← Back to search

26, Killester Park, Killester, Dublin 5

APPLICATION DECLARED INVA

Planning application WEB2621/24

Dublin - Dublin City Council

Proposed Development

Change of operation from both all day and afterschool to entirely all day for the existing childcare facility. No increase in the number of children availing of the service is envisaged.

Application Timeline

  1. Application received

    29 Nov 2024

  2. Decision: APPLICATION DECLARED INVA

    4 Dec 2024

  3. Decision due

    31 Jan 2025

Application Details

Location
26, Killester Park, Killester, Dublin 5
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
40 ha

Timeline

Registration Date
29 November 2024
Status
Decision Notice Issued
Decision
APPLICATION DECLARED INVA
Decision Date
4 December 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
WEB2649/24GRANT PERMISSION5 Dec 2024

Change of operation from both all day and afterschool to entirely all day for the existing childcare facility. No increase in the number of children availing of the service is envisaged.

26, Killester Park, Killester, Dublin 5

0m
3297/20GRANT RETENTION PERMISSIO2 Sept 2020

RETENTION: The development will consist of the retention permission for construction of a 23.0m2 single storey timber clad structure at the rear of 26 Killester Park for the use as after school childcare and the proposed use of the same structure for pre school childcare.

26, Killester Park, Killester, Dublin 5

82m
5012/22GRANT PERMISSION10 Oct 2022

The development will consist of the demolition of a domestic garage and rear extension and the construction of an extension, part two storey and part single storey, to the side and rear inclusive of a balcony over rear ground floor extension with reconstruction and revised layout of the existing residence.

2, Killester Park, Clontarf West, Dublin 5

82m
4793/22APPLICATION DECLARED INVA7 Sept 2022

The development will consist of the demolition of a domestic garage and rear extension and the construction of an extension , part two storey and part single storey to the side and rear inclusive of reconstruction, and revised layout of the existing residence.

2, Killester Park, Clontarf West, Dublin 5

83m
WEB1538/25GRANT PERMISSION13 Mar 2025

Planning permission for new Porch extension to front of existing house.

7, Killester Park, Killester, Dublin 5 , D05C2H1

87m
3461/19GRANT PERMISSION10 Jul 2019

Planning permission is sought for the construction of a flat roofed extension to the rear of the ground floor and a first-floor pitched roofed extension to the front rear and side of the existing bungalow (approved under Reg. Ref. 4659/05) to provide an additional bedroom resulting in a part single, part two storey, two bedroom dwelling, with landscaping, boundary treatments and all ancillary works necessary to facilitate the development. The proposed extension and existing dwelling will be finished in a smooth render finish, aluclad windows and doors.

65a, Killester Park, Killester, Dublin 5, D05 K229

88m
2264/19REFUSE PERMISSION13 Feb 2019

Planning permission for the construction of a contemporary first-floor flat roofed extension to the front, rear and side of the existing bungalow (approved under Reg. Ref. 4659/05) to provide an additional two bedrooms resulting in a two storey, three bedroom dwelling, with landscaping, boundary treatments and all ancillary works necessary to facilitate the development. The proposed extension and existing dwelling will be finished in a smooth render finish with aluclad windows and doors.

65a, Killester Park, Killester, Dublin 5, D05 K229

94m
WEB1537/22APPLICATION DECLARED INVA7 Jun 2022

The development will consist of a two-story extension to the rear comprising: kitchen, bathroom and corridor at ground floor level and bedroom, bathroom and corridor at first floor level. New windows at first floor level facing south, north and east with glazing design preventing views to east and north; windows at ground floor level facing south, north and east. The development includes a courtyard garden facing the east boundary. The rear extension has been designed to limit overall height by following the existing level changes onsite; the proposed extension eaves will be approximately 0.82 meters below existing eaves height, the extension roof ridge will be 1.7 meters below the existing roof ridge and the extension ground floor will be approximately 1 meter below existing ground floor level.

114, Killester Avenue, Killester, Dublin 5

94m
WEB1782/22REFUSE PERMISSION25 Aug 2022

The development will consist of a two-story extension to the rear comprising: kitchen, bathroom and corridor at ground floor level and bedroom, bathroom and corridor at first floor level. New windows at first floor level facing south, north and east with glazing design preventing views to east and north; windows at ground floor level facing south, north and east. The development includes a courtyard garden facing the east boundary. The rear extension has been designed to limit overall height by following the existing level changes onsite; the proposed extension eaves will be approximately 0.82 meters below existing eaves height, the extension roof ridge will be 1.7 meters below the existing roof ridge and the extension ground floor will be approximately 1 meter below existing ground floor level.

114, Killester Avenue, Dublin 5 D05 XT63

94m
WEB1425/22APPLICATION DECLARED INVA9 May 2022

The development will consist of a two-story extension to the rear comprising: kitchen, bathroom and corridor at ground floor level and bedroom, bathroom and corridor at first floor level. New windows at first floor level facing south, north and east with glazing design preventing views to east and north; windows at ground floor level facing south, north and east. The development includes a courtyard garden facing the east boundary. The rear extension has been designed to limit overall height by following the existing level changes onsite; the proposed extension eaves will be approximately 0.82 meters below existing eaves height, the extension roof ridge will be 1.7 meters below the existing roof ridge and the extension ground floor will be approximately 1 meter below existing ground floor level.

114, Killester Avenue, Dublin 5 D05 XT63

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?