19a, Herbert Park, Dublin 4, D04 P5Y3
GRANT PERMISSIONPlanning application WEB2115/23
Dublin - Dublin City Council
Proposed Development
Demolition of existing conservatory on the south façade, 3 No. large glazed openings in the south façade incorporating doors to the garden, Removal of chimney on the southern pitched roof, New window to the entrance porch area on the west façade, Upgrade of all the windows and doors replacing the single glazed windows with leaded details to double glazed units, internal modifications, landscape and ancillary works to existing two storey house.
Application Timeline
Application received
18 Dec 2023
Decision: GRANT PERMISSION
19 Feb 2024
Decision due
20 Feb 2024
Grant issued
4 Apr 2024
Application Details
- Location
- 19a, Herbert Park, Dublin 4, D04 P5Y3
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 1408 ha
Timeline
- Registration Date
- 18 December 2023
- Status
- Decision Notice Issued
- Decision
- GRANT PERMISSION
- Decision Date
- 19 February 2024
- Grant Date
- 4 April 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for development consisting of: (i) construction of 1 no. two-storey three-bedroom flat-roofed, with 1 no. rooflight, detached residential dwelling with front/rear garden areas and served by 2 no. pedestrian entrances, via Pembroke Park and Orchard Lane, within the rear garden of No. 20 Pembroke Park; and, (ii) all ancillary works, inclusive of the provision of a bicycle shed, landscaping, boundary treatments and SuDS drainage as necessary to facilitate the proposed development.
20, Pembroke Park, Dublin 4
PERMISSION (i) construction of 1 no. two-storey three-bedroom flat-roofed, with 1 no. rooflight, detached residential dwelling with front/rear garden areas and served by 2 no. pedestrian entrances, via Pembroke Park and Orchard Lane, within the rear garden of No. 20 Pembroke Park; and, (ii) all ancillary works, inclusive of the provision of a bicycle shed, landscaping, boundary treatments and SuDS drainage as necessary to facilitate the proposed development.
20, Pembroke Park, Dublin 4
PROTECTED STRUCTURE : The development consists of the demolition of a late 20th century extension to the rear , reconfiguration of ground floor wall openings to accomodate construction of a new open plan rear extension layout , enclosing a small garden space , extension includes a new rear hall with guest toilet , utility , leading to the flat roofed kitchen , pitched hip roofed living and dining space overlooking the rear garden , full width of the site . Celestory windows above the east boundary wall to the Orchard laneway , along the side of the house . Roof lights to kitchen , living area , with solar panels on the pitch roofed return , rear facing dormer and roof light to the attic floor , associated alterations to the garden wall facing the laneway . Repointing of the cement joints to the facades and re-tiling of the red clay tile roof and all associated site and ancillary works .
17 Herbert Park, Dublin 4
PROTECTED STRUCTURE: alterations to ground floor areas to the rear of the existing property including the extension of the utility room by 1.9m2, removal of existing pitched roof structures, modifications to external windows and doors, thermal upgrade works including external insulation, internal demolitions and ancillary site works.
15, Herbert Park, Dublin 4, D04 P6PO
PROTECTED STRUCTURE: The works will comprise alterations to ground floor areas to the rear of the existing property including the extension of the utility room by 1.9m2, removal of existing pitched roofs and replacement with flat roof structures with 2 no. roof lights to the rear, modifications to external windows and doors, thermal upgrade works including external insulation, internal demolitions and ancillary site works.
15, Herbert Park, Dublin 4, D04 P6P0
The provision of a new switch room with ancillary store and a new sprinkler/tank room, both adjoining the existing entrance lobby, replacement of a balustrade on the lobby roof, along with new landscaping and surface water drainage infrastructure.
Ardoyne House, Pembroke Park, Dublin 4, D04 F3C3
This development will consist of construction of new hard standing area of approx. 430 sqm to provide 19 no. car parking spaces to the south east of Ardoyne House Building in order to accommodate parking spaces displaced due to fire safety requirements.
Ardoyne House, Pembroke Park, Dublin 4, D04 F3C3
Protected Structure: The development will consist of the following works: Demolition of single storey extensions to side and rear. Construction of the following: single storey extension to north side and east (rear), comprising kitchen and living room, first floor extension to north side comprising two bathrooms, two storey extension to south side comprising study and bathroom, boiler house and garden store with ancillary garden works. Alterations to brick parapet walls to rear second floor balcony, internal alterations including provision of new service installations and making good to existing fabric and finishes.
Milverton, 34 Herbert Park, Ballsbridge, Dublin 4
The proposed development will consist of the change of use of 28A Clyde Lane from residential to ancillary educational use associated with St. Conleth's College. The change of use will include associated alterations to the building, including the closing up of windows and doorway in the southern facade, the provision of a doorway and windows to the western facade, and the provision of a window to the eastern facade. The development also includes landscaping, and all associated ancillary works.
28A, Clyde Lane, Dublin 4
The development consists of Demolition and removal of - existing single storey extension to rear. - mono-pitch glazed shelter along north boundary. - existing side gate. - existing chimney on 2-storey return. Construction of - new single storey extension containing kitchen and family room to rear (54sqm) with roof light and solar panels. - new enlarged dormer to rear roof (+2.6sqm). - new side gate in new location. - new trellis to front garden of house at boundary with 30 Herbert Park. - new roof light to front roof. Alterations to existing house to include - new external insulation to side and rear. - upgrading and remodelling of existing internal layout. - new windows, facade repairs and re-roofing (to match existing). - new hard and soft landscaping, new drainage and ancillary works to front and rear gardens. - alterations to existing front boundary wall and railings to provide for widening and automation of existing vehicular access gate.
1, Argyle Road, Donnybrook, Dublin 4, D04 C3C8
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?