← Back to search

Luas Broombridge - Hamilton Deport, 7 Broombridge Road, Cabra West, Dublin 7, D07 A978

GRANT PERMISSION

Planning application 4295/23

Dublin - Dublin City Council

Proposed Development

Permission for the installation of solar photovoltaic array to the existing roofs of a tram depot and sanding shed, located within a solar safeguarding zone (SSZ), that will measure greater than 300 sqm in area and include all ancillary works and services.

Application Timeline

  1. Application received

    14 Aug 2023

  2. Further information requested

    6 Oct 2023

  3. Further information received

    10 Nov 2023

  4. Decision: GRANT PERMISSION

    6 Dec 2023

  5. Decision due

    7 Dec 2023

  6. Grant issued

    19 Jan 2024

Application Details

Location
Luas Broombridge - Hamilton Deport, 7 Broombridge Road, Cabra West, Dublin 7, D07 A978
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
19051 ha

Timeline

Registration Date
14 August 2023
Status
Decision Notice Issued
Decision
GRANT PERMISSION
Decision Date
6 December 2023
Grant Date
19 January 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

13m
WEB1042/24GRANT PERMISSION17 Jan 2024

Planning Permission for Alterations to existing hip roof to side to create a Gable roof to accommodate attic stairs to allow conversion of attic into non habitable storage with Dormer to rear, removal of chimney to side, window to side gable, Roof windows to front, modification to porch roof and proposal for extended vehicle access all with associated ancillary works.

462 Griffith Avenue, Dublin 11, D11 W6RO

97m
3350/23GRANT PERMISSION10 Mar 2023

The development will consist of alterations to existing front garden boundary and pedestrian gateway and creation of new vehicular entrance 3.5m wide with off-street parking space, new gates and all associated site, landscaping works and services.

201, Bannow Road, Cabra, Dublin 7

113m
3107/21GRANT PERMISSION7 Jul 2021

Planning permission for construction of a single storey extension and entrance canopy to the front, new vehicular entrance, gates and dished footpath to the front and all associated site works.

213 Bannow Road, Cabra, Dublin 7

124m
3364/19GRANT RETENTION PERMISSIO27 Jun 2019

RETENTION: application for retention permission for additional window to front elevation to first floor bathroom and widened vehicular access

314, Carnlough Road, Cabra West, Dublin 7

136m
WEB1822/24APPLICATION DECLARED INVA9 Jul 2024

For a temporary 5 year permission for a change of use of part of the building to a proposed micro-brewery and all associated site works and fit out works at 27a Moyle Road, Dublin Industrial Estate, Glasnevin, Dublin 11. The proposed development comprises the temporary change of use of part of the existing building to use as a microbrewery for the production of beer. Proposed internal and external works to facilitate the change of use include: a) The construction of ramps and steps for personal and delivery access; b) The creation of a new ope in the northern elevation for personal access; and c) Internal works and fit out consisting of the removal of internal walls and the installation of brewhouse and fermentation plant, ancillary brewers lab, canteen and brewer's office, and WC facilities, and all associated development and works.

Unit 27a, Moyle Road, Dublin Industrial Estate, Dublin 11

136m
4024/24APPLICATION DECLARED INVA16 Jul 2024

Temporary 5 year permission . The proposed development comprises the temporary change of use of part of the existing building to use as a microbrewery for the production of beer. Proposed internal and external works to facilitate the change of use include the construction of ramps and steps for personal and delivery access; the creation of a new ope in the northern elevation for personal access and internal works and fit out consisting of the removal of internal walls and the installation of brewhouse and fermentation plant, ancillary brewer's lab, canteen and brewer's office and WC facilities and all associated development and works.

Unit 27a, Moyle Road, Dublin Industrial Estate, Glasnevin, Dublin 11

136m
4063/24GRANT PERMISSION24 Jul 2024

PERMISSION : A temporary 5 year permission . The proposed development comprises the temporary change of use of part of the existing building from food production and storage to use as a microbrewery for the production of beer. Proposed internal and external works to facilitate the change of use include the construction of ramps and steps for personal and delivery access; the creation of a new ope in the northern elevation for personal access; and, internal works and fit out consisting of the removal of internal walls and the installation of brewhouse and fermentation plant, ancillary brewers lab, canteen and brewer's office, and WC facilities, and all associated development and works.

27a Moyle Road, Dublin Industrial Estate, Glasnevin, Dublin 11

136m
3434/25APPLICATION DECLARED INVALID21 Oct 2025

RETENTION : Planning permission for retention of A. Single storey domestic shed/playroom B. All associated site works .

296 Carnlough Road, Cabra, Dublin 7

136m
3441/25GRANT RETENTION PERMISSION29 Oct 2025

RETENTION : Planning permission for retention of A. Single storey domestic shed/playroom B. all associated site works .

296 Carnlough Road, Cabra, Dublin 7

136m
5168/26Registered Application8 Jul 2026

Planning permission for A. Two storey extension to side and rear, B. Change of roof profile from hip end to full gable end to accommodate attic conversion with dormer extension to rear, C. 1 no. velux roof light to front elevation, D. All associated site works.

296 Carnlough Road, Dublin 7

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?