Proposed Development
2-storey extension to side and a single storey extension to rear, internal modifications and all related works
Application Timeline
Application received
8 Oct 2019
Decision: GRANT PERMISSION
27 Nov 2019
Grant issued
27 Nov 2019
Decision due
2 Dec 2019
Application Details
- Location
- 53, Bargy Road, Dublin 3
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 350.46 ha
Timeline
- Registration Date
- 8 October 2019
- Status
- Decision Notice Issued
- Decision
- GRANT PERMISSION
- Decision Date
- 27 November 2019
- Grant Date
- 27 November 2019
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The development will consist of the construction of a two storey extension to the rear with velux roof lights, internal refurbishment to existing dwelling, single storey porch extension to the front and all associated site works.
54, Bargy Road, East Wall, Dublin 3
Development will consist of modifications to the ground floor layout and shop façade and will include for: a) Single-storey extension to front of the existing store to provide a DRS facility to allow customers to return plastic beverage bottles to a reverse vending machine in store. b) The removal of the existing entrance/exit pod. c) The removal of the existing trolley bay. d) Proposed free-standing trolley bay. e) Proposed alteration works to store elevation. f) Alteration works to car park area. g) All ancillary works required to complete to the required Building Regulations standards.
Lidl Store, East Wall Road, Dublin 3, D03 V9X3
Permission for development will consist of modifications to the ground floor layout and shop façade and will include for: a) Single-storey extension to front of the existing store to provide a DRS facility to allow customers to return plastic beverage bottles to a reverse vending machine in store. b) The removal of the existing entrance/exit pod. c) The removal of the existing trolley bay. d) Proposed free-standing trolley bay. e) Proposed alteration works to store elevation. f) Alteration works to car park area. g) All ancillary works required to complete to the required Building Regulations standards.
Lidl Store, East Wall Road, Dublin 3, D03 V9X3
Planning permission to erect 482.00m2 or 99.90 kWp of photovoltaic panels on the roof of our existing Lidl Store at East Wall with all associates site works at Lidl Ireland GMBH.
Lidl Store, East Wall Road, Dublin 3, D03 V9X3
RETENTION: The development proposed for retention consists of the removal of rear shed and construction of new domestic workshop 22sqm. Creation of double car port off footpath from a single space, the refurbishment of existing house, including external glass porch to front, rear first floor extension of 9sqm, with minor amendment to ground floor plan at rear, and associate site works.
17, Forth Road, East Wall, Dublin 3
The retention of the existing scrolling internally illuminated double sided 'Metropole' advertising display case mounted on an offset leg.
On the public footpath on the northern side of East Wall Road, adjacent to Aldi and opposite the jun
Construction of a two storey flat roof extension at the rear/side , alteration to existing gable window and formation of additional gable wall windows , new vehicular entrance driveway and front boundary wall and piers , dishing of existing kerb and all associated works.
67 Bargy Road, East Wall, Dublin 3
CHANGE OF USE Aidan Roche of Feel Fit Gym intend to apply for planning permission for development at No. 117b Church Road, East Wall Dublin 3 which also backs onto the adjacent Shelmalier Road. The development will consist of a change of use from existing workshop to a proposed GYM with reception area, the erection of new signage to the front of building and all other ancillary site development works.
Feel Fit Gym, 117b Church Road,, East Wall Dublin 3, which also backs onto the adj Shelmalier Road.
The development will consist of a change of use from existing workshop to a proposed GYM with reception area, the erection of new signage to the front of building and all other ancillary site development works.
117B Church Road, East Wall, Dublin 3
RETENTION: The development consists of a change of use from workshop to a GYM with reception area, the erection of new signage to the front of building and all other ancillary site development works
117B Church Road, East Wall, Dublin 3 which also backs onto the adjacent Shelmalier Road, Dublin 3
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?