596, Collins Avenue Extension, Whitehall, Dublin 9

APPLICATION DECLARED INVALID

Planning application WEB5086/25

Dublin - Dublin City Council

Proposed Development

Planning Permission is sought for: 1/ Removal of existing chimney. 2 Conversion of existing attic to storage area, with 2no. new velux rooflights to front, new dormer window, and new Velux rooflight to rear, and all associates site works at 596 Collins Avenue Extension, Whitehall, Dublin 9. D09 A02B signed Edel Aherne.

Application Timeline

  1. Application received

    9 Sept 2025

  2. Decision: APPLICATION DECLARED INVALID

    10 Sept 2025

  3. Decision due

    3 Nov 2025

Application Details

Location
596, Collins Avenue Extension, Whitehall, Dublin 9
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
237.01 ha

Timeline

Registration Date
9 September 2025
Status
Decision Notice Issued
Decision
APPLICATION DECLARED INVALID
Decision Date
10 September 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
WEB5165/25APPLICATION DECLARED INVALID17 Sept 2025

Planning Permission is sought for: 1/ Removal of existing chimney. 2 Conversion of existing attic to storage area, with 2no. new velux rooflights to front, new dormer window, and new Velux rooflight to rear, and all associates site works at 596 Collins Avenue Extension, Whitehall, Dublin 9. D09 A02B signed Edel Aherne.

596 Collins Ave Extension, Whitehall, Dublin, D09 A028

0m
WEB5355/25GRANT PERMISSION9 Oct 2025

Planning Permission is sought for: 1/ Removal of existing chimney. 2 Conversion of existing attic to storage area, with 2no. new velux rooflights to front, new dormer window, and new Velux rooflight to rear, and all associates site works.

596, Collins Avenue Extension, Whitehall, Dublin 9

53m
4969/23APPLICATION DECLARED INVA14 Dec 2023

RETENTION:The development will consist of the retention on a temporary basis of the previously permitted temporary site entrance (DCC Reg. Ref. 4179/16) on the Collins Avenue frontage at Dublin City University to facilitate access/egress of construction traffic on a limited and managed basis for the duration of the upcoming construction of the permitted Student Accommodation (ABP Reg. Ref. 305405-19) on DCU Glasnevin Campus which runs until 2028 and other planned developments on the campus subject to planning approval during this time.

Dublin City University, Glasnevin Campus, Collins Avenue Extension, Dublin 9, D09 W6Y4.

53m
3022/24GRANT RETENTION PERMISSIO9 Jan 2024

RETENTION The development will consist of the retention on a temporary basis of the previously permitted temporary site entrance (DCC Reg. ref 4179/16) on the Collins Avenue frontage at Dublin City University to facilitate access/egress of construction traffic on a limited and managed basis for the duration of the upcoming construction of the permitted Student Accommodation (ABP Reg. Ref. 305405-19) on DCU Glasnevin Campus which runs until 2028 and other planned developments on the campus subject to planning approval during this time.

Dublin City University, Glasnevin Campus, Collins Avenue Extension, Dublin 9, D09 W6Y4

61m
3506/21GRANT RETENTION PERMISSIO15 Sept 2021

RETENTION: Planning permission is sought for retention of a two storey extension to rear, a porch extension to the fore, the conversion of attic to a storage room, with 2 no. rooflights to the fore of the existing semi-detached dwelling house with associated site works.

580, Collins Avenue Extension, Glasnevin, Dublin 9, D09 RD76

69m
3143/21GRANT PERMISSION13 Jul 2021

The development will consist of the construction of a single storey extension to the rear, and a new porch, canopy and bay window with doors to front with associated works.

34, Crestfield Avenue, Whitehall, Dublin 9

114m
WEB1077/23APPLICATION DECLARED INVA3 Feb 2023

Single storey extension at back of house (c. 15m²)

566, Collins Avenue Extension, Dublin 9 D09 YE28

114m
WEB1287/25GRANT PERMISSION14 Feb 2025

The development will consist of: (i) Demolition of the existing single-storey, vacant building on-site and associated shed structure to the south-west; (ii) construction of a 5 to 6 storey building, containing a total of 67 no. apartments which are all one-bedroom social housing units for older persons. The proposed development will be provided in association with FOLD Housing, an Approved Housing Body (AHB). Private amenity space to serve each apartment is provided in the form of a balcony/terrace and landscaped communal open space is provided in the form of a roof terrace. Internal communal amenity space for residents is provided at ground floor level in the form of a multifunctional room, a shared dining/function room, a kitchenette and tea station, a healthcare/wellness consultation room, an exercise room, a meeting room and a reception area. The proposed development will also include: (iii) provision of a new junction entrance to the site (pedestrian and vehicular access) off Collins Avenue Extension to the north including associated upgrade works to the existing footpath and cycle lane at this location; (iv) provision of revised boundary treatments; (v) provision of 7 no. car parking spaces (including 1 no. accessible parking space and 5 no. EV car charging points), 14 no. resident bicycle parking spaces (including 2 no. adapted bicycle parking spaces), and 14 no. staff and visitor bicycle parking spaces; (vi) provision of landscaped open space, including pedestrian paths, outdoor seating, planting and exercise equipment; (vii) construction of a replacement single-storey shed structure in the southern section of the site for use by the adjoining school; (viii) and all associated development works necessary to facilitate the proposal including, drainage, landscaping, boundary treatments, bin storage, plant and lighting.

a 0.306 hectare site located to the west of St. Aidan's CBS Secondary School,, Collins Avenue Extension, Dublin 9

139m
2380/20APPLICATION DECLARED INVA28 Feb 2020

The development will consist/consists of: the demolition of an existing single storey garage attached to existing semi-detached two storey house. Subdivision of existing site for the construction of a detached two storey house, utilisation of existing vehicular entrance, shared common and parking area to the front of existing and proposed house and all associated site works.

68, Crestfield Drive, Whitehall, Dublin 9

139m
2549/20GRANT PERMISSION23 Mar 2020

The development will consist of: The demolition of an existing single storey garage attached to existing semi-detached two storey house, sub-division of existing site for the construction of a 3 bedroom detached two storey house, utilisation of existing vehicular entrance, shared common and parking area to the front of existing and proposed house and all associated site works.

68, Crestfield Drive, Whitehall, Dublin 9

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?