73, Brunswick Street North, Dublin 7
REFUSE PERMISSIONPlanning application WEB1231/19
Dublin - Dublin City Council
Proposed Development
The Development will consist of alterations to previously permitted works (Pl. Ref: - WEB 1253/17) with additional set back third floor with terrace to Brunswick Street North, alterations to ground floor front elevation and all associated site, drainage and landscaping works.
Application Timeline
Application received
25 Apr 2019
Decision due
19 Jun 2019
Decision: REFUSE PERMISSION
19 Jun 2019
Application Details
- Location
- 73, Brunswick Street North, Dublin 7
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 59.92 ha
Timeline
- Registration Date
- 25 April 2019
- Status
- Decision Notice Issued
- Decision
- REFUSE PERMISSION
- Decision Date
- 19 June 2019
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
PROTECTED STRUCTURE: PERMISSION: For 3-storey extension to east as follows: a) ground level-alterations to vehicular access, revised parking layout and new stairs, lift and storage area; b) first floor-safebase classroom, multisensory room, office and activity room and associated facilities; c) second floor/roof area-secured external play areas (hard and soft) and sensory garden. Works include bicycle racks and all associated site works and services.
St. Paul's CBS Secondary School, Brunswick Street North, Dublin 7
PROTECTED STRUCTURE We, the Board of Management, St Paul's CBS Secondary School intend to apply for permission for alterations to previously approved reg. ref. 3237/23 from 3-storey to a 4-storey extension to east as follows:(a) Ground Level- minor alteration to extension entrance, bicycle racks location altered; (b) First Floor- Safe Base Classroom altered as Central Activity Space with Daily Living Skills Area, re arrangement of Multi Sensory Room and welfare facilities/storage; (c) New Second Floor-2 No. Safe Base Classrooms (inc. Quiet Spaces) and associated facilities; (d) New Raised Roof Area with secure external play areas (hard and soft), sensory garden, PV Panels area and plant room,(e) Vertical extension of existing western stairwell, alteration to elevations and all associated site works and services at St. Paul's CBS Secondary School, Brunswick Street North, Dublin 7, a Protected Structure (ref 997).
St Paul's CBS Secondary School, Edmund Rice Schools, North Brunswick Street, Dublin 7
PROTECTED STRUCTURE: For development at this site: 77-80 King Street North, Smithfield, Dublin 7, D07 TP22. The subject site encompasses an area of 0.0896 hectares. The development will consist of: The demolition of the existing modern extensions to no. 77, the total demolition of no. 78 and 79 North King Street and the retention and alteration of the protected structures at no. 77 and 80 King Street North to facilitate the construction of a 8.9m - 28m (above ground level) part-3 to part-9 storey 5,818 sq.m. hotel building comprising: (i) linen stores, a luggage store, toilets, and comms room at basement level; (ii) a lobby, reception area, bar/restaurant facilities (including the retention of the existing Cobblestone Public House), toilets, a bar store, housekeeping store, food preparation area, a bin store and switch room at ground floor level; (iii) kitchen, and cold storage area, ancillary offices, staff facilities including locker area, a break area and toilet and shower facilities, at first floor level; (iv) 114-bedrooms arranged over floors 2-9 with maintenance and a cleaners storage areas located at third and fourth floor level; (v) plant room located at fifth floor level; and (vi) lift overrun, plant room and green roofs at roof level. The development also includes the following works to no. 77 and 80 King Street North: No. 77 King Street North - New independent structure to be installed to rear and side of existing original house, existing staircase from ground to second floor to be removed, new opening to be formed in west elevation (former party wall), existing (non-original) openings in west elevation at first and second floor level to be blocked up and hotel bedrooms with En Suite bathrooms to be installed at first and second floor level in the Protected Structure. No 80 King Street North - Existing brick facades (main house and rear outbuilding) to be repaired and restored, stone parapet capping to front and rear of main house to be repaired and restored and new historically accurate timber sliding sash windows with slimline double-glazing to be installed to original window openings front and rear of main house. The development also includes SuDS drainage, piped and other services, and all ancillary site development works necessary to facilitate the development. The development to be applied for includes a number of buildings on the Dublin City Council Record of Protected Structures including the following: the Cobblestone Pub, no. 77 King Street North, Dublin 7 (ref: 4263) and no. 80 King Street North, Dublin 7 (ref: 4264).
77-80, King Street North, Smithfield, Dublin 7. D07 TP22
Installation of 6kWp (28 sqm) of photo-voltaic panels on the roof an existing building at St. Paul's CBS Secondary School at this site Brunswick Street North, Dublin 7.
Saint Paul's Cbs Secondary School, Brunswick Street North, Dublin 7, D07 VF57
The proposed development will be two no. Short Term Lease Apartments comprising one no. three bedroom apartment and one no. four bedroom apartment all to a total storey height of five storeys over basement on an urban infill site within an existing terrace. The works will include the reinstatement of an existing light well and reinstatement of cast iron railings to front. A top floor terrace with privacy screen is proposed to the front North King Street facade, and the rear lands will accommodate an external stairwell and ancillary access terraces.
86, North King Street, Dublin 7
PROTECTED STRUCTURE : The development will consist of: At Roof Level: Repair works to roof including rebuilding the roof, valleys, and parapets, reusing original timbers where appropriate, including the use of new Blue Bangor slates, rebuilding the access dormer in central valley, rebuilding of chimneys and rebedding of pots, and cast-iron rainwater goods. At Ground Floor level; Provision of new suspended timber floor at ground floor level; reinstatement of the stairs between basement and ground floor levels; reopening of an existing external door in link to Cook House. To Cook House to rear: Removal of an outside toilet and reopening of original arch in rear wall to access new bin store; Provision of new insulated concrete floor at rear Cook House; Replacement of collapsed roof on rear Cook House building with new roof including new roof lights; Form new opening in party fence wall with no. 84 King Street North, with new access door to enable refuse collection. At Basement level: Provision of new insulated concrete floor at basement level; The reopening of front and rear lightwells; New windows at basement level front and rear; Generally: Works to the party wall with 84 King Street North to eliminate damp issues caused by the roof; All associated works and services necessary to facilitate the development; Repairs to ''Connell's'' sign on front facade: Repairs to the structure on removal of the temporary works: Removal of the paint finish on the ground floor brickwork and door surround, repairs to same and repointing of front and rear brickwork.
85, King Street North, Dublin 7, D07 RK6A
PROTECTED STRUCTURE : The development will consist of: At Roof Level: Repair works to roof including rebuilding the roof, valleys, and parapets, reusing original timbers where appropriate, including the use of new Blue Bangor slates, rebuilding the access dormer in central valley, rebuilding of chimneys and rebedding of pots, and cast-iron rainwater goods. At Ground Floor level; Provision of new suspended timber floor at ground floor level; reinstatement of the stairs between basement and ground floor levels; reopening of an existing external door in link to Cook House. To Cook House to rear: Removal of an outside toilet and reopening of original arch in rear wall to access new bin store; Provision of new insulated concrete floor at rear Cook House; Replacement of collapsed roof on rear Cook House building with new roof including new roof lights; Form new opening in party fence wall with no. 84 King Street North, with new access door to enable refuse collection. At Basement level: Provision of new insulated concrete floor at basement level; The reopening of front and rear lightwells; New windows at basement level front and rear; Generally: Works to the party wall with 84 King Street North to eliminate damp issues caused by the roof; All associated works and services necessary to facilitate the development; Repairs to ''Connell's'' sign on front facade: Repairs to the structure on removal of the temporary works: Removal of the paint finish on the ground floor brickwork and door surround, repairs to same and repointing of front and rear brickwork.
85, King Street North, Dublin 7, D07 RK6A
The development will consist of : (i) construction of a five-storey over basement level residential development comprising 2 no. residential units (1 no. three-bed unit at basement, ground and first floor levels (unit no. 1) and 1 no. four-bed unit at second, third and fourth floor levels (unit no. 2) with a set-back at fourth floor level. Each unit will be served with private open space to unit no. 1 provided with terraces to the front and rear elevation at basement and first floor levels and unit no. 2 provided with terraces to the front and rear elevations at second and fourth floor levels and to the front and at third-floor level. The building will be accessed off North King Street with an external stairwell also provided to the rear. The proposed development also includes: (ii) an external bin store and 8 no. bicycle parking spaces which will be provide to the rear at ground floor level and will be accessible from both of the proposed residential units; (iii) the reinstatement of an existing light well and cast iron railings to the front of the site; (iv) all associated works including boundary treatments, landscaping , infrastructure and drainage necessary to facilitate the development.
Site of No. 86 North King Street, Dublin 7
The development will consist of: (i) construction of a five-storey, over-basement level residential development comprising 2 no. residential units (1 no. three-bed unit at basement, ground and first floor levels (Unit No. 1) and 1 no. four-bed unit at second, third and fourth floor levels (Unit No. 2)) with a set-back at fourth floor level. Each unit will be served with private open space with Unit No. 1 provided with terraces to the front and rear elevation at basement and first floor levels and Unit No. 2 provided with terraces to the front and rear elevations at second and fourth floor levels and to the front at the third-floor level. The building will be accessed off North King Street with an external stairwell also provided to the rear. The proposed development also includes; (ii) an external bin store and 8 no. bicycle parking spaces which will be provided to the rear at ground floor level and will be accessible from both of the proposed residential units; (iii) the reinstatement of an existing light well and cast iron railings to the front of the site; and (iv) all associated works, including boundary treatments, landscaping, infrastructure and drainage necessary to facilitate the development.
Site of No. 86 North King Street, Dublin 7
The development will consist of the erection of telecommunications antenna and ancillary equipment and cabinet at roof level.
Ardcairn House Student Accommodation, Grangegorman Lower, Arran Quay, Dublin 7, D07 W5F3
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?