163, Raheen Park, Cherry Orchard, Dublin 10
Registered ApplicationPlanning application WEB2632/26
Dublin - Dublin City Council
Proposed Development
The development will consist of the construction of a new two-storey, three-bedroom end-of-terrace dwelling to the side of the existing dwelling, with a new vehicular entrance to the front, new boundary walls and all associated site works.
Application Timeline
Application received
1 Jul 2026
Decision due
25 Aug 2026
Application Details
- Location
- 163, Raheen Park, Cherry Orchard, Dublin 10
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 400.95 ha
- Residential Units
- 1
Timeline
- Registration Date
- 1 July 2026
- Status
- Registered Application
- Decision
- Pending
- Decision Due
- 25 August 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Single storey extension at side and associated site works.
139, Cloverhill Road, Ballyfermot, Dublin 10, D10 W218
Planning permission for single storey extension to side and associated site works.
139 Cloverhill Road, Ballyfermot, Dublin 10
PERMISSION & RETENTION: Permission for development at this site at Unit S3A & Unit 2 of S3B, Henry Road & Friel Avenue, Parkwest Business Park, Dublin 12. The development for permission will consist of: construction of an ESB substation adjacent to the northern elevation (facing Freil Avenue) of Unit S3A and Unit 2 of S3B of 7.58m in length, 4.35 m in width and 2.975 m in height; The development for retention permission consists of: • Retention of certain aspects previously granted under permission reference 3140/20 but developed in an alternate manner, namely: • Altered location, type and size of 2 no. weighbridges; • Altered location of signage, including new signage, and height of roller shutter door on southern elevation (facing Henry Road); • Location, number and height of roller shutter doors on northern elevation (facing Freil Avenue); • Continued use of portion of floor area of 456 m2 of Unit S3A within the facility authorised under waste facility permit WFP-DC-20-0055-01 which was granted permission under 3140/20 for a maintenance shed extension from Unit 2 of S3B that has not been developed.
Unit S3A & Unit 2 of S3B, Henry Road & Friel Avenue, Parkwest Business Park, Dublin 12
The development will consist of: (i) Converting the attic space to a home office/study with dormer window to the rear; (ii) A new roof window to the front of the house and (iii) New stair access from the upper floor landing and all associated internal and drainage works.
86A Croftwood Green, Cherry Orchard, Dublin 10
New Two story 3 bedroom detached house with dropped kerb for vehicular access
Plot Adjacent 1, Raheen Drive, Cherry Orchard, Dublin 10, D10 TD96
The development will consist of: new two storey 3 bedroom detached house with dropped kerb for vehicular access.
Plot Adjacent 1, Raheen Drive, Cherry Orchard, Dublin 10, D10 TD96
RETENTION: Retention Permission to retain the 29.5m2 rear shed for use as gym incidental to the enjoyment of the house at 18 Clifden Terrace, Ballyfermot, Dublin 10.
18, Clifden Terrace, Ballyfermot, Dublin 10
RETENTION: Retention Permission to retain the 29.5 m2 rear shed for use as gym incidental to the enjoyment of the house.
18, Clifden Terrace, Ballyfermot, Dublin 10
Added rear extension to the existing annex converting it into a self contained granny flat. The extension will provide a new kitchen and living/dining area with rear access to the garden. Refurbishment of the existing annex into a bedroom with walk-in wardrobe and upgraded bathroom. Elevational alterations to the rear of the existing house extension. All of the above to include all associated ancillary site works at the above address.
25, Raheen Park, Ballyfermot, Dublin 10
I, Paul Byrne Intend to apply for permission for the development at this site, 25 Raheen Park, Cherry Orchard, Dublin 10, D10 CD70, The development will consist of a first floor extension above existing single storey extension to the side of the house and new hipped roof for attic storage. All of the above to include all associated ancillary site works at the above address.
25, Raheen Park, Cherry Orchard, Dublin 10
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?