← Back to search

26, Church Avenue, Drumcondra, Dublin 9

GRANT PERMISSION

Planning application WEB1632/21

Dublin - Dublin City Council

Proposed Development

The development of the construction of a new dormer window to the rear slope of the existing roof, with minor internal alterations.

Application Timeline

  1. Application received

    8 Jun 2021

  2. Decision: GRANT PERMISSION

    28 Jul 2021

  3. Decision due

    30 Jul 2021

  4. Grant issued

    8 Sept 2021

Application Details

Location
26, Church Avenue, Drumcondra, Dublin 9
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
73.52 ha

Timeline

Registration Date
8 June 2021
Status
Decision Notice Issued
Decision
GRANT PERMISSION
Decision Date
28 July 2021
Grant Date
8 September 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

32m
WEB5571/25APPLICATION DECLARED INVALID1 Nov 2025

The development will consist of: -The demolition of existing two storey rear extension. -The construction of a new two storey, flat-roof rear extension. -Construction of a rear dormer. -Minor internal alterations to the existing dwelling.

21 Church Avenue, Drumcondra, Dublin 09, D09A4T2

32m
WEB5612/25GRANT PERMISSION6 Nov 2025

The development will consist of: -The demolition of existing two storey rear extension. -The construction of a new two storey, flat-roof rear extension. -Construction of a rear dormer. -Minor internal alterations to the existing dwelling.

21 Church Avenue, Drumcondra, Dublin 9, D09 A4T2

54m
WEB2490/25APPLICATION DECLARED INVALID25 Jun 2025

Sadlier Developments Ltd intend to apply for permission for the development at this site 2A Ormond Road, Drumcondra, Dublin 9, D09EH60 with entrance off the existing access lane from Ormond Road. The development will consist of the construction of two 4 bed two storey plus attic level semi detached houses and the demolition of the existing building on site,formerly in use as a light industrial workshop and latterly used as The Church of Jesus Christ The Redeemer, Christian Community Church, provision of two parking spaces,four bicycle spaces, and all associated site works, site landscaping services and all ancillary development.

2A Ormond Road, Drumcondra, Dublin 9, D09EH60

54m
WEB2542/25GRANT PERMISSION1 Jul 2025

The development will consist of the construction of two 4 bed two storey plus attic level semi detached houses and the demolition of the existing building on site,formerly in use as a light industrial workshop and latterly used as The Church of Jesus Christ The Redeemer, Christian Community Church, provision of two parking spaces,four bicycle spaces, and all associated site works, site landscaping services and all ancillary development.

2A Ormond Road, Drumcondra, Dublin 9, D09EH60 with entrance off the existing access lane from Ormond

55m
4438/24APPLICATION WITHDRAWN9 Dec 2024

Permission for the development at this site 2A Ormond Road, Drumcondra, Dublin 9 DO9 EH60 with entrance off the existing access lane from Ormond_ Road. The development will consist of the construction of two 4 bed two storey plus attic level semi detached houses and the demolition of the existing building on site, The Church of Jesus Christ The Redeemer, Christian Community Church, provision of two parking spaces, four bicycle spaces, and all associated site works, site landscaping services and all ancillary development

2A Ormond Road, Drumcondra, Dublin 9 , D09 EH60

68m
4189/22REFUSE RETENTION PERMISSI10 Jun 2022

Retention permission sought for the permanent retention of existing rooftop plant (including 16 no. condenser units) and the erection of a solid 1.8m high acoustic enclosing screen on the single storey part of existing gym.

Gym at Unit 1, 2 & 3B Whitehall Works, Drumcondra Road Upper, Dublin 9

68m
5138/22APPLICATION DECLARED INVA28 Oct 2022

RETENTION: Planning permission is sought for the permanent retention of existing rooftop plant (including 16no. condenser units) and the erection of a solid 2.5m high acoustic enclosing screen on the single storey part of existing Gym.

Gym at Units 1, 2 and 3B, Whitehall Works, Drumcondra Road Upper, Dublin 9

68m
5226/22GRANT RETENTION PERMISSIO14 Nov 2022

RETENTION PERMISSION of existing rooftop plant (including 16 no. condenser units) and the erection of a solid 2.5m high acoustic enclosing screen on the single storey part of existing gym.

Gym at Units 1, 2 and 3B Whitehall Works, Drumcondra Road Upper, Dublin 9

68m
4069/22APPLICATION DECLARED INVA26 May 2022

Retention permission of existing rooftop plant (including 16 no. condenser units) and the erection of a solid 1.8m high acoustic enclosing screen on the single storey part of existing gym.

Units 1, 2 and 3B, Whitehall Works, Drumcondra Road, Dublin 9

69m
WEB1292/19GRANT PERMISSION16 May 2019

Dublin City Council - Michael Shannon wishes to apply for Planning Permission for a change of use from commercial to residential and the construction of a single two storey, two bedroom infill Dwelling , conversion of ground floor of existing return from office to bedroom and ancillary works to the rear of his property at 92 Upper Drumcondra Road, Drumcondra. Dublin 9, and at 92A Upper Drumcondra Road, Drumcondra. Dublin 9, facing Clonturk Avenue, Drumcondra. Dublin 9 The proposed development will comprise two bedrooms , bathroom ,store, courtyard at ground level with Living , Kitchen and Dining Accommodation and deck balcony at first floor level. The proposed development will include the demolition of the existing single storey brick and render extension to the rear of the property and a change of use from Commercial to Residential and the creation of a courtyard space between the existing front building and proposed new rear building. The ground floor space of the existing return will be converted to a bedroom for the development with minor amendments to external walls. Bicycle storage and bin storage is located within front courtyard and street car parking provided. The principal materials used will be nappe render to street, blue black slates to match existing return , glass and powder coated aluminium windows , glass guarding to balcony , rainwater goods ,painted timber front doors and painted metal railings. Rooflights are located in the roof. Brick is proposed to side and rear of new building.

92 & 92A, Drumcondra Road Upper, and facing Clonturk Avenue, Drumcondra, Dublin 9

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?