← Back to search

21, Ennel Park, Artane, Dublin 5

APPLICATION DECLARED INVA

Planning application WEB1630/22

Dublin - Dublin City Council

Proposed Development

New erection of 7.5ft high x 10.25ft long wall on the boundary from front of no. 21 to rear of no. 19 Ennel Park.

Application Timeline

  1. Application received

    11 Jul 2022

  2. Decision: APPLICATION DECLARED INVA

    12 Jul 2022

  3. Decision due

    2 Sept 2022

Application Details

Location
21, Ennel Park, Artane, Dublin 5
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council

Timeline

Registration Date
11 July 2022
Status
Decision Notice Issued
Decision
APPLICATION DECLARED INVA
Decision Date
12 July 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

3m
WEB1645/22APPLICATION DECLARED INVA13 Jul 2022

New erection of 7.5ft high x 10.25ft long wall on the boundary from front of no 21 to rear of no 19.

21, Ennel Park, Donaghmede, Dublin 5

17m
2417/21APPLICATION DECLARED INVA18 Mar 2021

Permission for provision of new two-storey, 3 bedroom dwelling to the side garden to north-west of No.52, with off-street parking for new dwelling via vehicular entrance to existing dwelling, to be widened to 3.6M. Wall and roof finishes to match that of existing dwelling. Landscaping; boundary treatments; and all associated works to facilitate the development.

52, Ennel Park, Donaghmede, Dublin 5 D05 V2N6

17m
2519/21GRANT PERMISSION1 Apr 2021

Planning permission for provision of new detached two-storey 3-bedroom dwelling to the side garden to north-west of No. 52, with off-street parking for new dwelling via vehicular entrance to existing dwelling, to be widened to 3.6m. Wall and roof finishes to match that of existing dwelling. Landscaping, boundary treatments and all associated works to facilitate the development.

52 Ennel Park, Donaghmede, Dublin 5, D05 V2N6

23m
WEB1285/19APPLICATION DECLARED INVA14 May 2019

Planning Permission for the demolition of an existing attached garage, and the extension of the existing single storey dwelling including a first floor attic conversion with dormer windows to rear and all associated site works.

28, St. Brendan's Park, Coolock, Dublin 5, D05 C2N6

23m
WEB1328/19GRANT PERMISSION30 May 2019

The demolition of an existing attached adjacent garage and rear sunroom, and the extension of the existing single storey dwelling including a first floor attic conversion with proposed dormer windows to rear and roof lights to the front, and all associated site works.

28, St. Brendan's Park, Coolock, Dublin 5, D05 C2N6

38m
4903/23GRANT PERMISSION4 Dec 2023

PERMISSION for extension and alterations to existing single storey house comprising (a) attic conversion to two bedrooms with dormer window to the rear and 3 No. roof lights to the front of the house (b) construction of garage to the side of the house and (c) associated site works, all at 30 St. Brendan's Park, Dublin 5, D05 Y5Y2

30 St. Brendan's Park, Dublin 5, D05 Y5Y2

63m
2822/21GRANT PERMISSION25 May 2021

Planning permission is sought for regularisation of existing attic habitable space to current regulations. The works will include a dormer window construction to the rear (northeast) elevation and 2 no. rooflights to the front (southwest) elevation, single storey extension to the rear with roof glazing and associated site works.

34 St. Brendans Park, Coolock, Dublin 5

75m
WEB1650/23GRANT PERMISSION1 Aug 2023

The development will consist of (1) demolition of hipped lean to roof to the side, (2) construction of a new entrance through a single-story integrated porch to the front (9.6sq.m), and (3) construction a single-story extension to the rear (38.2sq.m). The proposed rear extension will consist of a new kitchen/diner with skylight, utility, wc and bedroom. The development will include a new flat roof to the front, side and rear, internal alteration (ground floor only), landscape, and all ancillary site works and drainage.

34, Ennel Park, Artane, Dublin 5 D05 E3T2

75m
WEB1648/23APPLICATION DECLARED INVA1 Aug 2023

The development will consist of: (1) demolition of hipped lean to roof to the side, (2) construction of a new entrance through a single-story integrated porch to the front (9.6sq.m), and (3) construction a single-story extension to the rear (38.2sq.m). The proposed rear extension will consist of a new kitchen/diner with skylight, utility, wc and bedroom. The development will include a new flat roof to the front, side and rear, internal alteration (ground floor only), landscape, and all ancillary site works and drainage.

34, Ennel Park, Artane, Dublin 5

79m
WEB5852/25APPLICATION DECLARED INVALID3 Dec 2025

Proposed works include conversion of the existing attic space for an additional bathroom and a playroom. Construction of a dormer window to the rear roof plane for increased internal attic room height, and insertion of one Velux roof light to the front roof plane, along with all associated site works

60, Moatfield Avenue, Coolock, D05R2T6

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?