← Back to search

39, Annamoe Terrace, Dublin 7, D07 N7V2

GRANT PERMISSION AND RETE

Planning application WEB1132/19

Dublin - Dublin City Council

Proposed Development

RETENTION: Permission is sought for retention of development which consists of a vehicular entrance to front of existing end of terrace dwelling.

Application Timeline

  1. Application received

    11 Mar 2019

  2. Decision due

    3 May 2019

  3. Decision: GRANT PERMISSION AND RETE

    3 May 2019

  4. Grant issued

    13 Jun 2019

Application Details

Location
39, Annamoe Terrace, Dublin 7, D07 N7V2
Applicant
N/A
Application Type
Retention Permission
Planning Authority
Dublin City Council
Site Area
194.88 ha

Timeline

Registration Date
11 March 2019
Status
Decision Notice Issued
Decision
GRANT PERMISSION AND RETE
Decision Date
3 May 2019
Grant Date
13 June 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

34m
WEB1260/19GRANT PERMISSION7 May 2019

The demolition of the existing single storey rear extension of 14 sq.m and the construction in its place of a new one / two storey extension of 40 sq.m including all associated site and landscaping works.

30, Annamoe Terrace, Cabra, Dublin 7

49m
2887/20GRANT PERMISSION19 Jun 2020

Permission for development at 79 Annamoe Terrace, Cabra, Dublin 7 consisting of building a single storey bay window extension at the front of the house, an additional bedroom over the existing single storey kitchen extension at the rear and all associated internal, site and drainage works.

79, Annamoe Terrace, Cabra, Dublin 7

54m
3386/25GRANT RETENTION PERMISSION16 Sept 2025

RETENION PERMISSION:The develeopment consists of: Single storey extension, garage and garden room to side and rear of existing two storey semi-detached dwelling house, attic conversion to store and alterations to front & side elevations.

77 Annamoe Road, Cabra, Dublin 7,D07WV67

60m
2872/19GRANT RETENTION PERMISSIO30 Apr 2019

RETENTION & PERMISSION: The development consists of the retention of vehicular entrance to facilitate off-street parking and permission for dishing of the kerb and all associated site works.

10, Annamoe Terrace, Cabra, Dublin 7

87m
3715/19APPLICATION DECLARED INVA9 Aug 2019

Planning permission sought for part demolition of existing single storey extension to side, construction of a single storey extension to the rear, re-roofing and extending existing garden shed with extended canopy all to rear and widening existing driveway.

69, Annamoe Road, Dublin 7, D07 EY06

87m
3868/19GRANT PERMISSION27 Aug 2019

Planning permission sought for part demolition of existing single storey extension to side, construction of a single storey extension to the rear, re-roofing and extending existing garden shed with extended canopy all to rear and widening of existing vehicular access.

69, Annamoe Road, Dublin 7, D07 EY06

100m
3993/23APPLICATION DECLARED INVA21 Jun 2023

Permission for the development of a new vehicular front access entrance.

10 Annamoe Drive, Cabra, Dublin 7, D07 A314

105m
WEB1876/24APPLICATION DECLARED INVA17 Jul 2024

Construction of two-storey extension with dormer to the rear of the existing dwelling.

96 Cabra Road, Cabra East, Dublin 7, D07 HF22

105m
WEB1905/24APPLICATION DECLARED INVA24 Jul 2024

The development will consist of: 1) Partial demolition of existing property to the rear including roof to rear and single-storey extension, 2) Construction of new two-storey extension to rear with dormer window facilitating attic conversion and pyramid skylight to new living area, office and en-suite, 3) All associate site works and drainage connections.

96 Cabra Road, Cabra East, Dublin 7, D07HF22

105m
WEB1917/24SPLIT DECISION(PERMISSION26 Jul 2024

The development will consist of: 1) Partial demolition of existing property to the rear including roof to rear and single-storey extension, 2) Construction of new two-storey extension to rear with dormer window facilitating attic conversion and pyramid skylight to new living area, office and en-suite, 3) All associate site works and drainage connections.

96, Cabra Road, Dublin 7, D07 HF22

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?