← Back to search

Northside Shopping Centre, Oscar Traynor Road, Dublin 17

GRANT PERMISSION

Planning application 4516/22

Dublin - Dublin City Council

Proposed Development

The development will consist of: Installation of solar photovoltaic panels and mounting system (c.1,136 sqm) on Dunnes Stores roof, a new louvered screen (or similar) along the store's roof facing Barryscourt Road (South East Elevation), and all other associated site works/services.

Application Timeline

  1. Application received

    21 Jul 2022

  2. Decision due

    14 Sept 2022

  3. Decision: GRANT PERMISSION

    14 Sept 2022

  4. Grant issued

    24 Oct 2022

Application Details

Location
Northside Shopping Centre, Oscar Traynor Road, Dublin 17
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
2610 ha

Timeline

Registration Date
21 July 2022
Status
Decision Notice Issued
Decision
GRANT PERMISSION
Decision Date
14 September 2022
Grant Date
24 October 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

54m
4560/23GRANT PERMISSION28 Sept 2023

The development will consist of the change of use of the existing units H-J from their current use as a retail store to their proposed use as a Daycare Centre. Proposed works will consist of the demolition of existing non-structural internal walls, the erection of new internal partition walls, some of which will be glazed, partial demolition of the south wall of the unit to accommodate 2 no. windows, a new entrance door, located on the north elevation of the unit, all site development and landscaping works are also included.

Unit H-J, Northside Shopping Centre, Oscar Traynor Road, Dublin 17

55m
3048/19GRANT PERMISSION21 May 2019

The development consists of: the removal of the dividing wall to merge existing retail units 19 & 20 to form one single unit to use as a retail shop.

Unit 19 & 20, Northside Shopping Centre, Oscar Traynor Road, Coolock, Dublin 17

56m
4343/23APPLICATION DECLARED INVA22 Aug 2023

PERMISSION:The development will consist of the change of use of the existing units H-J, from their current use as a retail store to their proposed use as a Daycare Centre. Proposed works will consist of; the demolition of existing non-structural internal walls; the erection of new internal partition walls, some of which will be glazed; partial demolition to the south wall of the unit to accommodate 2 no. windows; a new entrance door, located on the north elevation of the unit; all site development and landscaping works are also included.

Unit H-J, Northside Shopping Centre, Oscar Traynor Road, Dublin 17

61m
WEB1938/24GRANT PERMISSION AND RETE31 Jul 2024

Retention Permission and Permission is sought for a. retain front porch single storey extension. b. retain side shed/conservatory/covered passageway single storey extension. c. proposed side 2metre high boundary walling to enclose screen private side garden.

76A Bunratty Road, Coolock, Dublin 17, D17 K248

103m
4689/23GRANT PERMISSION25 Oct 2023

Demolition of the internal party walls between retail units 1, 52, 53 and 54, and the subsequent amalgamation of these units into one retail unit with a gross floor area of 380 sq.m.

Unit 1, 52, 53, 54, Northside Shopping Centre, Oscar Traynor Road, Dublin 17

104m
4723/22APPLICATION DECLARED INVA24 Aug 2022

The development will consist/consists of: new branding/advert signs to the south west, south east and north-west elevations including new signage lighting to match existing; new corporate sign with backlit metal and translucent polyurethane letters to replace obsolete existing signs at the 3 existing pedestrian entances; new freestanding metal glazed canopy (approximately 15.70 sqm.) at the Oscar Traynor Road entrance including concealed surface water drainage to be connected to existing system; new freestanding metal glazed canopy (approximately 18.82 sqm) at the Barryscourt road entrance including concealed surface water drainage to be connected to existing system; partial re-paint of the two existing signage totems with colour scheme matching the existing; removal of the vertical lettering on the east corner of the building.

Northside Shopping Centre, Oscar Traynor Road, Dublin 17

105m
4786/22GRANT PERMISSION6 Sept 2022

The development will consist/consists of new branding/advert signs to the south west, south east and north-west elevations including new signage lighting to match existing; new corporate signs with backlit metal and translucent polyurethane letters to replace obsolete existing signs at the 3 existing pedestrian entrances; new freestanding metal glazed canopy (approximately 15.70 sqm) at the Oscar Traynor Road entrance including concealed surface water drainage to be connected to existing system; new freestanding metal glazed canopy (approximately 18.82 sqm) at the Barryscourt Road entrance including concealed surface water drainage to be connected to existing system, partial re-paint of the two existing signage totems with colour scheme matching the existing; removal of the vertical lettering on the east corner of the building.

Northside Shopping Centre, Oscar Traynor Road, Dublin 17

110m
3738/24GRANT PERMISSION23 May 2024

The development will consist of the amalgamation of the existing trolley bay into the existing pharmacy; the decrease in floor area of the pharmacy from 191m2 to 168m2; the increase in the floor space of the surgery from 109m2 to 157m2; internal alterations to the pharmacy and surgery; the relocation of the entrance door to the pharmacy; new signage located adjacent to, and above the new entrance door; all site development and landscaping works are also included.

Unit 7 & 8, at Northside Shopping Centre, Oscar Traynor Rd, Dublin 17, Ireland

113m
3923/21APPLICATION DECLARED INVA24 Nov 2021

The development will consist of the construction of a part single storey extension, containing an assisted user WC, and a part three storey passenger lift extension, adjoining and located to the rear of the existing three storey school building and the provision of a new ramp and steps approach, together with all associated siteworks.

Colaiste Dhulaigh College of Further Education, Barryscourt Road, Coolock, Dublin 17

113m
4026/21GRANT PERMISSION7 Dec 2021

The development will consist of the construction of a part single storey extension, containing an assisted user WC, and a part three storey passenger lift extension, adjoining and located to the rear of the existing three storey school building and the provision of a new ramp and steps approach, together with all associated site works.

Colaiste Dhulaigh College of Further Education, Barryscourt Road, Coolock, Dublin 17

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?