19 Spire View, Dublin 7

APPLICATION WITHDRAWN

Planning application WEB5708/25

Dublin - Dublin City Council

Proposed Development

Planning permission for attic conversion with dormer to rear roof to accommodate stairs to allow access to attic conversion as non habitable storage space with roof windows to fron , Gable window to side all with associated ancillary works

Application Timeline

  1. Application received

    19 Nov 2025

  2. Decision: APPLICATION WITHDRAWN

    1 Dec 2025

  3. Decision due

    22 Jan 2026

Application Details

Location
19 Spire View, Dublin 7
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
210.34 ha

Timeline

Registration Date
19 November 2025
Status
Decision Notice Issued
Decision
APPLICATION WITHDRAWN
Decision Date
1 December 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
WEB5918/25GRANT PERMISSION10 Dec 2025

Planning permission for attic conversion with dormer to rear roof to accommodate stairs to allow access to attic conversion as non habitable storage space with roof windows to front , Gable window to side all with associated ancillary works.

19 Spire View, Dublin 7, D07 Y5A0

35m
4197/23GRANT PERMISSION21 Jul 2023

Planning permission is sought for attic conversion for study / storage use, raising of gable end to change roof profile with dormer projecting window to rear and all associated site works.

9, Spire View, Riverston Abbey, Navan Road, Dublin 7

46m
WEB1910/20APPLICATION DECLARED INVA7 Dec 2020

The development consists of an attic conversion with alterations to the existing tiled roof, a new dormer roof extension with windows to the rear, internal alterations to layout, new internal stairs, roof lights to the front & side of the existing roof and all associated site works.

26, Spire View, Riverston Abbey, Navan Road, Dublin 7

46m
WEB1930/20GRANT PERMISSION11 Dec 2020

The development consists of an attic conversion with alterations to the existing tiled roof, a new dormer roof extension with windows to the rear, internal alterations to layout, new internal stairs, roof lights to the front & side of the existing roof and all associated site works.

26 Spire View, Riverston Abbey, Navan Road, Dublin 7

68m
3191/24APPLICATION DECLARED INVA13 Feb 2024

RETENTION: Retention and Completion of a New Ball Catch system to include 10 no. 15m high netting poles to previously granted GAA Pitch reference 3528/23.

St. Dominic's College, Ratoath Road, Dublin 7, D07NX47

68m
3379/24GRANT PERMISSION AND RETE14 Mar 2024

Retention and Completion of a New Ball Catch system to include 10 no. 15m high netting poles to previously granted GAA Pitch reference 3528/23.

St Dominic's College, Ratoath Road, Dublin 7, D07 NX47

68m
3397/24GRANT PERMISSION19 Mar 2024

PERMISSION is sought for the introduction of a New Access gateway into the Existing Boundary Wall to Abbey Drive, to serve as Student Access to the new pathway and Existing Avenue adjacent to the all-weather GAA pitch together with all ancillary work including resurfacing and pathway lighting. The proposed gateway to be open only between the hours of 7am and 7pm daily at St Dominic’s College, Ratoath Road, Dublin 7, D07 NX47 by the Board of Management of St. Dominic’s College, Cabra, Dublin 7.

St Dominic's College, Cabra, Dublin 7, D07 NX47

69m
3445/23APPLICATION DECLARED INVA24 Mar 2023

Permission is sought for the upgrading of 1 no. existing GAA playing pitch to a new synthetic playing surface, the erection of 6 no. 18 meter high lighting poles to illuminate the GAA pitch and ancillary works including drainage and fencing.

St. Dominic's College, Cabra, Dublin 7, D07 NX47

69m
3528/23GRANT PERMISSION6 Apr 2023

Permission is sought for the upgrading of 1 no. existing GAA playing pitch to a new synthetic playing surface, the erection of 6 no. 18 meter high lighting poles to illuminate the GAA pitch and, ancillary works including drainage and fencing.

St. Dominics College, Ratoath Road, Cabra, Dublin 7

69m
3105/24APPLICATION DECLARED INVA26 Jan 2024

Permission is sought for the introduction of a new access gateway into the existing boundary wall to Abbey Drive, to serve as student access to the new pathway and existing avenue adjacent to the all-weather GAA pitch together with all ancillary work including resurfacing and pathway lighting. The proposed gateway to be opened only between the hours of 7am and 7pm daily at St Dominic's College, Ratoath Road, Dublin 7. D07 NX47.

St. Dominics College, Cabra, Dublin 7, D07 NX47