23-27, College Green, Dublin 2
REFUSE PERMISSIONPlanning application 4627/22
Dublin - Dublin City Council
Proposed Development
PROTECTED STRUCTURE: Development will consist of 2no. semi-transparent illuminated digital displays mounted internally behind the 2no. ground floor windows on the St. Andrews Street elevation of size measuring 1890mm wide x 2030mm high, 437mm above floor level. The development is located within a protected structure.
Application Timeline
Application received
5 Aug 2022
Decision due
29 Sept 2022
Decision: REFUSE PERMISSION
29 Sept 2022
Application Details
- Location
- 23-27, College Green, Dublin 2
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 937 ha
Timeline
- Registration Date
- 5 August 2022
- Status
- Decision Notice Issued
- Decision
- REFUSE PERMISSION
- Decision Date
- 29 September 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
PROTECTED STRUCTURE: The development will consist of 2 no. semi-transparent illuminated digital displays mounted internally behind the 2no. ground floor windows on the St. Andrews Street elevation of size measuring 1890mm wide x 2030mm high, 437mm above floor level. The development is located within a protected structure.
23-27, College Green, Dublin 2
PROTECTED STRUCTURE: PERMISSION: RPS No. 7569. The development will consist of the change of use of the basement, a portion of the ground floor and the 1st - 3rd floor of the existing building from office (and small area of retail at ground floor) to hotel use, the construction of a one storey extension at roof level and a six storey extension to the rear to accommodate hotel bedrooms together with a four storey (over existing) extension to the rear to accommodate a new fire escape and lift core. The proposal includes roof plant and green (blue) roofs at 1st floor level and topmost roof level. The proposed development will result in a 111 no. bedroom hotel (the existing Post Office at ground floor level is retained by the development). The development will also consist of internal and external alterations, including, the removal of non- original office partitions to 1st, 2nd and 3rd floor, alterations to back of house Post Office area at ground floor, removal of the external fire escape stairs, removal of all partitions at basement level, removal of external walls and windows to rear of 3rd floor level, removal of the concrete flat roof and structural beams at 3rd floor level, reconfiguration of the ground floor entrance lobby, provision of a fire escape corridor within and to the side of the post office retail unit, replacement of ground floor window with double door, refurbishment of bronze and steel windows to front and rear, removal/relocation of 3 no. steel windows and reconfiguration of a further 2 no. steel windows all to the rear, removal of all protective steel grates from rear windows, redecoration and repair works to existing render facade to rear and removal of rooflights from 1st floor flat roof and all other associated works.
19-24 St. Andrew's Street, Dublin 2, D02 C966
PROTECTED STRUCTURE: Appalachian Property Holdings Limited intends to apply for permission for development to amend a previously permitted hotel development (DCC Reg. Ref. 4845/23 &ABP Ref. 319111-24) at Nos. 19-24 St. Andrew’s Street, Dublin 2, D02 C966 (a Protected Structure – RPS No. 7569). The development will consist of the widening of the existing doorway and the widening of the permitted escape doorway onto St. Andrew’s Street.
19-24, St. Andrew's Street, Dublin 2
PROTECTED STRUCURE: Appalachian Property Holdings Limited intends to apply for permission for development to amend a previously permitted hotel development (DCC Reg. Ref. 4845/23 &ABP Ref. 319111-24) at Nos. 19-24 St. Andrew’s Street, Dublin 2, D02 C966 (a Protected Structure – RPS No. 7569). The development will consist of the widening of the existing doorway and the widening of the permitted escape doorway onto St. Andrew’s Street.
19-24, St. Andrew's Street, Dublin 2
PROTECTED STRUCTURE: RETENTION: The development consists of retention of the following: (A) Internal partition walls, positioned beneath and not in contact with the existing ceiling. The partition walls will form internal secured corridors to the approved ATM and approved new access to St. Andrew's Street and are capped with fire-resistance ceilings below and not in contact with the existing ceiling. The approved ATM area is reconfigured. (B) Removal of an internal wall separating two small stores to rear of building, creating one room and the blocking of one doorway to previously used store. (C) Two opes on an internal wall.
An Post, 19-24, St. Andrew's Street, Dublin, D02 C966
PROTECTED STRUCTURE: PERMISSION & RETENTION: Permission for development at this site, An Post, 19-24 St. Andrew's Street, Dublin 2, D02 C966, a Protected Structure. The development for permission will consist of internal modification works in the Post Office. The development for retention consists of internal modification works carried out in the Post Office.
An Post, 19-24, St. Andrew's Street, Dublin, D02 C966
PROTECTED STRUCTURE: Permission for development at a c. 0.124 ha site at Ulster Bank, 30-33 College Green and 3-4 Suffolk Street fronting onto Church Lane, Dublin 2, D02 DD76 (A Protected Structure, RPS Ref. 1995). The proposed development will consist of the internal refurbishment and fitout of the existing building across 5 no. floors including the retail bank and atrium space at ground floor level. The proposed fitout includes the removal of internal partition walls and the provision of new reconfigured partition walls at ground through fourth floor levels, changing the public access to the existing College Green entrance only, a new underfloor heating system under the atrium floor and the provision of new ventilation, data cabling, power distribution and accessible toilets. The proposed scheme includes the replacement of existing plant and services at roof level with new plant on both the College Green and Suffolk Street roofs, removal of a ventilation duct to the rear of the College Green building, replacement of existing louvres at 5th floor level with new louvres to match existing, the provision of a new extract duct to the rear of the Suffolk Street roof and the replacement of an existing rooflight over the stairwell to the south of the building with a double glazed rooflight to match existing. The existing single-glazed atrium roof will be replaced with a new double-glazed, single pitched atrium roof with ventilation and smoke vents, and a total height lower than existing. Works at second floor roof level to the rear of the College Green building comprise the removal of all existing plant, the replacement of an existing rooflight with a lightweight roof and the provision of 5 no. new condenser units.
Ulster Bank, 30-33 College Green and 3-4 Suffolk Street fronting onto Church Lane, Dublin 2, D02 DD76
PROTECTED STRUCTURE: PERMISSION: To carry out external works for the removal of ATM's on College Green and Suffolk Street infilled with stone to match the existing as well as the removal of the Ulster Bank raised letter blue shopfront signage, bus stop signage and general blue signage on College Green, Church Lane and Suffolk Street elevations. Carry out internal works for the removal of the ATM's, loose furniture, general signage and the removal of Ulster Bank digital signage on Suffolk Street.
33, College Green, Dublin 2
PROTECTED STRUCTURE: Planning permission to carry out external works on a protected structure for the removal of ATM's on College Green and Suffolk Street infilled with stone to match the existing. The removal of the night safe front plate, replacing with a blank steel plate, as well as the removal of the Ulster Bank raised letter blue shopfront signage, bus stop signage and general blue signage on College Green, Church Lane and Suffolk Street elevations. Carry out internal works for the removal of the ATM's, loose furniture, general signage and the removal of Ulster Bank digital signage on Suffolk Street.
33, College Green, Dublin 2, Co. Dublin, D02 DD76
PROTECTED STRUCTURE: PERMISSION: To carry out external works on a protected structure for the removal of ATM's on College Green and Suffolk Street infilled with stone to match the existing. The removal of the night safe front plate on college green, to be infilled with stone to match existing. The removal of the Ulster Bank raised letter blue shopfront signage, bus stop signage and general blue signage on College Green, Church Lane and Suffolk Street elevations. Carry out internal works for the removal of the ATM's, loose furniture, general signage and the removal of Ulster Bank digital signage on Suffolk Street. At 33 College Green, Dublin 2, Co. Dublin, D02 DD76, Ireland.
33, College Green, Dublin 2, D02 DD76
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?