Gaelscoil Bharra, Faussagh Avenue, Cabra, Dublin 7
APPLICATION DECLARED INVAPlanning application WEB5146/21
Dublin - Dublin City Council
Proposed Development
RETENTION: The development consists of the erection of a temporary single storey timber structure circa 25m2 with a pitched roof, located at the gable end of the South Elevation of the existing school.
Application Timeline
Application received
26 Nov 2021
Decision: APPLICATION DECLARED INVA
30 Nov 2021
Decision due
28 Jan 2022
Application Details
- Location
- Gaelscoil Bharra, Faussagh Avenue, Cabra, Dublin 7
- Applicant
- N/A
- Application Type
- Retention Permission
- Planning Authority
- Dublin City Council
- Site Area
- 2100 ha
Timeline
- Registration Date
- 26 November 2021
- Status
- Decision Notice Issued
- Decision
- APPLICATION DECLARED INVA
- Decision Date
- 30 November 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
RETENTION: The development consists of the erection of a temporary single storey timber structure circa 25m2 with a pitched roof, located at the gable end of the South Elevation of the existing school.
Gaelscoil Bharra, Faussagh Avenue, Cabra, Dublin 7 D07 CF72
Permission for a proposed first floor side extension (on top of existing ground floor extension) to provide an additional bedroom/bathroom.
196, Quarry Road, Cabra, Dublin 7
New vehicular access with new piers, gates, & footpath dishing to proposed access with associated site works.
134, Quarry Road, Cabra, Dublin 7
Planning permission for new vehicular entrance and off street car parking to front garden and all associated site works.
59, Annaly Road, Cabra, Dublin 7
Planning permission sought to create a vehicular access including all associated site.
27 Faussagh Road, Dublin 7, D07W1H1
The construction of a vehicular entrance, driveway with permeable paving, and dished entrance.
43, Erris Road, Cabra, Dublin 7
Change of existing pedestrian entrance to provide new driveway opening and dished footpath.
43, Erris Road, Cabra, Dublin 7 D07 XD52
The creation of a vehicular entrance, driveway with permeable paving, and dished entrance at front of premises exiting on to Erris Road.
43, Erris Road, Cabra, Dublin 7 D07 XD52
The extension of the first floor, to include , 1 no. bedroom en-suite and a study room. and all associated site development works.
96A Quarry Road, Cabra, Dublin 7, D07P7NF2
The extension of the first floor, to include , 1 no. bedroom en-suite and a study room. and all associated site development works.
96a Quarry Road, Cabra, Dublin 7, D07 P7NF2
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?