← Back to search

The Fuelyards, 13A, Church Street, Finglas, Dublin 11

APPLICATION DECLARED INVA

Planning application 5233/22

Dublin - Dublin City Council

Proposed Development

The development will consist of: -Demolition of the apartment and ground floor commercial unit in the 2 storey portion of the existing building at the church street end. -Demolition of the stand-alone single storey building on the south west boundary by church street. -Construction of 22 no. Apartments, comprised of 12. No. 2 beds, 9 no. 1 beds and 1 studio apartment, in: A) a new six-storey over ground floor extension to the existing building at the northwest end and B) a new fifth floor above the existing fourth floor apartments. Construction of a new landscaped forecourt with water feature and reconfiguration of the existing basement carparking, bicycle storage and bin storage arrangement. -Change of use of the existing ground floor storage and workshop units to office use along with modifications to the ground floor elevation onto the Finglas Road. -All ancillary site works and services.

Application Timeline

  1. Application received

    15 Nov 2022

  2. Decision: APPLICATION DECLARED INVA

    25 Nov 2022

  3. Decision due

    18 Jan 2023

Application Details

Location
The Fuelyards, 13A, Church Street, Finglas, Dublin 11
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
1103 ha

Timeline

Registration Date
15 November 2022
Status
Decision Notice Issued
Decision
APPLICATION DECLARED INVA
Decision Date
25 November 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
3004/23REFUSE PERMISSION5 Jan 2023

Permission for development will consists of the provision of 22 new apartments comprised of 12 no. 2 beds, 9 no. 1 beds and 1 studio apartment throughthe demolition of the apartment and ground floor commercial unit in the 2 storey portion of the existing building at the Church Street end. Works to the fourth floor involving the reconfiguration of the 3 existing apartments into 4 apartments (providing 1 new apartment), construction of a new fifth floor over the existing building containing 3 new apartments. Construction of a new six-storey over ground floor extension to the existing building at the northwest end containing 18 new apartments. Along with the construction of a new landscaped forecourt with water feature and reconfiguration of the existing basement carparking, bicycle storage and bin storage arrangements. The change of use of the existing ground floor storage and workshop units to office use along with modifications to the ground floor elevation onto the Finglas Road. The demolition of the stand-alone single storey building on the south west boundary by Church Street and all ancillary site works and services.

The Fuelyards, 13a Church Street, Finglas, Dublin 11

0m
WEB5615/25APPLICATION DECLARED INVALID6 Nov 2025

Change of use of the existing storage unit, workshop unit and commercial unit into 2 x 1-Bedroom Apartments and 2 x Studio Apartments with alterations to the existing façade on the ground floor of The Fuel Yard, Church Road. Finglas, Dublin 11

The Fuel Yard, Church Street, Finglas, Dublin 11, D11 YR58

0m
WEB5633/25APPLICATION DECLARED INVALID10 Nov 2025

Change of use of the existing storage unit, workshop unit and commercial unit into 2 x 1-Bedroom Apartments and 2 x Studio Apartments with alterations to the existing façade on the ground floor of The Fuel Yard, Church Road. Finglas, Dublin 11

The Fuel Yard, Church Street, Finglas, Dublin 11, D11 YR58

0m
WEB5818/25GRANT PERMISSION28 Nov 2025

Change of use of the existing storage unit, workshop unit and commercial unit into 2 x 1-Bedroom Apartments and 2 x Studio apartments with alterations to the existing façade on the ground floor of The Fuel Yard, Church Street, Finglas, Dublin 11

The Fuel Yard, Church Street, Finglas, Dublin 11, D11 YR58

69m
3222/21REFUSE PERMISSION27 Jul 2021

Permission for change of use of former launderette 79.sq,m (retail use) to takeaway use and for the erection of a single storey extension 3.3 sq.m to the rear and external signage and all associated site and development works.

6, The Green, Church Street, Finglas, Dublin 11

79m
2038/20APPLICATION WITHDRAWN13 Jan 2020

The development will consist of change of use from office space to 2 no. one bedroom apartments above Saint Vincent de Paul Retail Unit. Works to include internal alterations, refurbishment and attic to be converted to habitable bedroom and bathroom. Externally, existing first floor windows and front door to apartments are to be replaced. One new dormer window and one rooflight is to be added to existing roof to the rear of the property, all with associated ancillary works.

"Vincents", 3, Main Street, Finglas, Dublin 11

116m
WEB1276/25GRANT PERMISSION13 Feb 2025

Change of use of the ground floor from commercial unit to gaming/amusement arcade with ancillary site works .

44 Main Street, Finglas, Dublin 11, D11 TCC9

126m
WEB1052/25GRANT PERMISSION AND RETENTION PERMISSION13 Jan 2025

PERMISSION & RETENTION is sought for partial 1st floor extension and winter garden over existing ground floor units, to create 1 x Two Bedroomed apartment unit at 1st floor level, Retention of change of use at units 2a & 3 to retail area, with associated signage area, internal modifications and associated site works

No. 2, 2A & 3 Ballygall Road West, Finglas, Dublin 11, D11 X96F

127m
5274/22APPLICATION DECLARED INVA23 Nov 2022

Change of use of the existing upper first floor level from hospitality function room space (568sqm) to associated bedroom accommodation at The Village Inn for the provision of a total of 19 bedrooms (3 twin double beds, 2 twin single beds, 5 triple beds, 3 double beds, and 6 single bedrooms) including 19 bathrooms to be included in the renovations. There are associated changes to the external elevations together with other associated works also proposed.

The Village Inn, 33 Church Street, Finglas South, Dublin, D11 E129

130m
3039/23REFUSE PERMISSION13 Jan 2023

Permission for change of use of the existing upper first floor level from hospitality function room space (568sqm) to associated guesthouse bedroom accommodation at The Village Inn for the provision of a total of 19 bedrooms (3 twin double beds, 2 twin single beds, 5 triple beds, 3 double beds, and 6 single bedrooms) including 19 bathrooms to be included in the renovations. There are associated changes to the external elevations together with associated works also proposed.

The Village Inn, 33 Church Street, Dublin 11, D11 E62V

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?