house -the construction of a new single storey extension with rooflight to side of house -new velux rooflight to rear of existing house

30, Oscar Square, The Tenters, Dublin 8, D08 W9K0

41m
WEB1547/20GRANT PERMISSION12 Aug 2020

-The removal of existing shed to side of house, -The construction of a new single storey extension with rooflight to side of house and for a new velux rooflight to the rear of the existing house.

30, Oscar Square, The Tenters, Dublin 8, D08 W9X0

43m
3266/20GRANT PERMISSION28 Aug 2020

The proposed development will consist of the demolition of all structures on site (including No. 41 Chamber Street, a habitable house) and construction of a mixed use development of a total of 2,309sqm gross floor area (GFA) to comprise 27 no. apartments (consisting of 11 no. one-bed units; 15 no. two-bed units and 1 no. three-bed unit), and 1 no. retail unit (122sqm GFA) arranged in 2 no. Blocks as follows: Block A is four storeys, rising to five storeys in height at the corner of Chamber Street and Ardee Street, with 1 no. retail unit at ground floor level and 10 no. residential units on the upper floors (first to fourth floor level) with recessed balconies on the north, east and south elevations; Block B is three storeys in height with 17 no. residential units on ground to second floor level and recessed terraces/balconies on southern and eastern elevations, and an external access walkway on northern elevation at first and second floor level. The development will include 60 no. bicycle parking spaces (46 no. internal secure spaces and 14 no. external visitor spaces), bin stores, plant, electrical switch rooms and ESB Substation, controlled pedestrian/cycle access to internal courtyard via Ardee Street, landscape open space areas, boundary treatments, associated signage, lighting and all associated site and development works on a site of 0.15 hectares.

Site at the corner of Chamber Street and Ardee Street, Dublin 8 and including No. 16 Ardee Street, and adjoining yard, and No. 41 Chamber Street.

56m
2962/19GRANT PERMISSION13 May 2019

Planning permission is sought for the demolition of the existing single storey ground floor rear extension and the construction of a two-storey rear extension to the existing terraced dwelling.

41C, Chamber Street, Dublin 8

64m
WEB1094/22GRANT PERMISSION7 Feb 2022

The proposed development will consist of the proposed widening of existing vehicular access and entrance to the front of the property and the proposed construction of a front wall and sliding entrance gate to the front of the property. The proposal also includes ancillary site works, including proposed dish to the footpath to the front to accommodate the proposed vehicular access and entrance to the front and the proposed site works to accommodate parking to the front of the property within the site.

37, Oscar Square, Saint Catherine's Dublin 8

72m
WEB1971/22APPLICATION DECLARED INVA19 Oct 2022

The development will consist of a new single storey rear extension and a new rear dormer with roof terrace at roof level, internal alterations and associated site works.

6, Weaver's Square, Dublin 8

72m
WEB1988/22GRANT PERMISSION26 Oct 2022

The development will consist of a new single storey rear extension and a new rear dormer with roof terrace at roof level, internal alterations and associated site works.

6, Weaver's Square, Dublin 8 D08 RHH4

84m
WEB2208/26APPLICATION DECLARED INVALID19 May 2026

We, Black Sheep Investments Limited, intend to apply for Permission for development at this site: 1-2 Chamber Street, at the junction with Ardee Street and Chamber Street, Dublin 8, D08 H3K5. The development will consists of: (i) Demolition of non-original extension of the existing public house, the Ardee House; (ii) Part-demolition of the existing original fabric of public house structure, with the selective retention of external façades; (iii) Construction of a part six-storey mixed-use development to contain: (a) 14 no. Apartments (4 no. Studios and 10 no. 1-bed units), (b) Community Facility (30 sqm) at ground level, (c) Bike and Bin store at ground level, and (d) Communal Amenity Space (75 sqm) at terrace at Fifth floor; and (iv) All associated site works.

1-2 Chamber Street, at the junction with Ardee Street and Chamber Street, Dublin 8, D08 H3K5

84m
WEB2243/26ADDITIONAL INFORMATION22 May 2026

We, Black Sheep Investments Limited, intend to apply for Permission for development at this site: 1-2 Chamber Street, at the junction with Ardee Street and Chamber Street, Dublin 8, D08 H3K5. The development will consists of: (i) Demolition of non-original extension of the existing public house, the Ardee House; (ii) Part-demolition of the existing original fabric of public house structure, with the selective retention of external façades; (iii) Construction of a part six-storey mixed-use development to contain: (a) 14 no. Apartments (4 no. Studios and 10 no. 1-bed units), (b) Community Facility (30 sqm) at ground level, (c) Bike and Bin store at ground level, and (d) Communal Amenity Space (75 sqm) at terrace at Fifth floor; and (iv) All associated site works.

1-2 Chamber Street, at the junction with Ardee Street and Chamber Street, Dublin 8, D08 H3K5

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?