5, Colbert's Fort, James's Walk, Dublin 8
GRANT RETENTION PERMISSIOPlanning application WEB1521/20
Dublin - Dublin City Council
Proposed Development
RETENTION: The Retention Permission to retain the two storey flat roof extension to the rear and the flat roof dormer window in rear elevation roof plane.
Application Timeline
Application received
5 Aug 2020
Decision: GRANT RETENTION PERMISSIO
14 Sept 2020
Decision due
29 Sept 2020
Grant issued
28 Oct 2020
Application Details
- Location
- 5, Colbert's Fort, James's Walk, Dublin 8
- Applicant
- N/A
- Application Type
- Retention Permission
- Planning Authority
- Dublin City Council
- Site Area
- 74.83 ha
Timeline
- Registration Date
- 5 August 2020
- Status
- Decision Notice Issued
- Decision
- GRANT RETENTION PERMISSIO
- Decision Date
- 14 September 2020
- Grant Date
- 28 October 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The development will consist of: i) the amalgamation of the ground floor retail units to provide for a single retail unit (c.575 sq.m GFA) including an ancillary alcohol sales area (c.32 sq.m) ; (ii) minor external alterations to the elevations to include automatic sliding entrance door, signage, vinyl window coverings and louvered screens to the internal plant room on the Reuben Street (front) elevation; signage to the James's Walk (side) elevation; and louvered screens to the internal plant room on the Herberton Street (side) elevation; and (iii) all ancillary site services and site development works. The development will also consist of the provision of a loading bay on James's Walk.
The ground floor retail units, Block B, Reuben Street, Herberton Street and James's Walk Rialto, Dublin 8
The development will consist of: i) the amalgamation of the ground floor retail units to provide for a single retail unit (c.575 sq.m GFA) including an ancillary alcohol sales area (c.32 sq.m) ; (ii) minor external alterations to the elevations to include automatic sliding entrance door, signage, vinyl window coverings and louvered screens to the internal plant room on the Reuben Street (front) elevation; signage to the James's Walk (side) elevation; and louvered screens to the internal plant room on the Herberton Street (side) elevation; and (iii) all ancillary site services and site development works. The development will also consist of the provision of a loading bay on James's Walk.
The ground floor retail units, Block B, Reuben Street, Herberton Street and James's Walk Rialto, Dublin 8
RETENTION: The development consists of the retention for a temporary period of 5 years of a liquid oxygen compound previously part approved (for a temporary period under Reg. Ref. 3040/16) comprising of: a VIE (vacuum insulated evaporator) liquid oxygen primary tank (40,000 litres) of 8.15m in height; 2 no. back-up VIE liquid oxygen tanks (3,000 litres and 10, 500 litres) of 4.38m and 4.9m in height respectively; vapourisers (5.7m in height), concrete plinth, hardstanding area, concrete ramp, aluminium palisade fencing and security fencing (reconfigured from that previously approved); and all other site development works above and below ground required to facilitate the entire development.
St. James's Hospital, James's Street, Dublin 8
RETENTION: The development consists of the retention of the use of the approved retail unit as a display sample room for New Children's Hospital equipment for a period of five years.
Unit 1, Ground Floor, Block A, Herberton, James's Walk, Rialto, Dublin 8
Renewal of the previously approved temporary permission for the use of the approved retail unit as a display sample room for New Children’s Hospital equipment (under Reference 2200/19) for a further period of five years.
Unit 1, Ground Floor, Block A, Herberton, James’s Walk, Rialto, Dublin 8
The development consists of the renewal of the previously approved temporary permission for the use of the approved retail unit as a display sample room for New Children’s Hospital equipment (under Reference 2200/19) for a further period of five years.
Unit 1, Ground Floor, Block A, Herberton, James's Walk, Rialto, Dublin 8
The proposed development will consist of the installation of rooftop ballast mounted telecommunications equipment including no. 6 antennae, no. 2 dishes, remote radio units (RRU’s), GPS, cable trays, access ladder and all associated site development works to provide for high-speed wireless data and broadband services.
Block A, Herberton Apartments, James's Walk, Rialto, Dublin 8
The proposed development will consist of the installation of rooftop ballast mounted telecommunications equipment including no. 6 antennae, no. 2 dishes, remote radio units (RRU's), GPS, cable trays, access ladder and all associated site development works to provide for high-speed wireless data and broadband services
Block A, Herberton Apartments, James's Walk, Rialto, Dublin 8
Planning permission is sought for new single storey extension to rear of existing house to extend kitchen facility, permission also sought for 2 storey extension to rear of house over kitchen for new bedroom and bathroom and all associated site works.
84, Lourdes Road, Dublin 8
Permission for development at Units 4 and 7 and the retail anchor unit, ground floor, Block A, Herberton, James's Walk, Rialto, Dublin 8. The development consists of the renewal of the previously approved temporary permission for the use of the approved retail units as offices (under Reference 2838/16) together with an adjoining storage room and loading bay for a further period of five years and associated works comprising the replacement of 6 no. existing doors with 6 no. fixed glazed screens on the Reuben Plaza, St. Anthony's Road, James's Walk and Reuben Plaza frontages.
Units 4 & 7 and the Retail Anchor Unit, Ground Floor, Block A, Herberton, James's Walk, Rialto, Dublin 8
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?