7, Marne Villas, Phibsborough, Dublin 7, D07 P7R9
GRANT RETENTION PERMISSIOPlanning application WEB2409/24
Dublin - Dublin City Council
Proposed Development
RETENTION: Retention of Change-of-Use from Residential Dwelling to Social & Community based Resource Centre
Application Timeline
Application received
31 Oct 2024
Further information requested
18 Dec 2024
Further information received
19 Mar 2025
Decision: GRANT RETENTION PERMISSIO
14 Apr 2025
Decision due
15 Apr 2025
Grant issued
19 May 2025
Application Details
- Location
- 7, Marne Villas, Phibsborough, Dublin 7, D07 P7R9
- Applicant
- N/A
- Application Type
- Retention Permission
- Planning Authority
- Dublin City Council
- Site Area
- 190 ha
Timeline
- Registration Date
- 31 October 2024
- Status
- Decision Notice Issued
- Decision
- GRANT RETENTION PERMISSIO
- Decision Date
- 14 April 2025
- Grant Date
- 19 May 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
i) Removal of existing fence on site and partial removal of existing boundary walls to Rathdown Road and the adjoining unnamed laneway. ii) Construction of a part single, part three-storey, four bedroom, flat roofed detached dwelling served by private amenity space, in the form of garden space to the front and rear at ground floor level and an external terrace off the south elevation at first floor level. iii) Provision of 1 no. roof light and 2 no. new pedestrian entrances to the front and rear via Rathdown Road and the adjoining unnamed laneway respectively. iii) All ancillary works, inclusive of landscaping, boundary treatments and drainage, necessary to facilitate the development.
A 0.0168 hectare site located to the immediate south of No. 71 Rathdown Road, Dublin 7
PERMISSION & RETENTION: We, Technological University Dublin (TU Dublin) intend to apply for permission and retention permission for development at this site: at a warehouse to the north of The Clock Tower (a Protected Structure, RPS Ref. 3288), Grangegorman Lower, Dublin 7. The site is located within the overall Grangegorman Strategic Development Zone (SDZ) of c. 28.69 ha at Grangegorman, Dublin 7. There are several Protected Structures within the Grangegorman SDZ. The temporary development will consist of: A) Retention permission for works comprising of: 1. Metal corrugated cladded gable end (east elevation) to enclose a warehouse of 835 sq.m GFA (original warehouse partially demolished under Reg.Ref. 3336/12; reducing from c. 2,018 sq.m to 835 sq.m GFA). B) Permission for works comprising of: 1. Refurbishment works to an existing warehouse consisting of: i) Replacement of the existing asbestos cladding on the north, south and west elevation with a new metal corrugated cladding facade; ii) Blocking up of existing roller shutter doors and selected pedestrian doors and windows on the north and west elevations with matching brickwork infill; iii) Inclusion of new pedestrian doors on the north and east elevations; iv) Inclusion of a vehicular access roller shutter door on the east elevation; v) Replacement of 15 no. clear cladding panels on the south elevation with clear GRP panels; vi) Replacement of 2 no. existing roof lights with clear GRP panels; vii) Replacement of the existing gutters, RWPs and drip trays with similar new versions; and viii) Erection of lighting and CCTV cameras on the exterior of the warehouse facing into the associated yards. 2. Other works comprising of: i) Provision of 3 no. standalone compactor units; and ii) Inclusion of a perimeter fence and vehicular access gate. 3. All associated site development works and services on a site of c. 0.215 ha.
Site to the north of The Clock Tower, Grangegorman Lower, Dublin 7
PROTECTED STRUCTURE: RETENTION & PERMISSION: The development will consist of: Retention of the constructed 648m sq. two storey modular structure that forms the Dublin Bus Central Control and Operation Depot Building, granted under permission 3405/14 for a further five years. Permission to construct a two storey modular building extension of 144m sq. to the structure to be retained for the same five year period. This extension was previously approved under permission 3485/17. The proposed structures are within the curtilage of Protected Structure, RPS 2029.
Broadstone Bus Depot, Dublin 7
PERMISSION & RETENTION: PROTECTED STRUCTURE: The development will consist of: Retention of the constructed 648 sq. modular structure that forms the Dublin Bus Central Control and Operation Depot Building, granted under permission 2405/14 for a further five years. Permission to construct a modular building extension of 144sq. to the structure to be retained for the same five year period. This extension was previously approved under permission 3485/17. The proposed structures are within the curtilage of Protected Structure, RPS 2029.
Broadstone Bus Depot, Dublin 7
PROTECTED STRUCTURE : The development will consist of Retention of the constructed 648sqm two storey modular structure that forms the Dublin Bus Central Control and Operation Depot Building (CC&OB) CC&OB granted under permission 2405/14 and 3077/19 for a further five years. The existing structure is within the curtilage of Protected Structure, RPS 2029.
Broadstone Bus Depot, Dublin 7
PROTECTED STRUCTURE (RPS NO. 3288). Located within the Grangegorman Strategic Development Zone (SDZ). The development will consist of improvement works including: 1)Raking out of existing cementitious pointing to rubble stone and brick walls and repointing in lime, repairs to stonework, brickwork, stone window cills and window reveals on the north facade of the Link Building and the west facade of the East Building; 2)Removal of existing cementitious render and replacement with new lime render, repairs to stonework, brickwork, stone window cills and window reveals on the north and east facades of the East Building, north and east facades of the Chapel Building and all facades of the single storey block to the south of the Chapel Building; 3)Removal of 6 no. roller shutters to ground floor windows on the west elevation of the East Building; and 4)Repairs to existing temporary mesh to windows.
The Clock Tower Building, Grangegorman Lower, Dublin 7
PROTECTED STRUCTURE : Dublin Bus Broadstone Bus Depot, Constitution Hill, Dublin 7, The proposed structure is within the curtilage of Protected Structure, RPS 2029. The development will consist of a free standing single storey ESB Sub-Station and MV/LV switch rooms ( approx. 56 sq m ) to the side boundary of the site, (western side) and all associated site works.
Broadstone Bus Depot, Constitution Hill, Dublin 7
PROTECTED STRUCTURE: Permission for development at this site Broadstone Bus Depot, Constitution Hill, Dublin 7. The proposed structure is within the curtilage of Protected Structure, RPS 2029. The development will consist of a free standing single storey ESB Sub-Station and MV/LV switch rooms ( approx. 56 sq m ) to the side boundary of the site, (western side) and all associated site works.
Broadstone Bus Depot, Constitution Hill, Dublin 7
Proposed vehicular access driveway to front garden, through on-street parking with associated site development works, for the purpose of providing an off-street car parking space for charging an electric vehicle.
57, Rathdown Road, Grangegorman, Dublin 7
PROTECTED STRUCTURE: PERMISSION:The development will consist of conversion of three adjacent existing buildings within the overall Broadstone site, the buildings are proposed to be converted to offices and a training centre facility. The three existing buildings are the Furniture Stores, Unit stores and Training Centre. The Furniture Stores and Unit Stores will be converted to office use on the ground and new mezzanine floors. The development will also consist of internal conversion to Training Centre building to provide additional meeting room and office accommodation. Permission is also sought for all related site works and services works associated with the developments. Broadstone Station terminal building including Broadstone Bus Depot and its curtilage and features are designated Protected Structures under the Dublin City Development Plan 2022-2028 (reference 2029). This application seeks permission for the following interventions: Conversion of Furniture Stores and Unit Stores building into one office accommodation with a total floor area of 4073 m2 on ground and new mezzanine level. Conversion of Training Centre to accommodate additional training facilities with a proposed additional floor area of 1097 m2 on ground and new mezzanine level, in addition to the existing training centre area of 480 m2 Provision of new roof covering and repairs to original roof structure in Furniture Stores, Units Stores and Training Centre building. Repair works to existing external steel windows to include new internal secondary glazing. Repair works to existing timber sash windows in Unit Stores. Removal of existing 20th century concrete mezzanine in Furniture Stores. Insertion of a new glazed doors and windows into pre-existing openings. Forming new openings for proposed windows to rear brick East elevation of Furniture Stores. Forming the new openings for new ventilation and services arrangements. Forming a new courtyard with landscaping between the Training Centre Building and Furniture Stores, Construction of an architectural brick screen with glazed canopy to enclose the courtyard. Reinstatement of a pitched roof over the approach to proposed courtyard with a footprint of 129 m2. Provision of 26 new car parking spaces. Provision 56 bicycle spaces and 4 motorbike spaces. Provision of mechanical plant area at the rear of unit stores.
Broadstone Bus Depot, Constitution Hill, Dublin 7
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?