← Back to search

Unit B, South Gate, Cork Street, Dublin 8

GRANT PERMISSION

Planning application 4322/19

Dublin - Dublin City Council

Proposed Development

The development will consist of the change of use from existing shop to a yoga/exercise studio with therapy rooms, external signage and all associated site works.

Application Timeline

  1. Application received

    30 Oct 2019

  2. Decision due

    2 Jan 2020

  3. Decision: GRANT PERMISSION

    2 Jan 2020

  4. Grant issued

    11 Feb 2020

Application Details

Location
Unit B, South Gate, Cork Street, Dublin 8
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
134 ha

Timeline

Registration Date
30 October 2019
Status
Decision Notice Issued
Decision
GRANT PERMISSION
Decision Date
2 January 2020
Grant Date
11 February 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

19m
5160/22GRANT PERMISSION2 Nov 2022

The development consists of change of use of existing ground floor retail unit to a restaurant with ancillary takeaway option; outdoor seating and all associated site works.

Unit 3, Southgate, Cork Street, Dublin 8

67m
WEB2208/26APPLICATION DECLARED INVALID19 May 2026

We, Black Sheep Investments Limited, intend to apply for Permission for development at this site: 1-2 Chamber Street, at the junction with Ardee Street and Chamber Street, Dublin 8, D08 H3K5. The development will consists of: (i) Demolition of non-original extension of the existing public house, the Ardee House; (ii) Part-demolition of the existing original fabric of public house structure, with the selective retention of external façades; (iii) Construction of a part six-storey mixed-use development to contain: (a) 14 no. Apartments (4 no. Studios and 10 no. 1-bed units), (b) Community Facility (30 sqm) at ground level, (c) Bike and Bin store at ground level, and (d) Communal Amenity Space (75 sqm) at terrace at Fifth floor; and (iv) All associated site works.

1-2 Chamber Street, at the junction with Ardee Street and Chamber Street, Dublin 8, D08 H3K5

67m
WEB2243/26ADDITIONAL INFORMATION22 May 2026

We, Black Sheep Investments Limited, intend to apply for Permission for development at this site: 1-2 Chamber Street, at the junction with Ardee Street and Chamber Street, Dublin 8, D08 H3K5. The development will consists of: (i) Demolition of non-original extension of the existing public house, the Ardee House; (ii) Part-demolition of the existing original fabric of public house structure, with the selective retention of external façades; (iii) Construction of a part six-storey mixed-use development to contain: (a) 14 no. Apartments (4 no. Studios and 10 no. 1-bed units), (b) Community Facility (30 sqm) at ground level, (c) Bike and Bin store at ground level, and (d) Communal Amenity Space (75 sqm) at terrace at Fifth floor; and (iv) All associated site works.

1-2 Chamber Street, at the junction with Ardee Street and Chamber Street, Dublin 8, D08 H3K5

73m
4065/19APPLICATION DECLARED INVA24 Sept 2019

The proposal relates to the ground floor only, extending to circa 48.9sqm. The proposed development will consist of the temporary use of the existing retail unit for the purposes of a marketing suite in the period up to 31st August 2020. The proposals will comprise the internal reconfiguration of the unit only. There are no external alterations proposed. The unit will revert to retail use following the cessation of the proposed use.

Unit 1, Ardee Court, Dublin 8

73m
4173/19GRANT PERMISSION9 Oct 2019

The proposal relates to the ground floor unit only, extending to circa 48.9sqm. The proposed development will consist of the temporary use of the existing retail unit for the purposes of a marketing suite in the period up to 31st August 2020, commencing on the date of a final grant. The proposals will comprise the internal reconfiguration of the unit only. There are no external alterations proposed. The unit will revert to retail use following the cessation of the proposed use.

Unit 1, Ardee Court, 5, Ardee Street, Dublin 8

73m
2187/20GRANT PERMISSION31 Jan 2020

PROTECTED STRUCTURE: Permission for the refurbishment and change of use of No. 10 Ardee Street, a Protected Structure of 3 storeys over basement; from part dwelling, part office use to office use only (530 sqm); the construction of a part three storey with roof terrace/part three storey with roof terrace/part 4 storey over basement extension with surface water attenuation and PV panels on roof (5 floors in total) to the North and East of No. 10 Ardee Street(at the former No.9 Ardee Street bounding St Luke's Avenue) to provide office accommodation, lift/stairs and 4 No. apartments (737 sqm), (1No. 1 bed, 1No. 2 bed, 2 No.3 bed), with balconies to South and North facades; the upgrade and refurbishment of No. 11 Ardee Street (a 2storey building) for office use (218 sqm); with new roofs and rooflights along with alterations to existing openings; the construction of 2No. 2 storey duplex 1 bed apartments, with rooflights, within the building known as 'The Ramp' to the east of No. 11 Ardee Street (109 sqm); provision of a bin store with roof terrace above, bio-attenuation area, 26 No. Bicycle parking spaces and 2No. car parking spaces in courtyard; retention of existing arched vehicular entrance off Ardee Street along with provision of new pedestrian entrance off St. Luke's Avenue along with all associated landscape, conservation and site development works including new boundary wall and railing to eastern boundary. Detailed works to No. 10, a protected structure, to include: The demolition of three storey extension to North known as "The Annex" and small toilet structure to rear (East); the removal and strip out of other non-original partitions; the reinstatement of windows to rear at ground floor and doors and windows to basement; the strip out and replacement of redundant services; the adjustment of internal opes into extension at No. 9 Ardee Street at ground, first and second floors with a new ope at both ground and first floor; localised repointing to facades; structural strengthening where required.

Nos. 9, 10, 11 Ardee Street, bounding St Luke's Avenue, Dublin 8, D08 KP9P

75m
5457/22GRANT PERMISSION16 Dec 2022

PROTECTED STRUCTURE: The development will consist of the refurbishment and change of use of No.10 Ardee Street (protected structure), a 3 storey over basement building from part dwelling, part office use to office use only; the construction of a part 3-storey with roof terrace and a part 4-storey extension with flat roof to the North and East of No. 10 Ardee Street to provide office accommodation and lift/stairs; the provision of a 1-storey bicycle and bin store with green roof; 12No. bicycle parking spaces and 1 No. car parking space in the courtyard along with provision of a new pedestrian entrance off St. Luke's Avenue along with all associated landscape, conservation and site development works including a new boundary wall to eastern boundary. The proposed works to No.10 Ardee Street (protected structure) include the demolition of 3-storey extension to North known as "The Annex" and 1-storey toilet structure to rear (East); the removal and strip out of other non-original partitions; the reinstatement of windows to rear at ground floor and doors and windows to basement; the adjustment of internal opes into the extension at No.9 Ardee Street at ground, first and second floors with 2no new door openings at ground and first floor level; localised repointing to façades; structural strengthening where required.

Nos. 9, 10, Ardee Street corner St. Luke's Avenue, Dublin 8, D08KP9P

78m
4301/24REFUSE PERMISSION24 Sept 2024

The development consists of: reinstatement of the Dutch Billy Elevation acknowledging its historical past. Reinstatement of past two storey above existing building via, the raising of existing mid-terrace flat roofed two storey over raised basement building to five storey over raised basement building with a new flat roof. The fabric of the existing two storey house which is c. 300 years old and consists of original brick walls with sand and cement render is to be retained and the new external and internal walls above the first floor are to be a mixture of new solid and non-solid construction. The terrace to the west of No 128 consists of early 20 th century red brick two storey houses with pitched slated roofs and uPVC windows and doors, while the housing to the east consists of deck access two storey housing with a concrete tiled pitched roof, developed, owned and managed by Dublin City Council for housing for older people. The existing solid party wall between No 126 and no 128, wholly located within the red line of the applicant site, is to be retained and raised to the fifth floor parapet level of the raised building. The new building will have the following accommodation: At ground floor, an entrance hall accessing a lift and stair core located to the existing rear return of the building, providing vertical circulation for the new raised building with emergency and other ingress and egress to public domain at Robinsons Court, as well as an office unit. At first floor level two short term let residential units served via the new rear lift/stair core. At second floor level a new long term let two bedroom residential unit served by the lift/stair core. At third floor level a similar new long term let one bedroom residential unit served by the lift/stair core. At fourth floor level a new long term let one bedroom residential penthouse unit with south facing terrace private open space served by the lift/stair core. Addition of balconies to rear wall of all long term let residential units. Reinstatement of Basement Level for storage, plant and services use. At roof level there is a zinc parapet and sedum covered flat roof. Windows and doors to be thermally broken aluminium framed units to selected colour with triple glazing. Currently external walls are rendered and painted, new walls to be similarly rendered and painted to selected colours. The walls to the sides and rear including cills are to be wrapped with insulation and rendered to match the existing. All existing cut granite elements including cills, parapet stones and granite entrance steps are to be retained protected and preserved. Existing granite cills to have paint removed and exposed. Cills to new windows to be matching exposed granite. Minor alterations including moving of existing rear door and creation of new plant service only access doors along rear site boundary. The proposed floor areas are as follows: Basement 47.9 sqm, GF 75 sqm, FF 76.3 sqm, SF 77.5 sqm, TF 77.5 sqm, Penthouse 65sqm. The office and residential units have south facing views over Weaver Park across the road from the site. All units enjoy north/south duel aspect. Provision for all associated equipment and services and internal and external refurbishment and site works.

128 Cork Street, The Liberties, Dublin 8, D08K5RH

79m
2962/19GRANT PERMISSION13 May 2019

Planning permission is sought for the demolition of the existing single storey ground floor rear extension and the construction of a two-storey rear extension to the existing terraced dwelling.

41C, Chamber Street, Dublin 8

85m
4430/23GRANT PERMISSION6 Sept 2023

PROTECTED STRUCTURE:PERMISSION:For the replacement of existing non original single glazing, to be replaced with vacuum glass retrofitted within existing non original sashes at ground and lower ground, at front and rear facades of Apt. 1, 4 Ardee Street, Dublin 8, D08PA61. The application pertains to Apartment 1 demise only located at ground and lower ground floors of the 5 storey terraced building, which is also a protected structure.

Apt. 1, 4 Ardee Street, Dublin 8, D08PA61

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?