← Back to search

201, Hillcrest Park, Ballygall, Dublin 11, D11 D347

GRANT PERMISSION

Planning application WEB2041/24

Dublin - Dublin City Council

Proposed Development

a) Erection of a new gable type roof over existing side extension, b) new tiled canopy and extension to front elevation, c) ground floor extension to rear, d) attic conversion with change of roof type from hipped to gable end roof, including dormer type window to rear & window to side gable e) New roof lights to the front elevation with internal modifications and associated site works.

Application Timeline

  1. Application received

    26 Aug 2024

  2. Further information requested

    16 Dec 2024

  3. Further information received

    25 Feb 2025

  4. Decision: GRANT PERMISSION

    21 Mar 2025

  5. Decision due

    24 Mar 2025

  6. Grant issued

    30 Apr 2025

Application Details

Location
201, Hillcrest Park, Ballygall, Dublin 11, D11 D347
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
260 ha

Timeline

Registration Date
26 August 2024
Status
Decision Notice Issued
Decision
GRANT PERMISSION
Decision Date
21 March 2025
Grant Date
30 April 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

41m
WEB1549/23GRANT PERMISSION3 Jul 2023

The development will consist of a change of roof type from hipped to pitched by raising the gable wall, including a rear roof dormer and a roof light to the front.

153, Hillcrest Park, Glasnevin, Dublin 11 D11 K8R9

41m
WEB1484/23APPLICATION DECLARED INVA8 Jun 2023

The development will consist of a change of roof type from hipped to pitched by raising the gable wall, including a rear roof dormer and a roof light to the front

153, Hillcrest Park, Glasnevin, Dublin 11 D11 K8R9

43m
3118/22GRANT PERMISSION21 Jan 2022

The development will consist of the installation of a 5.41m x 1.10m x 2.30m (LxWxH) above ground enclosure along with access gate and security fence to house a new natural gas District Regulating Installation with all ancillary services and associated site works to replace the existing below ground natural gas regulating unit at the lands of St Kevins College, Ballygall Road East, Finglas, Dublin 11, Co. Dublin.

St. Kevin's College, Ballygall Road East, Finglas, Dublin 11

43m
3018/22APPLICATION DECLARED INVA7 Jan 2022

Permission for the installation of 5.41m x 1.10 x 2.30m ( L x W x H ) above ground enclosure along with access gate and security fence to house a new natural gas District Regulating Installation with all ancillary services and associated site works to replace the existing below ground natural gas regulating unit.

Ballygall Road East, Finglas, Dublin 11

43m
WEB2169/26APPLICATION DECLARED INVALID14 May 2026

Installation of a 5.61m x 1.10m x 2.69m (LxWxH) above ground enclosure along with access gate and security fence to house a new natural gas District Regulating Installation with all ancillary services and associated site works to replace the existing below ground natural gas regulating unit at the lands of St. Kevin's College, Ballygall Road East, Finglas, Dublin 11, Co. Dublin.

Saint Kevin's College, Ballygall Road East, Finglas, Dublin 11

43m
WEB2191/26APPLICATION WITHDRAWN18 May 2026

Installation of a 5.61m x 1.10m x 2.69m (LxWxH) above ground enclosure along with access gate and security fence to house a new natural gas District Regulating Installation with all ancillary services and associated site works to replace the existing below ground natural gas regulating unit at the lands of St. Kevin's College, Ballygall Road East, Finglas, Dublin 11, Co. Dublin.

Saint Kevin's College, Ballygall Road East, Finglas, Dublin 11

44m
WEB1171/24GRANT PERMISSION16 Feb 2024

The development will consist of: a) Erection of a new 2 storey extension over existing side extension, b) new tiled canopy and bay windows to front elevation, c) ground floor extension to rear / New roof to existing garage area d) attic conversion with change of roof type from hipped to gable end roof, including 2No. of dormer type window to rear e) New Vehicular access to front garden, inc.dishing of footpath f) New roof lights to the front elevation with internal modifications and associated site works

152, Hillcrest Park, Dublin 11

44m
WEB1087/24APPLICATION DECLARED INVA30 Jan 2024

a) Erection of a new 2 storey extension over existing side extension, b) new tiled canopy and bay windows to front elevation, c) ground floor extension to rear / New roof to existing garage area d) attic conversion with change of roof type from hipped to gable end roof, including 2No. of dormer type window to rear (e) New Vehicular access to front garden, inc.dishing of footpath f) New roof lights to the front elevation with internal modifications and associated site works

152, Hillcrest Park, Dublin 11, D11 T8F7

60m
2197/21GRANT PERMISSION10 Feb 2021

The development will consist of: dormer roof window to side, dormer roof window to rear and external works and alterations to dwelling.

150 Hillcrest Park, Glasnevin, Dublin 11

106m
3315/21GRANT PERMISSION12 Aug 2021

Planning permission for the development will comprise the construction of 465 sq.m single storey building to the south of the existing school buildings. The new accommodation will include two general classrooms, a science laboratory with prepartion room, an engineering studies classroom with preparation room, toilet facilites and a disabled accessible WC. Site works will include removal of a play area together wth associated landscaping, drainage and all associated site works.

St. Kevin's College, Ballygall Road East, Dublin 11

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?